QSO 330 Module 3 Project One Example

Reviewed by Portia Lambrick, MBA

This QSO 330 Module 3 Project One sample analyzes an organization's supply chain structure, partners, flows, performance and risks. SNHU QSO 330 (QSO-330) collects this analysis in Module 3 of its BS Operations Management supply chain course. The company is Sawyer Ridge Cabinetry, an invented Virginia maker of semi-custom kitchen cabinets. The paper maps the chain with lead times and volumes, measures performance against the company's six-week promise, examines sourcing, information flows, inventory and supplier relationships, reviews risks such as a single hardware source and a 14-week ocean pipeline and closes with the five problems that Project Two must fix.

CourseQSO 330 Supply Chain Management
ModuleModule 3
Paper typeundergraduate project analyzing an organization's supply chain structure, partners, flows, performance and risks
LengthAbout 1,060 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 330 Module 3

1

Six Weeks Promised, Nine Delivered: A Supply Chain Analysis of Sawyer Ridge Cabinetry

[Student Name]

Southern New Hampshire University

QSO 330: Supply Chain Management

Project One: Supply Chain Analysis

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe suppliers, lead times and performance figures for Sawyer Ridge Cabinetry in this QSO 330 project are made up.
2

Six Weeks Promised, Nine Delivered: A Supply Chain Analysis of Sawyer Ridge Cabinetry

Introduction

Sawyer Ridge Cabinetry promises its dealers delivery within six weeks of a confirmed order. In 2025 it took an average of 9.1 weeks. The bullwhip assignment showed that orders swing several times more than real demand as they move up the chain. This project analyzes the whole supply chain: its structure, performance, sourcing, information flows, inventory and relationships, and the risks it carries. Because the definition by Mentzer et al. (2001) reaches across company lines, this analysis treats Sawyer Ridge's suppliers, dealers and builders as part of the system under study, not as background.

What this page is doingStates the scope and purpose.
3

The Supply Chain Map

Sawyer Ridge Cabinetry supply chain, 2025 (invented data)

LinkPartnersShare of material spend or salesLead time to Sawyer Ridge or customer
Hardwood lumberNine Appalachian sawmills41 percent of spend2 to 4 weeks
Plywood boxes and panelsOne supplier in Vietnam28 percent of spend14 weeks
Hinges and drawer slidesOne European brand via U.S. distributor8 percent of spend10 to 12 weeks
Paints and finishesOhio paint maker7 percent of spend1 week
Other materials and packagingSeveral16 percent of spend1 to 3 weeks
Kitchen dealersAbout 340 showrooms70 percent of salesPromised 6 weeks
Home builders25 regional builders30 percent of salesScheduled by community

Materials flow from suppliers to the plant, where lumber is milled into frames and doors, boxes are assembled with hardware and cabinets are finished and packed, then delivered by the company's own trucks to dealers and job sites. Information flows the other way: dealers enter orders through a web portal once a homeowner signs; builders send schedules for each new community; Sawyer Ridge sends purchase orders to suppliers based on a forecast built from dealer and builder orders. Payments flow from homeowners to dealers to Sawyer Ridge to suppliers, with dealer payment terms of 30 days and Vietnamese plywood paid half in advance.

What this page is doingDescribes structure, lead times and volumes.
4

Performance

Average order lead time in 2025 was 9.1 weeks against a six-week promise, and only 71 percent of orders shipped by their promised date. The main causes of late orders, from a sample of 400 late orders, were plywood boxes not in stock for 38 percent, hinges or slides not in stock for 24 percent, finishing capacity for 17 percent and order changes by dealers for 21 percent. Inventory of long-lead items swung widely: plywood boxes ranged from 4 weeks of supply in late 2021 to 19 weeks in mid-2023 and stood at 11 weeks at the end of 2025. Total inventory was about $28 million, or about 61 days of cost of goods.

