QSO 330 Module 7 Project Two Example

Reviewed by Portia Lambrick, MBA

This QSO 330 Module 7 Project Two sample is a supply chain improvement plan with coordination, sourcing, inventory and planning changes, partners' roles, costs and measures. SNHU QSO 330 (QSO-330) closes its BS Operations Management supply chain course with this plan in Module 7. The company is Sawyer Ridge Cabinetry, an invented Virginia cabinet maker whose six-week promise averages 9.1 weeks and whose orders swing far more than demand. Six changes, shared dealer and builder data, monthly sales and operations planning, a deeper relationship with the overseas box supplier, a second hinge brand, a nearshore box source and new safety stock rules, cost about $1.3 million to start and aim at a six-week lead time with 92 percent on-time delivery.

CourseQSO 330 Supply Chain Management
ModuleModule 7
Paper typeundergraduate supply chain improvement plan with coordination, sourcing, inventory and planning changes, partner roles, costs and measures
LengthAbout 1,110 words, 7 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 330 Module 7

1

Shorter, Steadier, Shared: A Supply Chain Improvement Plan for Sawyer Ridge Cabinetry

[Student Name]

Southern New Hampshire University

QSO 330: Supply Chain Management

Project Two: Supply Chain Improvement Plan

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe plan, partners, costs and targets for Sawyer Ridge Cabinetry in this QSO 330 project are invented.
2

Shorter, Steadier, Shared: A Supply Chain Improvement Plan for Sawyer Ridge Cabinetry

Introduction

Five weaknesses came out of the Project One analysis, and this plan answers each. In short: the forecast is built from orders rather than from kitchens customers have bought; plywood boxes and hinges each come from one source; the ocean pipeline for boxes is so long that a bad forecast stays in the system for a season; buffer stock follows a fixed six-week rule whatever the risk; and the people who sell, build and buy never sit down together with what partners know. Those weaknesses produced a 9.1-week average lead time against a six-week promise, on-time delivery of 71 percent and stock of long-lead parts that ranged from 4 to 19 weeks of supply. The plan proposes six changes, describes what each partner does and gains, estimates costs and benefits and sets targets and a schedule.

What this page is doingSummarizes the weaknesses the plan answers.
3

Change 1: Shared Demand Information

The 60 largest dealers will share signed contracts and open quotes weekly through a new screen in the order portal, and 25 home builders will upload community schedules monthly, as designed in Module 5. Dealers that take part get a protected place in the production schedule and a six-week delivery commitment, and only the planning team sees what they enter. Planning from orders is the first bullwhip driver in Lee et al. (1997), and planning from contracts and schedules removes it at the source. The Module 5 test suggested this would cut plywood forecast error from about 27 to about 18 percent.

What this page is doingFeeds the forecast with real demand.
4

Change 2: Monthly Sales and Operations Planning

A two-hour meeting each month will bring together sales, plant scheduling, purchasing and finance to agree on one demand forecast built from shared data, a production plan and component purchases for the next six months. The meeting will review forecast accuracy, lead time and inventory against targets. Until now, sales has forecast optimistically, purchasing has padded its orders and the plant has scheduled from the backlog, each without the others. A planner will be assigned to prepare the meeting.

What this page is doingCoordinates the company around one plan.
5

Change 3: A Partnership With the Box Supplier

The Vietnamese supplier will get a half-year outlook each week, with the first two months fixed, under a two-year volume agreement that includes priority allocation when capacity is short. A joint quality team will meet monthly by video and visit quarterly, and the two companies will share the cost of an edge-banding line for Sawyer Ridge's box sizes, about $400,000 split evenly. Dyer and Singh (1998) argued that relationship-specific investment, knowledge sharing and trust-building governance generate value neither firm could create alone; the shared line and joint team are designed to do that.

What this page is doingTurns orders into planning.
6

Change 4: A Second Hinge and Slide Brand

A second brand will be qualified for the value line, about a third of volume, after four months of testing. Treleven and Schweikhart (1988) set out how multiple sourcing protects against interruptions at the price of some of single sourcing's advantages. Keeping the premium brand for two-thirds of volume preserves those advantages where dealers demand it, while the second brand provides a ready alternative. The second brand costs about 4 percent more, about $90,000 a year.

