IHP 200 Module 5 Adulthood Short Paper Example

Reviewed by Delia Ravenscroft, MSN, RN

This IHP 200 Module 5 Adulthood Short Paper sample explains how chronic stress affects health in the busy middle years of adulthood. It is written for SNHU IHP 200 (IHP-200), a lifespan wellness course that BS Health Sciences students take early in their degree. The composite patient, a 41-year-old single father with two jobs and two children, comes to a family clinic with headaches, rising blood pressure and about five hours of sleep a night. McEwen describes allostatic load, the cumulative wear on the body when stress responses are triggered too often or last too long. Cohen and colleagues review evidence linking psychological stress to depression, cardiovascular disease and weakened immune defenses. Watson and colleagues recommend at least seven hours of sleep for adults. The paper applies this research and proposes changes realistic for a parent with little time or money.

CourseIHP 200 Wellness Across the Lifespan
ModuleModule 5
Paper typeshort paper on adult stress and health
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Health Sciences
UpdatedOctober 2026

Free sample paper for IHP 200 Module 5

1

Running on Empty: Stress, Sleep and the Health of a Working Parent

[Student Name]

Southern New Hampshire University

IHP 200: Wellness Across the Lifespan

Module Five Short Paper

[Instructor Name]

[Date]

What this page is doingThe title's everyday phrase captures the patient's situation.
2

Running on Empty: Stress, Sleep and the Health of a Working Parent

Middle adulthood often brings the heaviest load of responsibilities: work, children, aging parents and bills, frequently all at once. The stress of these years is so common that it can seem normal, but research shows it can shape health for decades. This paper examines chronic stress through a composite patient at Brookside Family Health Center, explains how stress affects the body and health, considers the role of sleep and proposes realistic steps for someone with very little spare time.

What this page is doingThe introduction frames midlife stress as common but consequential.
3

The Patient

Marcus is a 41-year-old single father of two, ages nine and twelve. He works full time in a distribution center and three evenings a week driving for a delivery app to cover rent after his hours were cut. He came in for headaches that start most afternoons. His blood pressure was 142/90, up from 128/82 two years ago. He sleeps about five hours on work nights, often waking at 3 a.m. worrying about money. He skips lunch, drinks four or five energy drinks a day and has gained fifteen pounds in two years. He says he has no time for exercise and feels guilty about missing his children's games.

What this page is doingThe patient's stressors and health signs are described concretely.
4

How Stress Affects the Body

McEwen (1998) described how the body responds to challenges through allostasis, the process of adapting by releasing stress hormones such as cortisol and adrenaline, raising heart rate and blood pressure and mobilizing energy. In brief bursts, this machinery keeps people safe. Problems arise when they are called on too often, fail to shut off, fail to adapt to repeated challenges or are inadequate. The cumulative cost of this overuse he called allostatic load, and he linked it to high blood pressure, atherosclerosis, abdominal fat, impaired immune function, memory problems and other conditions. Sleep deprivation, he noted, is itself a stressor that adds to the load.

What this page is doingAllostasis and allostatic load are explained with their health links.
5

Stress and Disease

Cohen et al. (2007) reviewed research connecting psychological stress to disease. They found evidence that stress contributes to depression, cardiovascular disease and the progression of some infections, including HIV, and they described two main pathways. One is behavioral: stressed people tend to sleep less, eat worse, exercise less, smoke and drink more and skip medical care. The other is physiological: sustained activation of stress hormone systems and the sympathetic nervous system alters immune function, blood pressure and inflammation. They noted that the effects of stress depend on how long it lasts and how people appraise and cope with it.

What this page is doingA review links stress to disease through behavioral and physiological pathways.
6

Applying the Research to Marcus

Marcus shows both pathways. Behaviorally, he sleeps too little, skips meals, relies on energy drinks and has stopped exercising. Physiologically, his rising blood pressure, afternoon headaches, weight gain around the middle and 3 a.m. waking are consistent with a stress system that rarely switches off. In McEwen's terms, he is accumulating allostatic load. His stress is not a character flaw; it is a reasonable response to financial strain and long hours. That distinction matters, because advice that ignores his circumstances, such as telling him to relax, is likely to feel dismissive.