What this page is doingMeasures against targets.
5

Sourcing

Hardwood is spread across nine sawmills, which gives flexibility and competitive pricing; no mill supplies more than 20 percent. Plywood boxes come from one supplier chosen in 2018 for price, about 22 percent below the nearest U.S. alternative, with a long lead time and full containers as the minimum order. Hinges and slides come from one premium European brand that dealers request by name, through one distributor. Treleven and Schweikhart (1988) analyzed the risks and benefits of single and multiple sourcing and found that single sourcing can offer better quality, lower cost and closer cooperation, while multiple sourcing protects against supply interruptions and price increases. Sawyer Ridge has taken the benefits of single sourcing for its two longest-lead items without the protections.

What this page is doingExamines how suppliers are chosen and used.
6

Information Flows

The forecast for plywood and hardware is built from dealer and builder orders, not from kitchens sold or installed. Dealers know their pipeline of signed contracts and sales leads, and builders know their community schedules months in advance, but neither shares that information systematically. Suppliers receive purchase orders with no forecast attached. This is the information gap behind the bullwhip effect measured in Module 2.

What this page is doingExamines what each partner knows.
7

Inventory Planning

Safety stock for plywood and hardware is set by rule of thumb at six weeks of average demand, regardless of demand variability or lead time. When orders rise, purchasing raises the forecast and orders more to rebuild the six weeks, which amplifies swings. Finished cabinets are made to order, so the plant holds little finished inventory; the risk sits in purchased components.

What this page is doingExamines how stock is set.
8

Costs

Landed cost of the Vietnamese plywood, including freight, duty and the cost of carrying 14 weeks of goods in transit plus safety stock, is about 12 percent below a U.S. alternative, much less than the 22 percent difference in quoted price. Expediting in 2021 and the 2023 write-down erased that advantage for those years. Freight to dealers on the company's own trucks costs about 3 percent of sales. Late orders carry hidden costs: dealers report spending time managing anxious homeowners, and about one in eight late orders is changed or canceled, adding rework at the plant.

What this page is doingShows where supply chain cost sits.
9

Relationships

Relationships with sawmills are long and informal. The Vietnamese supplier is treated at arm's length, with communication through purchase orders and an annual visit. The hinge distributor allocates product to its customers when supply is short, and Sawyer Ridge has no priority status. Dealers value Sawyer Ridge's quality and styles but say in a 2025 survey that unreliable lead times are their main complaint.

What this page is doingExamines how partners work together.
10

Risks

Three risks stand out. First, a disruption at the single plywood supplier, from a factory problem, a port closure or a tariff change, would stop box assembly within 11 weeks, the current stock. Second, the hinge and slide brand has already allocated supply once, in 2024, when Sawyer Ridge waited 18 weeks for slides. Third, the 14-week ocean pipeline means that any forecast error is locked in for more than three months. Across 827 disruption announcements studied by Hendricks and Singhal (2005), the affected firms' shares lagged comparable firms by close to 40 percent over the three years surrounding the news, and recovery was slow, which shows how costly such events can be even for firms that survive them.

What this page is doingReviews the most serious vulnerabilities.
11

Problems for Project Two

Taken together, the findings point to five problems. First, demand information stops at the dealer, so the chain plans from distorted orders. Second, the two longest-lead components are single sourced with no backup. Third, the 14-week plywood lead time locks in forecast errors and requires large safety stocks. Fourth, safety stock rules ignore variability and lead time. Fifth, there is no regular planning process that brings sales, operations and purchasing together with partners' information. Project Two will propose a plan to address each.

What this page is doingStates what the plan must solve.
12

References

Hendricks, K. B., & Singhal, V. R. (2005). An empirical analysis of the effect of supply chain disruptions on long-run stock price performance and equity risk of the firm. Production and Operations Management, 14(1), 35-52. https://doi.org/10.1111/j.1937-5956.2005.tb00008.x

Mentzer, J. T., DeWitt, W., Keebler, J. S., Min, S., Nix, N. W., Smith, C. D., & Zacharia, Z. G. (2001). Defining supply chain management. Journal of Business Logistics, 22(2), 1-25. https://doi.org/10.1002/j.2158-1592.2001.tb00001.x