What this page is doingEnds the single point of failure.
7

Change 5: A Nearshore Box Supplier

A panel and box maker in North Carolina, three hours away, will supply 30 percent of plywood boxes, mainly the most common sizes, with a two-week lead time and weekly deliveries. Its quoted price is about 14 percent above the Vietnamese supplier's factory price, but once ocean freight, duty, in-transit inventory and safety stock are included, the gap narrows to about 5 percent, roughly $440,000 a year on its share. The benefit is a short pipeline for 30 percent of boxes that can absorb swings in demand, while the Vietnamese supplier, freed of peak-season pressure, gets steadier orders.

What this page is doingShortens the lead time for part of the volume.
8

Change 6: Safety Stock by Lead Time and Variability

Safety stock for each long-lead component will be set from the variability of its forecast error and its lead time, using the normal approximation for a 97 percent service level, and reviewed monthly in the planning meeting. For boxes, combining a smaller forecast error, a two-week lead time on 30 percent of volume and a steadier overseas pipeline reduces required safety stock from about six weeks to about three and a half. For hinges and slides, the second brand allows a smaller buffer.

What this page is doingReplaces the six-week rule.
9

Combined Costs and Benefits

Estimated costs and benefits of the plan (invented estimates)

ItemOne-time costAnnual costAnnual benefit
Portal screen, forecasting and S&OP setup$260,000$95,000 planner
Share of edge-banding line$200,000
Qualifying second hinge brand$120,000$90,000 premium
Qualifying nearshore box supplier$180,000$440,000 premium
Inventory reduction, about $5.5 million at 24 percent$1,320,000
Less expediting and fewer write-downs$800,000
Sales recovered from fewer canceled late orders$1,900,000 in margin
TotalAbout $760,000About $625,000About $4.0 million

With about $500,000 of change management, training and dealer onboarding added to the one-time costs, start-up costs are about $1.3 million and net annual benefits are about $3.4 million. The largest benefit is recovered sales; dealers say unreliable lead times are their main reason for shifting business to competitors, and Sawyer Ridge estimates it lost $3 million to $4 million in revenue to late orders in 2025. Cachon and Fisher (2000) found that shortening lead times and reducing batch sizes generally created more value than information sharing alone, which is why the plan combines both.

What this page is doingEstimates the plan's value.
10

Targets

By the end of 2027: average order lead time of six weeks, from 9.1; on-time delivery of 92 percent, from 71; plywood forecast error under 18 percent, from 27; long-lead component inventory between 4 and 8 weeks of supply in every quarter, from a range of 4 to 19; and variability of plywood orders no more than twice that of kitchens installed, from nearly four times.

What this page is doingSets measurable goals.
11

Implementation Schedule

The planning meeting and the new safety stock rules start first, in the first quarter of 2026, since they need no partner agreement. Dealer and builder data sharing begins with a 15-dealer pilot in the second quarter. The second hinge brand and the nearshore box supplier are qualified in the second and third quarters. The two-year agreement with the Vietnamese supplier is signed in the third quarter, with the edge-banding line installed by year end.

What this page is doingSequences the changes.
12

Risks

Dealers might stop entering data once the novelty fades, so reserved slots will be tied to continued sharing. The nearshore supplier might struggle with capacity in its first peak season, so its share will rise from 15 to 30 percent over a year. And the Vietnamese supplier may see the nearshore source as a threat; the two-year agreement and shared investment are meant to show that it remains the primary partner.

What this page is doingNotes what could go wrong.
13

References

Cachon, G. P., & Fisher, M. (2000). Supply chain inventory management and the value of shared information. Management Science, 46(8), 1032-1048. https://doi.org/10.1287/mnsc.46.8.1032.12029

Dyer, J. H., & Singh, H. (1998). The relational view: Cooperative strategy and sources of interorganizational competitive advantage. Academy of Management Review, 23(4), 660-679. https://doi.org/10.5465/amr.1998.1255632

Lee, H. L., Padmanabhan, V., & Whang, S. (1997). Information distortion in a supply chain: The bullwhip effect. Management Science, 43(4), 546-558. https://doi.org/10.1287/mnsc.43.4.546

