| Course | QSO 425 Reverse Logistics |
|---|---|
| Module | Module 5 |
| Paper type | undergraduate assignment evaluating a refurbishment or remanufacturing business on market, pricing, quality, capacity, cannibalization and profit |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 425 Module 5
Seventy-Nine Dollars, One-Year Warranty: The Case for a Factory-Reconditioned Line at Halstrom
[Student Name]
Southern New Hampshire University
QSO 425: Reverse Logistics
Remanufacturing Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Seventy-Nine Dollars, One-Year Warranty: The Case for a Factory-Reconditioned Line at Halstrom
Introduction
The returns redesign in Project One would send about 54,300 working returns a year to reconditioning instead of liquidation or scrap. That only pays if Halstrom can sell them. This assignment defines what "factory reconditioned" will mean, identifies who would buy reconditioned tools and through which channels, sets a price and warranty, estimates how many sales would come from customers who would otherwise buy new and calculates what the line is worth compared with liquidation.
What Reconditioned Means
Thierry et al. (1995) distinguish repair, refurbishing and remanufacturing by how far a product is restored: refurbishing brings it to a specified quality, while remanufacturing rebuilds it to the standard of new. Halstrom's line is refurbishment to a new-tool functional standard. Every reconditioned tool is cleaned, inspected, fitted with new wear parts where needed, such as brushes, chuck jaws and blade guards, and put through the same end-of-line test as a new tool: speed, torque, clutch settings, trigger response and electrical safety. Cosmetic marks are allowed if they do not affect function. Tools are sold in a plain brown box marked "Halstrom Factory Reconditioned" with a one-year warranty, against three years for new tools.
Supply
After gatekeeping and testing, the returns center expects about 54,300 tools a year to qualify: working returns that are opened but undamaged, plus defective tools repaired for less than $18. The mix follows returns: about 40 percent drills and drivers, 30 percent impact drivers, 20 percent saws and 10 percent other tools. Supply is steady but not controllable; it follows sales with a lag of about two months, peaks after the holiday season, when gift returns arrive, and cannot be increased to meet demand without building tools specifically to sell as reconditioned, which the plan rules out.
Market and Channel
Atasu et al. (2008) showed that remanufactured products can let a manufacturer reach customers who would not buy new at the full price, such as price-sensitive or environmentally minded buyers, and that offering them can pay even when some sales are cannibalized, depending on competition and the size of those segments. Halstrom's likely buyers are homeowners who need a drill a few times a year, students and first-time homeowners and small contractors buying backup tools. Many now buy low-priced store brands or used tools on resale sites.
Two channels reach them without placing reconditioned tools beside new ones on the main shelf: Halstrom's own website, which already sells parts and batteries, and the outlet section of one chain's stores, which has offered to stock them in about 200 locations. A six-week online test last spring sold out 4,000 reconditioned tools at $79.
Price
New Halstrom drill and driver kits sell for about $139 at retail. Used Halstrom tools on resale sites sell for about $55 to $70, with no warranty. Subramanian and Subramanyam (2012), studying online auctions of remanufactured products, found that price discounts for remanufactured goods were smaller when the seller was more reputable or was the original manufacturer, which suggests that a factory warranty and brand let Halstrom price well above used tools. The reconditioned price is set at $79, about 43 percent below new and above the used market. After channel margins, payment and shipping, Halstrom nets about $58 a tool.
Margin Against Liquidation
Margin per reconditioned tool
| Item | Per tool |
|---|---|
| Net revenue | $58.00 |
| Reconditioning labor, wear parts and box | minus $16.00 |
| Net from reconditioning | $42.00 |
| Next-best use, liquidation | minus $11.50 |
| Gain over liquidation | $30.50 |
The returned tool has already been paid for once, so its cost is not counted. The fair comparison is with what it would bring otherwise. At $30.50 more than liquidation on 54,300 tools, the line earns about $1.66 million a year before cannibalization.
Cannibalization
Some buyers of a $79 reconditioned drill would have bought a $139 new one. Each such sale costs Halstrom the new tool's margin, about $44. A survey of 1,100 buyers in the online test asked what they would have done without the reconditioned option: 21 percent said they would have bought a new Halstrom tool, 46 percent a store brand or used tool and 33 percent would have waited or not bought.
Profit of the line under different cannibalization rates
| Share of buyers who would have bought new | Lost new-tool margin | Net annual gain |
|---|---|---|
| 10% | $239,000 | $1,417,000 |
| 20% | $478,000 | $1,178,000 |
| 35% | $836,000 | $820,000 |
At the survey's figure of about 20 percent, the line adds about $1.18 million a year. Even if cannibalization were 35 percent, it would add about $820,000. The line breaks even only if about 70 percent of buyers would otherwise have bought new, far above anything the test suggests.
Protecting New Sales and the Brand
Three choices protect new sales. The one-year warranty, against three for new tools, keeps a reason for contractors to buy new. Reconditioned tools are sold only online and in outlet sections, never on the main tool aisle. And volume is capped at the supply of returns: Halstrom will not build tools to sell as reconditioned. To protect the brand, every reconditioned tool passes the same functional test as a new one, and warranty claims on reconditioned tools will be tracked separately; if they exceed twice the rate for new tools, the standard will be tightened.
Risks
The main risks are that demand does not absorb 54,300 tools a year, since the test sold only 4,000; that the chain's outlet stores sell them poorly; and that store brands cut prices in response. The response is to launch online first, add outlet stores over six months and, if inventory builds, sell surplus reconditioned tools to liquidators, which still recovers the liquidation value.
