OL 500 Module 8 Milestone Four Example

Reviewed by Portia Lambrick, MBA

This OL 500 Module 8 Milestone Four sample analyzes the organization-level causes of a case's problems: its culture, structure, leadership and handling of change. SNHU OL 500 (OL-500) uses this fourth milestone to finish the diagnosis in its MS Organizational Leadership case analysis. The organization is the Engstrom Auto Mirror Plant from the Harvard case by Beer and Collins, whose Scanlon plan stalled after bonuses stopped in 2006. Working from the published case summary and research on culture and change, the paper argues that plant leadership stopped managing through the plan during the good years, leaving a participative culture in name only when the downturn hit.

CourseOL 500 Human Behavior in Organizations
ModuleModule 8
Paper typegraduate milestone analyzing the organization-level causes of a case's problems, including culture, structure, leadership and change
LengthAbout 1,090 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Organizational Leadership
UpdatedOctober 2026

Free sample paper for OL 500 Module 8

1

The Organization Behind the Incentive Plan: An Organization-Level Analysis of the Engstrom Plant

[Student Name]

Southern New Hampshire University

OL 500: Human Behavior in Organizations

Milestone Four: Organization-Level Analysis

[Instructor Name]

[Date]

What this page is doingThe analysis in this OL 500 milestone uses the published Engstrom case summary; conclusions are the writer's own.
2

The Organization Behind the Incentive Plan: An Organization-Level Analysis of the Engstrom Plant

Where the Diagnosis Stands

The first three milestones traced Engstrom's decline through three levels. Workers likely took the lost payout, coming alongside lost jobs, as a pledge broken. The Scanlon plan's motivation came more from participation than from money, and participation may have thinned before the bonuses stopped. And in the plan's committees, falling trust turned debate into suspicion. This milestone asks what in the organization allowed that sequence, and names the root cause the final project must address.

What this page is doingCompletes the diagnosis.
3

Culture Then and Now

Hartnell et al. (2011), synthesizing 84 studies through the competing values framework, found that clan cultures, built on collaboration and employee involvement, were most closely tied to positive employee attitudes, while adhocracy cultures, built on innovation, and market cultures, built on results, related more strongly to other measures of effectiveness such as product quality, innovation and financial performance, with several links running counter to what the model's authors expected. A working Scanlon plan is in effect a clan culture with a market mechanism attached: shared involvement in improving the plant, rewarded by a share of the results. The case summary's account of the turnaround, with morale, productivity and quality rising together, fits that blend. The question is what happened to the clan side. If the plan came to be seen mainly as a bonus, the culture would have drifted toward a market culture without the involvement that made the bonus meaningful. When results then turned bad, there was nothing collaborative to fall back on.

What this page is doingApplies culture research.
4

Structure and the Plan's Authority

A Scanlon plan is also a structure: committees with authority to act on ideas, a formula that ties the plant's results to everyone's pay and channels that carry performance information to the floor. Whether that structure stays alive depends on whether managers treat it as part of how decisions are made. If supervisors and managers increasingly made improvements without the committees, or if committee recommendations waited months for decisions, the formal structure would remain while its authority drained away. The case summary does not say which happened, but the third option it gives Bent, to find factors that may be sabotaging the plan, implies that the plan's surroundings had changed.

What this page is doingExamines design.
5

Leadership Over Time

Leadership in a turnaround is usually visible and engaged; the crisis demands it. In good years attention moves elsewhere, toward customers, capacity and costs. The pattern the earlier milestones describe, a plan whose participative core thinned before the money stopped, is what one would expect if plant leadership gradually stopped managing through the plan: attending committee meetings less, explaining the bonus formula less, treating suggestions as a human resources matter rather than as the way the plant improved. When the downturn came, leaders who had not used the plan for years were poorly placed to use it again, and workers had no recent evidence that they would.

What this page is doingExamines the role of plant leadership.
6

How the Downturn Was Handled

Armenakis and Bedeian (1999), reviewing a decade of change research, organized it around four sets of issues: the content of a change, the context in which it occurs, the process by which it is carried out and the criteria by which it is judged. Engstrom's downturn was a change imposed by its market, but how the plant handled it was a choice. The content, layoffs and the end of the bonus, was probably unavoidable. The process, how it was explained, whether workers were involved in finding savings and whether the Scanlon committees were used to share the burden, is where leadership had room to act. A plant with a working Scanlon plan has an unusual asset in a downturn: a forum where workers and managers can look at the numbers together. The decline described in the case suggests that the forum was not used for that purpose.

What this page is doingApplies change research.
7

What Kind of Commitment the Plan Needs

Herscovitch and Meyer (2002), in studies including two samples of hospital nurses, found that employees whose commitment to a change rested on belief in its value, or on a sense of obligation, supported it more actively than employees who went along mainly because opposing it was costly; the latter tended toward bare compliance. A Scanlon plan depends on active support, suggestions, candid committee debate and effort beyond the job description. Workers who stayed with the plan because quitting it, or the plant, was costly would comply but not contribute, which is consistent with a plan that technically survives while productivity and quality decline.

What this page is doingApplies commitment research.
8

The Root Cause

Several contributing factors appear across the milestones: the loss of the bonus, the job cuts, a formula few understood, eroding trust and committees that stopped working. The root cause that explains them together is organizational: over the good years, plant leadership stopped managing through the Scanlon plan, so that by the downturn the plan had become a pay program inside a culture that still spoke of participation. That single condition explains why the end of the bonus hit so hard (it was nearly all that remained), why trust collapsed (leaders had not used the plan's forums to explain the downturn) and why the committees stalled (they had lost their authority before the crisis began). It also points toward a remedy that neither tinkering with the formula nor scrapping the plan would provide.