Treleven, M., & Schweikhart, S. B. (1988). A risk/benefit analysis of sourcing strategies: Single vs. multiple sourcing. Journal of Operations Management, 7(3-4), 93-114. https://doi.org/10.1016/0272-6963(81)90007-3

What the QSO 330 Module 7 instructions ask for

The last QSO 330 project brings the course together in a plan to improve the supply chain analyzed earlier. Expect to propose changes that address the problems found in Project One, such as better information sharing, new sourcing arrangements, revised inventory policies, a planning process that coordinates functions and partners and steps to manage risk. The plan should explain what each partner contributes and gains, estimate costs and benefits, set measurable targets and lay out an implementation schedule. Strong plans tie each change to a cause identified earlier, show how the changes reinforce each other, quantify benefits with stated assumptions and recognize what partners must agree to for the plan to work.

How this QSO 330 Module 7 project two example is built

The plan improves the supply chain of Sawyer Ridge Cabinetry, a fictional cabinet maker with $210 million in sales. Sixty large dealers share signed contracts weekly and builders share community schedules, feeding a forecast reviewed in a new monthly sales and operations planning meeting. The Vietnamese box supplier receives a rolling forecast under a two-year agreement with priority allocation; a second hinge and slide brand serves the value line; a North Carolina panel maker supplies 30 percent of boxes with a two-week lead time; and safety stock is set by lead time and demand variability. Start-up costs are about $1.3 million against net benefits of about $3.4 million a year. Cachon and Fisher, Lee, Padmanabhan and Whang, Treleven and Schweikhart and Dyer and Singh support the design.

Where the QSO 330 Module 7 rubric puts the points

In QSO 330 Project Two, instructors weigh whether each change answers a problem from the analysis, how well the changes fit together, whether partners' roles and incentives are realistic, how carefully costs and benefits are estimated, whether targets are measurable against a baseline and how practical the schedule is. Plans that earn the most explain why partners would agree, quantify the effect of each change on lead time, inventory or service and show the order in which changes build on one another. Credit drops when changes are generic, benefits are asserted without assumptions, partners are expected to act against their interests or the plan has no measures. APA citations and organization complete the grade.

QSO 330 Module 7 help: the mistakes that cost points

List the problems from your analysis and, for each, write the change that addresses its cause, who must act and what it costs. Group the changes into information, sourcing, inventory, planning and risk, and look for links, such as better forecasts allowing less safety stock. Estimate benefits with simple, stated assumptions, for example the inventory saved by a shorter lead time at the same service level. For every partner, say what it gains, since a plan that only asks suppliers or customers to do more will stall. Set three to five measures with baselines and targets and assign owners. A common mistake is a plan that depends entirely on new software; another is ignoring the order in which changes must happen. Finish with a schedule and the risks to watch.

Get QSO 330 Module 7 written to your instructions

Send the closing QSO 330 directions, your supply chain analysis and the comments it received. A writer turns the problems into a plan with coordination, sourcing, inventory and planning changes, spells out what each partner does and gains, estimates costs and benefits and sets measures and a schedule. The first QSO 330 Project Two is drafted at no charge, often within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 330 papers and related BS Operations Management samples

QSO 330 Module 7 questions, answered

Where can I find a free QSO 330 Module 7 Project Two sample?

This page holds the complete QSO 330 Project Two: a supply chain improvement plan for an invented cabinet maker with partner roles, costs and measures.

What goes in a supply chain improvement plan?

Changes to information sharing, sourcing, inventory, planning and risk management tied to diagnosed problems, with partner roles, costs, benefits, measures and a schedule.

What is sales and operations planning?

A monthly process in which sales, operations, purchasing and finance agree on one demand forecast and supply plan, balancing customer demand with capacity and materials.

How does a shorter lead time reduce inventory?

Safety stock must cover demand uncertainty over the lead time, so shortening the lead time reduces the uncertainty to cover and the stock needed for the same service level.

How do you get supply chain partners to support a plan?

Show what each partner gains, such as steadier orders, priority or shared savings, protect their data and interests and start with pilots that prove the benefit.