What this page is doingBoth pathways are identified in the patient without blame.
7

The Role of Sleep

Watson et al. (2015) recommended at least seven hours of sleep per night for adults, reporting that regularly sleeping less is associated with weight gain, high blood pressure, diabetes, heart disease, depression and impaired immune function and attention. At five hours, Marcus loses about ten hours of recommended sleep every work week. Improving sleep could ease several problems at once: his blood pressure, headaches, cravings for energy drinks and his ability to cope with daily stress.

What this page is doingSleep is identified as a lever that affects several problems.
8

Realistic Steps

Marcus needs steps that cost little time or money. The first is sleep protection: stopping caffeine after 2 p.m., replacing afternoon energy drinks with water and setting a consistent bedtime on nights he does not drive. The second is movement built into his day, such as a brisk ten-minute walk during breaks, since some activity is better than none. The third is food he can manage: a packed lunch prepared the night before with his children. The fourth addresses the source of stress: the clinic's social worker can help him apply for benefits his family may qualify for and review a budget, which could reduce the evening driving that cuts his sleep. The physician will recheck his blood pressure in four weeks before considering medication.

Table 1. Steps Matched to Stress Pathways

StepPathway addressedTime or cost
No caffeine after 2 p.m.; water instead of energy drinksSleep and physiologySaves money
Consistent bedtime on non-driving nightsSleepNo cost
Ten-minute walks during breaksBehavior and physiologyTen minutes, twice a day
Packed lunch prepared with childrenBehavior; family timeFifteen minutes
Social worker referral for benefits and budgetingRoot stressorOne visit

Note. Steps were chosen with the patient for feasibility.

What this page is doingLow-cost steps address behavior, physiology and the root stressor.
9

Social Support

Marcus also mentioned that his sister lives nearby and has offered to help with the children. Accepting one evening of help a week could give him time to rest or exercise. Supportive relationships are among the strongest buffers against the effects of stress, and he may benefit from seeing help as a health step rather than a failure.

What this page is doingSocial support is added as a buffer against stress.
10

What the Clinic Should Watch

The follow-up visit in four weeks gives the team a chance to see whether the steps are working and whether Marcus needs more help. The medical assistant will recheck his blood pressure and ask how many nights he slept at least six hours, how many energy drinks he is drinking and whether the headaches have eased. The physician will screen for depression, since chronic stress and poor sleep raise the risk, and ask directly about alcohol, which some people use to fall asleep. If his blood pressure remains above 140/90 despite changes, medication may be needed, and starting it would not mean the lifestyle steps failed. The team should also check whether the benefits application went through, because relief from financial strain may do more for his health than any single habit.

What this page is doingFollow-up measures and screening are planned for the next visit.
11

Conclusion

Marcus's headaches and rising blood pressure are signals of allostatic load built by financial strain, long hours and too little sleep. Research explains how stress works through both behavior and physiology, and it suggests that small, realistic changes, especially protecting sleep and easing the root stressor, can lighten the load. For working parents, wellness advice works best when it fits the life they actually have.

What this page is doingThe conclusion connects the research to practical, fitted advice.
12

References

Cohen, S., Janicki-Deverts, D., & Miller, G. E. (2007). Psychological stress and disease. JAMA, 298(14), 1685-1687. https://doi.org/10.1001/jama.298.14.1685

McEwen, B. S. (1998). Protective and damaging effects of stress mediators. New England Journal of Medicine, 338(3), 171-179. https://doi.org/10.1056/NEJM199801153380307

Watson, N. F., Badr, M. S., Belenky, G., Bliwise, D. L., Buxton, O. M., Buysse, D., Dinges, D. F., Gangwisch, J., Grandner, M. A., Kushida, C., Malhotra, R. K., Martin, J. L., Patel, S. R., Quan, S. F., & Tasali, E. (2015). Recommended amount of sleep for a healthy adult: A joint consensus statement of the American Academy of Sleep Medicine and Sleep Research Society. Sleep, 38(6), 843-844. https://doi.org/10.5665/sleep.4716

