HIM 520 Module 8 Policy Short Paper Example

Reviewed by Delia Ravenscroft, MSN, RN

This HIM 520 Module 8 Policy Short Paper sample shows how a health information leader revises an outdated policy, using remote work as the example. It is written for SNHU HIM 520 (HIM-520), where MS Health Information Management students learn to develop and revise the policies that guide their departments. At the composite three-hospital system in central Tennessee, the remote work policy was written in 2019 for occasional telework, yet about 70% of the department now works from home. The paper walks through the policy life cycle, identifies gaps in eligibility, privacy and security, timekeeping, equipment, work across state lines and team connection, explains how staff and reviewers shaped the revision, presents the revised provisions and describes communication, training and review, drawing on research about remote work, cybersecurity and turnover.

CourseHIM 520 Leading as a HIM Professional
ModuleModule 8
Paper typegraduate paper on revising a department policy through its full life cycle
LengthAbout 1,000 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Health Information Management
UpdatedSeptember 2026

Free sample paper for HIM 520 Module 8

1

A Policy Written for Occasional Telework: Revising Sycamore Bend's Remote Work Policy for a Mostly Remote HIM Department

[Student Name]

Southern New Hampshire University

HIM 520: Leading as a HIM Professional

Module Eight Short Paper

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe title names the mismatch between the old policy and current practice.
2

A Policy Written for Occasional Telework: Revising Sycamore Bend's Remote Work Policy for a Mostly Remote HIM Department

Sycamore Bend Health's remote work policy is two pages long and was written in 2019, when a few coders worked from home one or two days a week. Today about 92 of the health information department's 132 staff work mostly or entirely from home, including coders, record completion staff and release of information specialists from three former hospitals. The policy no longer describes how work is actually done, and it says nothing about several risks that matter now. This paper revises it, following the steps a policy should go through.

What this page is doingThe introduction shows how far practice has outgrown the policy.
3

The Policy Life Cycle

Good policies move through a cycle: a need is identified, information and input are gathered, a draft is written, reviewers with the right expertise check it, leaders approve it, staff are told and trained, compliance is monitored and the policy is reviewed on a set schedule. The 2019 policy skipped the last step; it had no review date, which is how it fell so far behind practice. The revision follows each step and adds an annual review.

What this page is doingThe steps of the policy life cycle are outlined.
4

Gaps in the Current Policy

A comparison of the policy with current practice revealed six gaps. Eligibility is undefined, so each former hospital decided differently who could work remotely. Privacy and security are covered in one sentence requiring a password. Timekeeping is not addressed, although most remote staff are hourly. Equipment responsibilities are unclear, and some staff use personal computers. The policy is silent on employees who move to another state. And it says nothing about how remote staff stay connected to their team, which the Module Two exit interviews identified as a reason people left.

What this page is doingSix gaps are identified.
5

Why These Gaps Matter

Each gap carries real risk. Kruse et al. (2017) concluded from the published security literature that hospitals face mounting threats with defenses that often trail other industries, and home networks, shared family computers and printed records are exactly the weak points attackers and accidents exploit. Remote work also affects retention in both directions. The home-work trial run by Bloom et al. (2015) produced better output and fewer resignations, but it also produced volunteers who returned to the office because home felt lonely. Hom et al. (2017) describe how employees' connections to colleagues and the organization help keep them in their jobs, which means a remote policy that ignores connection may undermine the retention benefit remote work can offer.

What this page is doingResearch shows why the gaps matter.
6

Gathering Input

The revision drew on three kinds of input. A survey of remote staff, answered by 71 of 92, asked what worked and what was hard; the most common concerns were unclear expectations about availability and feeling left out of decisions. The information security office reviewed home work risks and recommended hospital-managed devices only. Human resources and legal counsel reviewed timekeeping, equipment reimbursement and employment in other states. A draft was then shared with a group of six staff from all three former hospitals, whose comments led to two changes described below.

What this page is doingStaff and expert input is described.
7

Revised Provisions

Table 1 summarizes the main provisions of the revised policy.

Table 1. Revised Remote Work Policy Provisions

TopicRevised provision
EligibilityRoles designated remote-eligible; employee meets performance standards and completes onboarding on site or with a mentor
Privacy and securityHospital-managed devices only; encrypted connection; no printing at home; private workspace where screens and calls cannot be seen or heard by others
TimekeepingAll hours worked recorded; no work outside scheduled hours without approval; overtime paid under wage and hour law
EquipmentHospital provides computer, monitors and headset; monthly stipend toward internet service
Work locationEmployees must live in states where Sycamore Bend is registered as an employer; moves require advance approval
AvailabilityDefined core hours; response to team messages within one hour during core hours
ConnectionWeekly team video meeting; monthly one-on-one with supervisor; twice-yearly in-person gathering
ReviewAnnual review by the director, human resources and information security

Note. Provisions drafted by the author with human resources, legal counsel and information security.

What this page is doingTable 1 summarizes the revised provisions.
8

What the Revised Policy Does Not Cover

Some questions belong in other documents. Individual schedules and core hours for each team are set by supervisors within the policy's limits, not written into the policy itself, so they can change without a full revision. Accommodations for employees with disabilities who need to work remotely are handled through the system's accommodation process, which the policy references rather than duplicates. And the security controls on hospital devices are specified by the information security office's standards, which change more often than a policy should. Keeping these details out of the policy keeps it short, stable and easier to follow, while pointing staff to where the details live.

