| Course | OL 500 Human Behavior in Organizations |
|---|---|
| Module | Module 10 |
| Paper type | graduate discussion post reflecting on why changes decay and how to make change last after its champion moves on |
| Length | About 380 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 500 Module 10
Module Ten Discussion
Making a Change Outlast Its Champion
The Engstrom case is a story about a change that worked and then decayed. The Scanlon plan carried the plant through one crisis, then slowly turned into a pay program during the good years, so it was hollow when the next crisis came. Something smaller happened at my aquarium. After a long fight between volunteer docents and paid educators over the touch pool, our volunteer coordinator persuaded both groups to accept a shared lead, one docent and one educator each weekend, with a joint schedule. It worked for a year. She left in June, and by August the old arguments were back.
Buchanan et al. (2005), surveying studies of change that held or slid back, found no single cause; sustainability depended on factors at many levels, from what the change itself demanded and who was involved to management, money, leadership, culture, politics, process, context and timing, and they treated decay as a normal tendency to be planned for. Weick and Quinn (1999) contrasted episodic change, planned shifts from one state to another, with continuous change, ongoing adjustment woven into daily work. Both of my examples were treated as episodes: a fix was installed and then left alone.
Stouten et al. (2018), comparing popular change models with research, identified ten steps with evidence behind them; the last ones concern institutionalizing change, making it part of systems, roles and measures. Neither change reached that step. At Engstrom, the plan lived in its leaders' attention. At the aquarium, the shared lead lived in one coordinator's persistence. When attention moved or the person left, nothing held the change in place.
I have three commitments. The shared touch-pool lead goes into both the volunteer handbook and the educators' job descriptions by January. The weekend pair's schedule moves into our scheduling software, owned by my department, rather than a coordinator's spreadsheet. And I will add one line to our quarterly report, the number of weekend shifts staffed by a shared pair, so that decay shows up as a number before it shows up as an argument.
Has your employer ever kept a change alive after the person who started it left? What kept it alive, and what would you build in from the start next time?
References
Buchanan, D., Fitzgerald, L., Ketley, D., Gollop, R., Jones, J. L., Lamont, S. S., Neath, A., & Whitby, E. (2005). No going back: A review of the literature on sustaining organizational change. International Journal of Management Reviews, 7(3), 189-205. https://doi.org/10.1111/j.1468-2370.2005.00111.x
Stouten, J., Rousseau, D. M., & De Cremer, D. (2018). Successful organizational change: Integrating the management practice and scholarly literatures. Academy of Management Annals, 12(2), 752-788. https://doi.org/10.5465/annals.2016.0095
Weick, K. E., & Quinn, R. E. (1999). Organizational change and development. Annual Review of Psychology, 50, 361-386. https://doi.org/10.1146/annurev.psych.50.1.361
What the OL 500 Module 10 instructions ask for
The final OL 500 discussion asks students to reflect on the course, usually by considering how organizations sustain change rather than simply launch it. Expect to connect research on change, culture or leadership to your case analysis and to your own workplace, and to say what you will do differently as a leader. Graduate posts should use evidence on why changes decay, distinguish between changes driven by one-time programs and changes built into everyday work and treat the departure of a change's champion as a predictable risk rather than bad luck. Specific commitments carry more weight than general lessons. Replies should help classmates identify what, in their own examples, kept a change alive or let it fade.
How this OL 500 Module 10 discussion example is built
The sample connects two stories. One is the Engstrom Auto Mirror Plant from the course's case, where a Scanlon plan that drove a turnaround decayed during the good years. The other is the Tidewater Aquarium, an imagined nonprofit on Maryland's Eastern Shore, where a shared lead for the touch pool, agreed after a long dispute between volunteers and paid educators, worked for a year and then slipped after the volunteer coordinator who championed it left. Using Buchanan and colleagues' review of change sustainability, Weick and Quinn's contrast between episodic and continuous change and Stouten and colleagues' ten evidence-based steps, the post argues that changes last when they live in roles, routines and measures, and commits to three moves.
Where the OL 500 Module 10 rubric puts the points
Grading for the last OL 500 discussion usually considers accurate use of research on sustaining change, meaningful connection to the course's case and the writer's workplace, honest reflection, specific commitments and replies that help classmates analyze their own examples. The strongest OL 500 closing posts show that the writer can now spot early signs of decay. Credit falls for summaries of the whole course without a focus, for lessons stated in general terms such as "communication is key," for research cited without a finding or for commitments no one could check. Replies earn less when they share a story without asking what in the classmate's example sustained or undid the change.
OL 500 Module 10 help: the mistakes that cost points
Choose a change you have seen fade or last, ideally one you were part of, and pair it with the course case. Ask what kept it going while it lasted: a person, a routine, a measure, a reward? Then ask what happened when that support moved. Research on sustaining change offers lists of factors at several levels; use one or two that fit your example rather than all of them. Consider whether the change was treated as a one-time event or as part of continuous work. Commit to two or three specific moves you will make, each one checkable within a few months. Close by inviting OL 500 classmates to share what made a change stick, and in replies ask what would have happened if its champion had left.
Get OL 500 Module 10 written to your instructions
Paste the Module 10 prompt and tell us about a change you have watched succeed or fade. We draft a closing post that applies research on sustaining change to that example, links it to your case analysis, commits to specific moves and ends with an invitation for OL 500 peers to share what made change stick. Your first OL 500 closing post is free and ready inside two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 500 papers and related MS Organizational Leadership samples
- OL 500 Module 1 Discussion: Levels of Analysis and Context
- OL 500 Module 2 Milestone One: Case Introduction and Individual-Level Analysis
- OL 500 Module 3 Discussion: Motivation Theories
- OL 500 Module 4 Milestone Two: Motivation and Reward System Analysis
- OL 500 Module 5 Discussion: Participation and Empowerment
- OL 500 Module 6 Milestone Three: Group-Level Analysis
- OL 500 Module 7 Discussion: Leading Through Downsizing
- OL 500 Module 8 Milestone Four: Organization-Level Analysis
- OL 500 Module 9 Final Project: Case Study Analysis and Recommendations
- ACC 692 Module 8 Interview Documentation Assignment: The Memorandum of Interview and a Signed Statement
- FIN 700 Module 5 Cost of Capital Assignment: The WACC and the Target Debt Level
- MGT 600 Module 5 Milestone One: Framing the Decision and the Options
- MGT 630 Module 6 Discussion: Percent Plan Complete on the Framing Floors
OL 500 Module 10 questions, answered
Where can I find a free OL 500 Module 10 Discussion sample?
This page carries the full OL 500 Module 10 reflection on why organizational changes fade when their champions leave and how to make them last.
Why do organizational changes fail to last?
Research finds sustainability depends on many factors, from how well a change is built into routines and roles to leadership turnover, resources, politics and timing.
What is the difference between episodic and continuous change?
Episodic change is occasional and planned, moving an organization from one state to another; continuous change is ongoing adjustment built into everyday work.
What are evidence-based steps for managing change?
A review of practitioner models and research identified ten steps, including diagnosing the problem, assessing readiness, building a coalition, communicating a vision and institutionalizing the change.
How do you make a change outlast its leader?
Build it into roles, routines, measures and decision rights, share ownership early and plan for the champion's departure from the start.