| Course | OL 665 Leading/Managing Not-For-Profit Orgs |
|---|---|
| Module | Module 2 |
| Paper type | graduate discussion post on how a nonprofit's effectiveness should be judged and why single measures such as overhead or release rates mislead |
| Length | About 380 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 665 Module 2
Module Two Discussion
Is Cedar Hollow Effective? It Depends Who Asks
Cedar Hollow Wildlife Center gets two very different report cards. A donor rating site gives it top marks because only 22 percent of its spending goes to management and fundraising. A local critic, writing in the county paper, says the center releases only about half the animals it admits and asks whether donors are paying for a hospice. Both are judging the same organization with one number.
Herman and Renz (2008), drawing on decades of research, advanced nine theses about nonprofit effectiveness, among them that it is always comparative, multidimensional and a social construction, and that there are unlikely to be universal best practices. Sowa et al. (2004) proposed a model that measures both management effectiveness and program effectiveness, each through structures and processes as well as outcomes. Lecy et al. (2012), reviewing the interdisciplinary literature, found broad agreement among scholars that single measures of effectiveness are not useful, even though rating agencies still rely on them.
The release rate depends on what arrives. About a third of the animals brought to Cedar Hollow come in after being hit by cars or caught by cats, and many are past saving when they arrive. A center that refused hard cases would raise its release rate and do less good. The overhead figure says nothing about care at all; it may even reflect a clinic so short of staff that cases wait.
I would track survival and release rates by species and by cause of injury, so that a spring full of cat-caught nestlings does not look like a bad year for care, compared with published figures where they exist; the share of hotline calls resolved without bringing an animal in; volunteer retention; and an annual survey of donors, veterinarians and the state wildlife agency. Together those say more than either verdict. None of them is free to collect: the center would need its intake records cleaned up and a short survey each year, which takes staff time the rating site would count as overhead. That is part of my point. A center that never spends on measurement can look efficient while knowing very little about its own results.
Which single number about your organization do you trust least, and what would you put beside it?
References
Herman, R. D., & Renz, D. O. (2008). Advancing nonprofit organizational effectiveness research and theory: Nine theses. Nonprofit Management and Leadership, 18(4), 399-415. https://doi.org/10.1002/nml.195
Lecy, J. D., Schmitz, H. P., & Swedlund, H. (2012). Non-governmental and not-for-profit organizational effectiveness: A modern synthesis. Voluntas: International Journal of Voluntary and Nonprofit Organizations, 23(2), 434-457. https://doi.org/10.1007/s11266-011-9204-6
Sowa, J. E., Selden, S. C., & Sandfort, J. R. (2004). No longer unmeasurable? A multidimensional integrated model of nonprofit organizational effectiveness. Nonprofit and Voluntary Sector Quarterly, 33(4), 711-728. https://doi.org/10.1177/0899764004269146
What the OL 665 Module 2 instructions ask for
The second OL 665 discussion asks how the effectiveness of a nonprofit organization should be defined and measured. Expect to examine the measures commonly used, such as overhead ratios, outputs and ratings, and explain why each is incomplete, then propose a better approach for a particular organization. Research on nonprofit effectiveness argues that it is multidimensional, always comparative and partly a matter of how different stakeholders judge an organization, so strong posts combine measures of programs, management and stakeholder views rather than relying on one number. Apply the ideas to the organization you chose for the course where possible. Replies should test whether a classmate's proposed measures would actually change decisions.
How this OL 665 Module 2 discussion example is built
The sample examines Cedar Hollow Wildlife Center, a fictional 501(c)(3) in southwestern Ohio that admits about 5,200 wild animals a year. A donor rating site gives it high marks because only 22 percent of spending goes to management and fundraising, while a local critic argues that releasing about half of the animals admitted shows poor results. The post argues that neither number says much alone: release rates depend on how badly hurt animals are on arrival, and overhead says nothing about care. Herman and Renz's theses, Sowa, Selden and Sandfort's model and Lecy, Schmitz and Swedlund's review support a short set of measures across care, management and stakeholders, and the post asks which number classmates distrust most.
Where the OL 665 Module 2 rubric puts the points
For the second OL 665 discussion, credit usually depends on an accurate account of research on nonprofit effectiveness, a critical look at common single measures, a specific proposal for judging one organization, attention to different stakeholders' views and replies that test classmates' proposals. Posts that spell out the blind spot of every proposed number stand out. Marks fall for accepting overhead ratios or ratings at face value, for proposing so many measures that none would guide decisions, for ignoring program outcomes in favor of activity counts or for replies that agree with a classmate's view without asking how the measures would be collected. Instructors also credit posts that admit what the organization cannot yet measure.
OL 665 Module 2 help: the mistakes that cost points
List the numbers people already use to judge your organization, such as overhead ratios, ratings, counts of people served or outcomes, and ask what each one really measures. Read research arguing that effectiveness is multidimensional and judged differently by different stakeholders. Then propose a small set of measures, perhaps one or two each for programs, management and stakeholder satisfaction, that the organization could collect and that would change decisions. Explain why your organization's context matters, such as the condition of the people or animals it serves. Note what cannot be measured yet. Close by asking OL 665 classmates which single number they trust least, and in replies press them on how they would gather the data.
Get OL 665 Module 2 written to your instructions
Paste the OL 665 Module 2 prompt and name the nonprofit you are studying. Our writers test the measures people use to judge it, apply research on multidimensional effectiveness, propose a short set of better measures and close with a question for OL 665 classmates about the numbers they distrust. Your first OL 665 post is free and finished in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 665 papers and related MS Organizational Leadership samples
- OL 665 Module 1 Journal: Choosing a Not-for-Profit to Study
- OL 665 Module 3 Milestone One: Not-for-Profit Organization Profile
- OL 665 Module 4 Discussion: The Role of the Nonprofit Board
- OL 665 Module 5 Milestone Two: Leadership Strategies and Communication Practices
- OL 665 Module 6 Discussion: Recruiting and Keeping Volunteers
- OL 665 Module 7 Milestone Three: Financial Management and Ethical Practices
- OL 665 Module 8 Journal: Interview With a Board Member
- OL 665 Module 9 Final Project: Strategic Analysis of a Not-for-Profit
- OL 665 Module 10 Discussion: Nonprofit Accountability
- HRM 630 Module 7 Statistical Process Control Assignment: A Control Chart on Missed Visits
- OL 600 Module 5 Milestone Two: Performance Management and Total Rewards
- MGT 600 Module 9 Discussion: When a Goal Pushes Too Hard
- MKT 660 Module 2 Situation Analysis Assignment: Nonprofit Situation Analysis
OL 665 Module 2 questions, answered
Where can I find a free OL 665 Module 2 Discussion sample?
The full OL 665 Module 2 post is on this page: how to judge the effectiveness of a wildlife rehabilitation nonprofit beyond overhead and release rates.
How is nonprofit effectiveness measured?
Researchers favor several measures together, covering program outcomes, management capacity and the judgments of key stakeholders, rather than one number.
Is a low overhead ratio a sign of a good charity?
Not by itself; overhead ratios say little about results, and research suggests that some investment in administration and fundraising supports an organization's capacity.
Why is nonprofit effectiveness called a social construction?
Because different stakeholders judge effectiveness by different standards, so what counts as effective depends partly on who is judging.
Are animals admitted an outcome or an output?
An output: admissions count activity. The outcome is what happens next, such as how many animals survive and go back to the wild healthy.