What this page is doingThe policy's boundaries with other documents are explained.
9

Changes Made From Staff Feedback

The staff review group changed the draft in two ways. First, the original draft required cameras on for all meetings; staff pointed out that some share small homes with family members, so cameras are now expected for team meetings and one-on-ones but optional otherwise. Second, the draft said nothing about how remote staff are considered for promotion; staff worried that being out of sight meant being overlooked, so the policy now states that remote and on-site staff are evaluated by the same standards and have equal access to the career ladder.

What this page is doingStaff feedback changed the draft in two specific ways.
10

Communication, Training and Monitoring

The revised policy will be introduced in team meetings by the director rather than by email, with time for questions, followed by a short privacy and security training that every remote employee completes within 30 days. Supervisors will confirm that each remote employee has a hospital-managed device and a private workspace. Compliance will be monitored through device management reports, timekeeping audits and privacy incident reports, and the policy will be reviewed annually or sooner if laws or security threats change.

What this page is doingRollout and monitoring are planned.
11

Conclusion

The 2019 remote work policy failed not because it was wrong when written but because no one reviewed it as the department changed. The revision follows the full policy life cycle, closes six gaps, reflects research on security and retention, incorporates staff input and builds in annual review so the policy keeps pace with practice, which is the most important change of all.

What this page is doingThe conclusion restates the lesson about policy review.
12

References

Bloom, N., Liang, J., Roberts, J., & Ying, Z. J. (2015). Does working from home work? Evidence from a Chinese experiment. Quarterly Journal of Economics, 130(1), 165-218. https://doi.org/10.1093/qje/qju032

Hom, P. W., Lee, T. W., Shaw, J. D., & Hausknecht, J. P. (2017). One hundred years of employee turnover theory and research. Journal of Applied Psychology, 102(3), 530-545. https://doi.org/10.1037/apl0000103

Kruse, C. S., Frederick, B., Jacobson, T., & Monticone, D. K. (2017). Cybersecurity in healthcare: A systematic review of modern threats and trends. Technology and Health Care, 25(1), 1-10. https://doi.org/10.3233/THC-161263

What the HIM 520 Module 8 instructions ask for

The HIM 520 policy paper asks you to develop or revise a department policy and explain the process behind it. A graduate paper of about four to five pages in APA 7, with research and a table of provisions, fits most HIM 520 versions. Start by showing why the policy needs revision, then follow the policy life cycle: identify gaps, gather input from staff and from experts such as human resources, legal counsel and information security, draft, review and approve. Present the revised provisions clearly, explain changes made because of feedback and describe how the policy will be communicated, trained, monitored and reviewed. Tie the most important provisions to research on why they matter. Say what the policy leaves to other documents.

How this HIM 520 Module 8 policy short paper example is built

Sycamore Bend Health's remote work policy, written in 2019 for occasional telework, now governs 92 of 132 staff. The paper follows the policy life cycle, identifies six gaps from eligibility to connection and uses Kruse and colleagues on cybersecurity, Bloom and colleagues on remote productivity and isolation and Hom and colleagues on embeddedness to show why they matter. A staff survey, security, human resources and legal review and a cross-site group shape the revision. A provisions table covers devices, timekeeping, work location, availability and connection, and two changes from staff feedback, flexible cameras and equal promotion access, precede rollout and annual review in this HIM 520 paper. A section explains what belongs in other documents.

Where the HIM 520 Module 8 rubric puts the points

Policy papers in HIM 520 are commonly graded on a clear rationale for revision, a sound policy development process, meaningful input from staff and experts, clear and enforceable provisions, attention to legal, privacy and security requirements, communication and monitoring plans, a review schedule and APA 7 mechanics. The best graduate papers trace specific revisions back to staff comments, which demonstrates genuine involvement rather than consultation for show. Graders reward provisions tied to evidence, such as security controls for home work, and practical details such as timekeeping for hourly staff. A built-in review date shows the writer understands why policies fall out of date. Keeping detail in the right document shows skill.

HIM 520 Module 8 help: the mistakes that cost points

HIM 520 policy papers slip when they present a finished policy without explaining the process, skip input from staff or experts, omit legal and security considerations or leave out how the policy will be communicated and reviewed. Some drafts also write provisions too vague to enforce. If your course assigns a different policy, such as record retention, release of information, social media use or document correction, send the prompt and any existing policy so the revision fits. Mention who approves policies in your case organization. HIM 520 policy papers we write follow this order: need, life cycle, gaps, evidence, input, provisions, feedback changes, rollout and review.

Get HIM 520 Module 8 written to your instructions

Send the HIM 520 Module 8 prompt and the policy you are revising or developing. The paper will explain the need, follow the policy life cycle, gather and show input, present clear provisions tied to evidence and plan communication, monitoring and review, turned around in 24 to 48 hours, the first sample free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More HIM 520 papers and related MS Health Information Management samples

HIM 520 Module 8 questions, answered

Where can I find a free HIM 520 Module 8 Policy Short Paper sample?

The complete HIM 520 Module 8 paper is on this page: revising an outdated remote work policy for an HIM department, from gaps and input to revised provisions.

What is the policy life cycle?

Identifying a need, gathering input, drafting, expert review, approval, communication and training, monitoring and scheduled review.

What should a remote work policy for HIM staff include?

Eligibility, privacy and security controls, timekeeping, equipment, work location rules, availability expectations, team connection and a review date.

Why should remote HIM staff use only hospital-managed devices?

Managed devices allow encryption, updates and monitoring that personal or shared family computers cannot guarantee.

Why does a policy need a review date?

Without scheduled review, policies drift out of step with practice, laws and risks, as remote work policies often have.