Recommendation
Halstrom should launch the factory-reconditioned line with the returns center, price kits at $79 with a one-year warranty, sell online and through outlet sections only and review cannibalization each quarter by repeating the buyer survey. The line is profitable under every plausible assumption and turns a scrapped return into a sale to a customer Halstrom was not reaching, often one who will buy a new Halstrom battery or a second tool later.
References
Atasu, A., Sarvary, M., & Van Wassenhove, L. N. (2008). Remanufacturing as a marketing strategy. Management Science, 54(10), 1731-1746. https://doi.org/10.1287/mnsc.1080.0893
Subramanian, R., & Subramanyam, R. (2012). Key factors in the market for remanufactured products. Manufacturing & Service Operations Management, 14(2), 315-326. https://doi.org/10.1287/msom.1110.0368
Thierry, M., Salomon, M., Van Nunen, J., & Van Wassenhove, L. (1995). Strategic issues in product recovery management. California Management Review, 37(2), 114-135. https://doi.org/10.2307/41165792
What the QSO 425 Module 5 instructions ask for
The QSO 425 Module 5 assignment usually asks students to evaluate a product recovery option such as refurbishment or remanufacturing. Expect to define the recovery process and quality standard, identify the supply of returned products and the market for recovered ones, set the channel and price, estimate costs and margins, consider the effect on sales of new products and recommend whether and how to proceed. Strong assignments compare the recovered product's margin with the next-best disposition, such as liquidation, rather than with zero, estimate cannibalization and test the result against a range of values, explain how quality and warranty will protect the brand and connect the analysis to research on remanufacturing markets.
How this QSO 425 Module 5 remanufacturing assignment example is built
The assignment evaluates a factory-reconditioned line for Halstrom Tool Company, a fictional South Carolina cordless tool maker. About 54,300 working returns a year would be reconditioned to the same functional test as new tools and sold online and through one chain's outlet stores at $79, against $139 for new, netting Halstrom about $58. Each earns about $30.50 more than liquidation, about $1.66 million a year in total. If 20 percent of buyers would otherwise have bought new, the line still adds about $1.18 million, and it stays positive at 35 percent. Atasu, Sarvary and Van Wassenhove, Subramanian and Subramanyam and Thierry and colleagues inform the segment, price and quality standard.
Where the QSO 425 Module 5 rubric puts the points
The QSO 425 remanufacturing assignment is commonly graded on a clear definition of the recovery process and quality standard, a realistic supply of returns, a defined market segment and channel, a justified price, a margin compared with the next-best disposition, a cannibalization estimate with sensitivity, attention to warranty and brand and a sound recommendation. The strongest assignments explain which customers the recovered product reaches that new products miss. Credit drops when the margin is measured against zero, cannibalization is ignored or assumed away, quality is vague or the price is set without reference to new products and competitors. Tables, clarity and APA citations complete the rubric.
QSO 425 Module 5 help: the mistakes that cost points
Start by defining what you will do to the returned product, and to what standard: refurbishment usually restores function and appearance, while remanufacturing rebuilds to like-new specifications. Estimate how many suitable returns you have each year. Then find the buyers: who would buy a recovered product who would not buy new, and through which channel? Set a price relative to new products and competitors, and calculate the margin against what the product would earn otherwise, usually liquidation. Estimate how many recovered sales would replace new ones, and test the profit at low, middle and high values. Decide the warranty and branding. A common mistake is measuring the margin against zero; another is assuming no customer would trade down.
Get QSO 425 Module 5 written to your instructions
Share the QSO 425 Module 5 instructions and describe the products and returns. A writer defines the recovery option, refurbishment or remanufacturing, sets the quality standard, identifies the market segment and channel, prices the product, estimates cannibalization with a sensitivity test and calculates the profit compared with liquidation, citing remanufacturing research. Your first QSO 425 paper is free, ready in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 425 papers and related BS Operations Management samples
- QSO 425 Module 1 Discussion: What Reverse Logistics Means for a Tool Maker
- QSO 425 Module 2 Returns Analysis Assignment: What 143,000 Returns Cost and Why They Wait
- QSO 425 Module 3 Project One: A Returns Network With Gatekeeping and a Disposition Tree
- QSO 425 Module 4 Discussion: Does a 90-Day No-Questions Policy Pay?
- QSO 425 Module 6 Discussion: Lithium Batteries and Take-Back Rules
- QSO 425 Module 7 Project Two: The Reverse Logistics Improvement Plan
- QSO 425 Module 8 Discussion: Should Returned Tools Ever Be Destroyed?
- MKT 270 Module 3 Milestone One: Pre-Approach and Needs Analysis
- MKT 345 Module 1 Discussion: Why People Shop Thrift
- ACC 427 Module 5 Email and Document Review Assignment: Searching a Supervisor's Mailbox Defensibly
- FIN 340 Module 5 Discussion: Can Gordon Beat the Market Once He Retires?
QSO 425 Module 5 questions, answered
Where can I find a free QSO 425 Module 5 Remanufacturing Assignment sample?
The complete QSO 425 Module 5 assignment is on this page: a factory-reconditioned tool line for an invented cordless tool maker.
How does refurbishing differ from remanufacturing?
Refurbishing restores a product to working order and good appearance; remanufacturing disassembles and rebuilds it to original specifications, often with a warranty like that of new products.
Why compare recovered products with liquidation?
Because liquidation is usually the next-best use of a returned product, so the true gain from refurbishing is the margin above what liquidation would bring.
How can manufacturers limit cannibalization from remanufactured products?
By targeting price-sensitive segments, using separate channels, offering shorter warranties and limiting volume so that new-product buyers are not drawn away.
Do remanufactured products need their own brand?
Many manufacturers sell them under a clearly labeled program, such as certified refurbished, to reassure buyers about quality while keeping them distinct from new products.