What the IHP 200 Module 5 instructions ask for

The IHP 200 adulthood assignment usually asks you to examine a health issue common in adulthood, such as stress, weight or chronic disease risk, and recommend ways to promote wellness. Expect two to four APA 7 pages. Explain the research on how the issue affects health, apply it to a real or composite adult and consider the person's work, family and financial circumstances. Recommend specific, realistic steps rather than general advice, and connect each step to the evidence. Instructors appreciate papers that avoid blaming the individual and that address the root causes of stress, not only its symptoms. IHP 200 graders notice clean headings in IHP 200 papers. IHP 200 names and dates need checking before IHP 200 submission.

How this IHP 200 Module 5 adulthood short paper example is built

This paper follows a composite 41-year-old single father working two jobs whose blood pressure rose to 142/90 and who sleeps five hours a night. McEwen's concept of allostatic load explains the cumulative wear of repeated stress responses, Cohen and colleagues describe behavioral and physiological pathways from stress to disease and Watson and colleagues set the seven-hour sleep benchmark. The paper applies both pathways without blame and proposes low-cost steps: cutting afternoon caffeine, consistent bedtimes, short walks, packed lunches and a social worker referral to ease financial strain, plus accepting his sister's help as a buffer. IHP 200 students can reuse this structure for IHP 200 work. IHP 200 claims here trace to cited IHP 200 sources.

Where the IHP 200 Module 5 rubric puts the points

Adulthood papers in IHP 200 are commonly marked on accurate explanation of research, thoughtful application to a person, attention to social and economic circumstances, realistic recommendations linked to evidence, organization and APA 7. Strong papers explain mechanisms, such as how stress raises blood pressure, and propose steps that fit the person's time and budget. Papers lose points when advice is generic, such as reduce stress or exercise more, when research is misstated or when the person's circumstances are ignored. Addressing the source of stress, not only coping strategies, is often credited by graders. IHP 200 marks favor careful formatting across IHP 200 sections. IHP 200 citations keep every IHP 200 argument credible.

IHP 200 Module 5 help: the mistakes that cost points

In IHP 200, adulthood papers often lose points for advice that ignores real constraints, for skipping mechanisms, for missing citations on guidelines and for blaming individuals. Another frequent weakness is recommending costly or time-heavy changes to someone with neither. Explain the research, apply it to the person's life, choose feasible steps and address root causes. If your assignment focuses on a different adult health issue, such as prediabetes or workplace injury, add it to your IHP 200 notes so the paper examines that issue instead. IHP 200 drafts start well from a IHP 200 outline. IHP 200 feedback already received guides IHP 200 revisions.

Get IHP 200 Module 5 written to your instructions

Send the IHP 200 adulthood prompt and the adult or issue in question. You will get a paper that explains the research and its mechanisms, applies it to the person's circumstances and proposes realistic steps tied to evidence, within 24 to 48 hours, free the first time. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More IHP 200 papers and related BS Health Sciences samples

IHP 200 Module 5 questions, answered

Where can I find a free IHP 200 Module 5 Adulthood Short Paper sample?

Everything is on this page: stress, allostatic load and sleep in a working single father, with realistic low-cost steps.

What is allostatic load?

The cumulative wear on the body when stress responses are triggered too often, last too long or fail to adapt, linked to high blood pressure and other conditions.

How does stress cause disease?

Through behavior, such as poor sleep and diet, and physiology, such as sustained stress hormones affecting blood pressure, immunity and inflammation.

How does lack of sleep affect adult health?

Regularly sleeping under seven hours is linked to weight gain, high blood pressure, diabetes, heart disease and depression.

What stress advice works for busy parents?

Small, low-cost steps such as protecting sleep, short walks, planned meals, accepting help and addressing financial stressors directly.