Treleven, M., & Schweikhart, S. B. (1988). A risk/benefit analysis of sourcing strategies: Single vs. multiple sourcing. Journal of Operations Management, 7(3-4), 93-114. https://doi.org/10.1016/0272-6963(81)90007-3

What the QSO 330 Module 3 instructions ask for

In Module 3 of QSO 330, students take one firm's supply chain apart. Expect to describe the product and the chain's structure from suppliers to end customers, map material, information and financial flows, assess performance with measures such as lead time, delivery reliability, inventory and cost, examine sourcing strategy, coordination and supplier relationships, identify risks and summarize the problems an improvement plan should address. Strong projects quantify the chain, with lead times, volumes and performance gaps, connect problems to their causes in the chain's design and coordination and look beyond the focal company to its partners. The analysis should prepare the ground for Project Two.

How this QSO 330 Module 3 project one example is built

The project analyzes the supply chain of Sawyer Ridge Cabinetry, a fictional maker of framed cabinets with $210 million in sales. It maps nine sawmills, a Vietnamese plywood box supplier with a 14-week lead time, a single European hinge and slide brand through a U.S. distributor, an Ohio finish maker, the Martinsville plant and about 340 dealers and 25 builders. Performance falls short: a six-week promise averages 9.1 weeks, on-time delivery is 71 percent and inventory of long-lead items has ranged from 4 to 19 weeks of supply. Mentzer and colleagues on supply chain management, Hendricks and Singhal on disruption costs and Treleven and Schweikhart on single and multiple sourcing support a risk review and five problems for Project Two.

Where the QSO 330 Module 3 rubric puts the points

For this QSO 330 analysis, credit follows a full map with lead times and volumes, performance measured against targets, a sound examination of sourcing, information flows, inventory and relationships, a risk review that weighs likelihood and impact, problems linked to causes in the chain and use of research. Projects that score highest go beyond the company's walls, quantify each problem and show how problems in one part of the chain cause problems elsewhere. Credit drops when the map is vague, performance is described without numbers, risks are listed without assessment or the problems do not lead naturally to an improvement plan. Tables and APA citations count as well.

QSO 330 Module 3 help: the mistakes that cost points

Map the chain first, with every major supplier, the company and its customers, and add lead times, volumes and the share of spend or sales at each link. Measure performance with a few clear metrics, such as promised versus actual lead time, on-time delivery and weeks of inventory for critical items, and compare them with targets. Then examine how the chain is managed: how suppliers are chosen, how information moves, how inventory is planned and how relationships work. Review risks by asking which single failure would stop production and how likely and costly it would be. A common mistake is analyzing the company's operations and calling it a supply chain analysis; another is listing problems without tracing them to causes. End with three to five problems for Project Two.

Get QSO 330 Module 3 written to your instructions

Tell us which firm's supply chain you are studying for QSO 330 and attach the Module 3 directions. A writer maps its supply chain with lead times and volumes, measures performance, examines sourcing, information, inventory and relationships, reviews risks and states the problems your improvement plan should solve, all supported by supply chain research. Your first QSO 330 project is free and arrives in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 330 papers and related BS Operations Management samples

QSO 330 Module 3 questions, answered

Where can I find a free QSO 330 Module 3 Project One sample?

This page holds the full QSO 330 Project One: an analysis of an invented cabinet maker's supply chain, its performance gaps and its risks.

What goes in a supply chain analysis?

A map of the chain with lead times and volumes, performance measures against targets, an examination of sourcing, information flows, inventory and relationships, a risk review and the problems to solve.

What metrics measure supply chain performance?

Common metrics include order lead time, on-time and in-full delivery, inventory weeks of supply or turns, total supply chain cost and cash-to-cash cycle time.

What are the risks of single sourcing?

A single supplier can fail through disruption, capacity limits or quality problems with no ready backup, though single sourcing can also bring lower cost and closer cooperation.

How much do supply chain disruptions cost companies?

A study of 827 disruption announcements found that affected firms' stock returns averaged nearly 40 percent below benchmarks over the period from a year before to two years after.