What this page is doingNames what the project must fix.
9

Ruling Out Other Root Causes

Two other candidates deserve a fair test. The first is the market: perhaps any plant losing a fifth of its jobs in a two-year slide would show the same decline, plan or no plan. The market certainly started the trouble, but it does not explain why Engstrom, which climbed out of an earlier crisis with this plan, stayed stuck this time. The second is plan design: perhaps the bonus formula, set for good times, was bound to stop paying in bad ones and to look unfair when it did. A formula that cannot pay in a downturn is a real weakness, yet the research reviewed in Milestone Two suggests that a plan whose participation is alive survives a pause in payouts. Both candidates are contributing factors. Neither explains the loss of trust and participation as well as a leadership that stopped managing through the plan.

What this page is doingTests the alternatives.
10

Limits

This diagnosis rests on the case summary, research and inference. The full case may show, for example, that committees remained active or that leaders communicated the downturn carefully, which would shift the root cause toward external factors or plan design. The final project will test the diagnosis against the full case before recommending.

What this page is doingNotes what the summary cannot confirm.
11

References

Armenakis, A. A., & Bedeian, A. G. (1999). Organizational change: A review of theory and research in the 1990s. Journal of Management, 25(3), 293-315. https://doi.org/10.1177/014920639902500303

Hartnell, C. A., Ou, A. Y., & Kinicki, A. (2011). Organizational culture and organizational effectiveness: A meta-analytic investigation of the competing values framework's theoretical suppositions. Journal of Applied Psychology, 96(4), 677-694. https://doi.org/10.1037/a0021987

Herscovitch, L., & Meyer, J. P. (2002). Commitment to organizational change: Extension of a three-component model. Journal of Applied Psychology, 87(3), 474-487. https://doi.org/10.1037/0021-9010.87.3.474

What the OL 500 Module 8 instructions ask for

Milestone Four of the OL 500 final project completes the diagnosis at the organization level. It asks how the organization's culture, structure, leadership and approach to change contribute to the problems identified at the individual and group levels. Most guidelines also ask students to name the root cause, the organization-level condition that best explains the pattern across all four milestones, before the final project turns to recommendations. Strong submissions use concepts such as culture types, organizational design and models of change, connect each organization-level factor to evidence from earlier milestones and distinguish the root cause from symptoms and contributing factors. Graders expect the root cause to be specific enough that a recommendation could address it.

How this OL 500 Module 8 milestone four example is built

The sample completes the diagnosis of the Engstrom Auto Mirror Plant, the Indiana supplier in the Harvard case by Michael Beer and Elizabeth Collins. It argues that the plant's culture during the turnaround was participative but became, during the good years, one in which the Scanlon plan was treated as a pay program rather than a way of managing. Using a meta-analysis of culture types and effectiveness, a review that sorts change research into four families of issues and studies showing that commitment based on belief in a change predicts cooperation better than commitment based on its costs, it traces how leadership, structure and the handling of the downturn let participation decay. It names the root cause as leadership that stopped managing through the plan.

Where the OL 500 Module 8 rubric puts the points

Milestone Four in OL 500 is usually graded on accurate analysis of culture, structure and leadership, application of research on organizational culture and change, clear connections to the earlier milestones, identification of a root cause distinct from symptoms and contributing factors, revision based on feedback and graduate-level APA writing. The most convincing OL 500 fourth milestones show how the organization level produced the group and individual patterns already described. Points fall when culture is described in adjectives without evidence, when the root cause is simply a restated symptom such as low morale, when leadership is blamed in general terms or when the milestone introduces recommendations before finishing the diagnosis. Graders also check that claims about the case stay within what it reports.

OL 500 Module 8 help: the mistakes that cost points

Gather your three earlier milestones and list every cause you identified, then ask which ones the organization could have prevented. Describe the culture using a framework, such as clan, market, hierarchy and adhocracy, and support each claim with evidence from the case. Examine structure: who has authority, how information flows and what role formal groups play. Examine leadership across time, not just in the present crisis. Look at how change, especially the downturn, was handled. Then test candidate root causes: does each one explain the individual, motivation and group findings together? The best root cause is the one that, if fixed, would address the most symptoms. Keep recommendations for the final project.

Get OL 500 Module 8 written to your instructions

Send the OL 500 Milestone Four guidelines with your three earlier milestones and their comments. We write the organization-level analysis: culture, structure and leadership, how change has been handled and the root cause that ties all four milestones together, ready to carry into the final case study. Your first OL 500 Milestone Four costs nothing and is ready inside two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 500 papers and related MS Organizational Leadership samples

OL 500 Module 8 questions, answered

Where can I find a free OL 500 Module 8 Milestone Four sample?

This page holds a complete OL 500 Milestone Four: an organization-level analysis of the Engstrom Auto Mirror Plant case, with a stated root cause.

What is a root cause in an organizational behavior case?

The underlying organization-level condition that best explains the pattern of symptoms across individuals and groups, so that fixing it would address many problems at once.

How does organizational culture affect effectiveness?

A meta-analysis found that collaborative, innovative and results-focused cultures each related positively to different measures of effectiveness, such as employee attitudes, quality and financial results.

What is affective commitment to change?

Backing a change because you think it is right; in hospital studies, nurses who backed a change this way championed and cooperated with it more than nurses who went along only to avoid trouble.

What should an organization-level case analysis cover?

Culture, structure, leadership and how change has been handled, connected to earlier findings and ending in a clearly stated root cause.