OL 500 Human Behavior in Organizations sample papers, module by module

Reviewed by Portia Lambrick, MBA

OL 500 asks why people in organizations think, feel and act as they do, and how a manager can diagnose root causes instead of treating symptoms. Its final project is a case study analysis built in four milestones, and the samples below follow that case from first reading to final recommendation.

OL 500 is SNHU’s Human Behavior in Organizations course. It centers on human behavior in organizations: the individual, group and organization levels of analysis, perception, attitudes and the psychological contract, motivation theories and pay for performance, gainsharing, participation and empowerment, trust and conflict, leadership through downsizing, culture and change, and sustaining change. Every module below opens a full sample paper or takes a free request for one; searches like "ol 500 module 3", "OL500 sample paper" and "OL 500 milestone example" land on this page.

What OL 500 is really about

OL 500 is the graduate organizational behavior course taken in SNHU's MS Organizational Leadership and in several MBA concentrations. Graders want diagnosis before prescription: a root cause traced through evidence at the individual, group and organization levels, then a recommendation designed to produce change that lasts after the consultant or the bonus goes away.

The milestones and the final project analyze Engstrom Auto Mirror Plant: Motivating in Good Times and Bad, a Harvard Business School case by Michael Beer and Elizabeth Collins that SNHU uses for the course's final project; the samples rely only on the case's published summary and on research, so read your own copy for the full facts. The five discussions follow the Tidewater Aquarium, an invented attraction with 210 staff and about 300 volunteers whose people and numbers are illustrative.

What OL 500’s modules ask for

Across ten modules, OL 500 commonly asks for discussions on the field's levels of analysis, motivation, participation, leadership and sustaining change, and a case study analysis built in four milestones on the individual level, motivation, the group level and the organization level, finished as a final project with recommendations.

Where students lose points in OL 500

OL 500 papers lose the most credit when they summarize the case instead of diagnosing it, recommend scrapping or keeping an incentive plan without explaining why it stopped working, confuse symptoms such as low morale with causes, cite theories without testing them against the facts and propose changes with no plan for how people will receive them.

The OL 500 drawers

Module 1

OL 500 Module 1 Discussion example

The opening OL 500 post introduces the Tidewater Aquarium, a composite attraction on Maryland's Eastern Shore where long-serving volunteer docents and young paid educators argue over who presents at the touch pool, and tests three readings of the conflict, one about personalities, one about the two groups and one about how the aquarium is organized; it draws on Johns's argument that context shapes what behavior occurs and what it means, Rousseau and Fried on why findings must be read in their setting and Heath and Sitkin's distinction between behavior that merely happens in organizations and behavior that is organizational, concludes that the education department's split command and unwritten privileges explain more than any personality, and asks classmates which level of analysis their own workplace problems usually get blamed on. Full sample paper, read it free.

Read the sample →
Module 2

OL 500 Module 2 Milestone One example

Milestone One opens the OL 500 case study analysis of the Harvard case Engstrom Auto Mirror Plant: Motivating in Good Times and Bad, in which an Indiana mirror plant that once used a Scanlon plan to turn itself around stops paying bonuses in 2006, lays off more than a fifth of its workforce and sees morale, productivity and quality fall; working only from the case's published summary, it frames plant manager Ron Bent's decision, then analyzes how individual workers were likely to perceive the end of the bonus using Robinson's study of trust and psychological contract breach, Zhao and colleagues' meta-analysis of what breach does to attitudes and behavior and Brockner and colleagues' studies of how procedural fairness shapes the reactions of layoff victims and survivors, ending with the individual-level questions the next milestones must test. Full sample paper, read it free.

Read the sample →
Module 3

OL 500 Module 3 Discussion example

The third OL 500 post asks what keeps the Tidewater Aquarium's paid educators going on $19 an hour, when most say they came for the animals and the children, and why a proposed bonus for program bookings worries them; it compares Gagné and Deci's account of self-determination theory, Van Eerde and Thierry's meta-analysis of Vroom's expectancy models and Jenkins and colleagues' finding that financial incentives tracked how much people produced but not how well, argues that a bookings bonus would buy volume at the cost of the quality educators care about, proposes rewarding skill growth and giving educators a say in program design instead, and asks classmates which theory best fits a mission-driven workforce. Full sample paper, read it free.

Read the sample →
Module 4

OL 500 Module 4 Milestone Two example

Milestone Two of the OL 500 case analysis asks why the Scanlon plan at the Engstrom Auto Mirror Plant worked during the turnaround and why it lost its pull once bonuses stopped in 2006; it separates the plan's three motivational parts, a shared bonus, a suggestion system and a promise of participation, and tests each against Bullock and Lawler's review of gainsharing cases, Arthur and Aiman-Smith's study of four years of suggestions at a gainsharing plant, which showed ideas moving from quick fixes toward deeper changes, and Hanlon, Meyer and Taylor's experiment in which commitment and helping held up after a group bonus was dropped, concluding that the bonus was never the whole engine and that the question for Bent is what happened to the participation that once came with it. Full sample paper, read it free.

Read the sample →
Module 5

OL 500 Module 5 Discussion example

The fifth OL 500 post asks how much to involve Tidewater Aquarium staff and volunteers in redesigning the shark exhibit, after a director proposed deciding with the architects alone to save time; it weighs Wagner's reanalysis showing that participation's average effects on performance and satisfaction are real but small, Glew and colleagues' framework that separates genuine participation from consultation for show and Seibert, Wang and Courtright's meta-analysis linking empowerment to satisfaction, commitment and performance, proposes giving the aquarists and educators decision rights over two design questions they know best rather than a general survey, and asks classmates where participation at their workplaces has been real and where it was for show. Full sample paper, read it free.

Read the sample →
Module 6

OL 500 Module 6 Milestone Three example

Milestone Three takes the OL 500 Engstrom analysis to the group level, examining the Scanlon committees through which workers and managers once shared ideas and the relationship between the shop floor and management as the downturn hit; it argues from the case summary and research that the committees were the plan's working parts, uses Dirks and Ferrin's meta-analysis of trust in leadership to separate trust in supervisors from trust in plant leadership, Kramer's review of how distrust spreads through groups and Simons and Peterson's study of 70 top management teams showing that low trust turns disagreement about work into personal conflict, and concludes that a breakdown of trust between floor and management turned the plan's committees into arenas of suspicion, with questions for the organization-level milestone. Full sample paper, read it free.

Read the sample →
Module 7

OL 500 Module 7 Discussion example

The seventh OL 500 post looks at the Tidewater Aquarium three weeks after a state grant cut forced it to eliminate 18 positions, when the remaining educators and aquarists are covering empty shifts and two strong performers have started job hunting; it uses Trevor and Nyberg's finding that downsizing raised voluntary quit rates across many firms, largely by eroding commitment, and that practices conveying fairness or tying people to the organization softened the effect, Datta and colleagues' review of what downsizing does to people and firms and Kets de Vries and Balazs's interviews with the managers who carry out layoffs, proposes honest workload triage, a written account of how positions were chosen and attention to the managers who delivered the news, and asks classmates what helped them stay after a round of cuts. Full sample paper, read it free.

Read the sample →
Module 8

OL 500 Module 8 Milestone Four example

Milestone Four completes the OL 500 Engstrom diagnosis at the organization level, asking what in the plant's culture, structure and leadership let a once-successful Scanlon plan decay into a pay program; drawing on the case summary and research, it weighs a pooled study by Hartnell's team that tested the competing values framework across 84 studies, a 1990s review by Armenakis and Bedeian sorting change research into four sets of issues and nurse samples from Herscovitch and Meyer in which staff who backed a change out of conviction helped it far more than those who merely feared the cost of resisting, and names a root cause: plant leadership stopped managing through the plan in the good years, so the downturn found a participative culture with nothing left inside it. Full sample paper, read it free.

Read the sample →
Module 9

OL 500 Module 9 Final Project example

The OL 500 final project presents the full case study analysis of Engstrom Auto Mirror Plant: Motivating in Good Times and Bad, revised from four milestones: it summarizes the plant's situation in 2007 from the case summary, restates the diagnosis across the individual, motivational, group and organization levels in fresh terms, judges plant manager Ron Bent's three options, and recommends keeping the Scanlon plan but relaunching it as a way of managing, with leaders back in the committees, the bonus formula explained line by line, a downturn savings program run through the committees under a pledge that no suggestion will cost a job, a quality factor added to the formula and a staged plan with measures; it draws on Welbourne and Gómez-Mejía's review of gainsharing, Armenakis, Harris and Mossholder on creating readiness for change, Hanlon, Meyer and Taylor's bonus-removal experiment and Dirks and Ferrin on trust in leaders. Full sample paper, read it free.

Read the sample →
Module 10

OL 500 Module 10 Discussion example

The closing OL 500 post asks why changes fade once their champion moves on, setting the Engstrom plan's slow decay beside a change at the Tidewater Aquarium, a shared touch-pool lead that worked for a year and then slipped after the volunteer coordinator who pushed it left; it draws on a review by Buchanan's team of the forces that let new practices hold or slide back, Weick and Quinn's contrast between episodic and continuous change and Stouten, Rousseau and De Cremer's ten evidence-based steps for managing change, concludes that changes last when they are built into routines, roles and measures rather than into a person, commits to three moves and asks classmates what made a change stick at their workplaces. Full sample paper, read it free.

Read the sample →
Different?

Your classroom shows something else?

Southern New Hampshire University revises courses; module counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.

Send it over →

Using a OL 500 sample the right way

Read the OL 500 milestones in order and the analysis moves the way the course wants it to: from how Engstrom's workers saw the end of their bonus, to what the plan had been doing for motivation, to the committees and trust that carried it, to the organization around it, so that Module 9 can name a root cause and a fix. For OL 500 help with your own case, send the guidelines and your case notes; the first custom sample is free and normally ready in two days.

OL 500 questions, answered

What does OL 500 cover?

Human behavior in organizations at the individual, group and organization levels: perception and attitudes, motivation, groups and trust, leadership, culture and change.

What is the OL 500 final project?

A case study analysis, built through four milestones, that diagnoses the root causes of an organization's behavior problems and recommends changes that will last.

Does the OL 500 sample retell the Engstrom case?

No. The milestone papers use only the case's published summary and research to model the analysis, so you will need the full case to add its exhibits and details.