QSO 425 Module 2 Returns Analysis Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 425 Module 2 Returns Analysis Assignment sample analyzes a company's returns by cause and disposition, totals their cost and estimates the value lost while they wait. SNHU QSO 425 (QSO-425) assigns this analysis in Module 2 of its reverse logistics course for BS Operations Management students. The company is Halstrom Tool Company, an invented South Carolina maker of cordless tools whose returns spend eleven weeks in transit and storage before anyone decides what to do with them. The paper sorts 142,900 returns, follows each disposition to its recovered value and shows that waiting costs nearly as much as the whole reverse operation loses.

CourseQSO 425 Reverse Logistics
ModuleModule 2
Paper typeundergraduate assignment analyzing a company's returns by cause and disposition, their total cost and the value lost while they wait
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 425 Module 2

1

Eleven Weeks in a Cage and a Warehouse: What Halstrom's 142,900 Returns Cost

[Student Name]

Southern New Hampshire University

QSO 425: Reverse Logistics

Returns Analysis Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe return volumes, costs and recovery values for Halstrom Tool Company in this QSO 425 assignment are invented.
2

Eleven Weeks in a Cage and a Warehouse: What Halstrom's 142,900 Returns Cost

Introduction

Halstrom Tool Company sold about 2.1 million cordless tools last year and received 142,900 back, a return rate of 6.8 percent. The company has treated returns as a cost of doing business with retailers and has never analyzed them as a flow with its own costs and value. This assignment classifies the year's returns by reason and disposition, costs the reverse flow, estimates the value lost while returns wait and sets out the questions a redesign must answer.

What this page is doingStates the purpose.
3

Returns by Reason

Every tool reaching the third-party warehouse is coded by an inspector against four reasons. Coding was checked on a sample of 600 tools retested by Halstrom engineers, who agreed with the inspectors' code about 90 percent of the time.

Returns by reason

ReasonUnitsShare
No fault found: tool works on test54,30038%
Unused: sealed or unmarked, packaging opened44,30031%
Defective: confirmed failure31,40022%
Damaged in shipping or handling12,9009%
Total142,900100%

More than two-thirds of returns, 98,600 tools, work. Calls to Halstrom's customer line suggest why: most no-fault-found drills came back because the battery was not charged when bought, the user expected a different speed or the chuck was misunderstood. Unused tools are mostly buyer's remorse, gifts and duplicate purchases.

What this page is doingClassifies what comes back.
4

Disposition and Recovered Value

Current dispositions and recovered value

DispositionUnitsValue recovered per unitTotal recovered
Restocked as new11,400$52.00$594,000
Sold to liquidators by the pallet38,600$11.50$444,000
Refurbished and sold as reconditioned7,100$44.00 net of refurbishment$314,000
Scrapped for metal and plastic85,700$1.20$103,000
Total142,900$1,455,000

Restocked tools are valued at their manufacturing cost of about $52, since they replace new production. Liquidators pay about 12 percent of the $96 wholesale price. Reconditioned tools sell for $58, less about $14 to refurbish.

The mismatch is the main finding. About 98,600 returned tools work, but only 18,500 are restocked or refurbished. The warehouse cannot test quickly, has no repair bench and is paid by the pallet, so most working tools are liquidated or scrapped.

What this page is doingFollows each path to its value.
5

The Cost of the Reverse Flow

Handling costs

CostPer unitTotal
Freight from stores to warehouse$4.20$600,000
Storage at $0.65 a week for eleven weeks$7.15$1,022,000
Inspection and processing$3.40$486,000
Total$14.75$2,108,000

Handling costs about $2.11 million against $1.46 million recovered, a net loss of about $650,000, before counting the credits Halstrom gives retailers for returned tools, which reverse the original sales. Storage, driven entirely by waiting, is the largest single cost.

What this page is doingTotals what returns cost to handle.
6

The Cost of Waiting

Guide et al. (2006) showed that commercial returns lose value steadily while they wait and that the speed of a reverse supply chain should be set by how fast that value decays. Halstrom's tools are replaced by new models about every three years, and liquidators and reconditioned-tool buyers pay less for older date codes. From prices on reconditioned tools of different ages, Halstrom loses about 1.1 percent of a working tool's value each week. Over eleven weeks, that is about 12 percent. Applied to the 98,600 working tools at $52 each, waiting costs about $615,000 a year in lost value, on top of the $1.02 million in storage.

Blackburn et al. (2004) distinguish reverse supply chains designed for cost efficiency, with centralized and delayed processing, from responsive ones designed to recover value quickly by sorting early. Halstrom's chain is efficient in the narrowest sense, consolidating pallets to save freight, but its delay wastes far more than consolidation saves, which suggests it needs to be responsive for its working tools.

What this page is doingEstimates value lost to time.
7

Returns by Product and Channel

Returns are not spread evenly. Drill and driver kits, the best sellers, return at about 5.9 percent, while circular saws return at 9.4 percent, mostly as unused or heavily used tools after a single project, and impact drivers at 7.1 percent. By channel, the online stores of the three chains return at about 11 percent, almost twice the rate of their physical stores, because buyers cannot hold the tool before ordering and because free return shipping makes sending it back easy. One chain accounts for 47 percent of returns but 41 percent of sales, and its stores hold returns longest, about eight weeks on average, because it ships them only when a full pallet has accumulated. These differences matter for the redesign: gatekeeping will help most where no-fault-found returns are common, in drill kits sold in stores, while the saw returns point to a policy question rather than a process one, and the slowest chain is where faster shipping would recover the most value.

What this page is doingShows where returns concentrate.
8

Returns Are Not Only Loss

Petersen and Kumar (2009), working with a direct marketer's purchase records, showed that moderate returning was followed by more future buying, and that a lenient policy supported those later purchases. Returns are partly a cost of selling. The analysis therefore aims to reduce unnecessary returns, such as uncharged batteries, and to recover value from the rest, not to make returning harder.

What this page is doingPlaces returns in context.
9

Questions for the Redesign

The analysis leaves four questions, each tied to a specific finding above. Can stores screen out returns that are not really problems, such as uncharged batteries, before they enter the flow? Can returns be tested and sorted within weeks rather than months? Which disposition should each kind of return receive, given its condition and value? And should Halstrom process returns itself rather than through a warehouse paid by the pallet? Underneath all four is a fifth: whether Halstrom wants a reverse chain built for low freight cost or one built to recover value quickly. The figures above suggest the second, since the value lost to waiting is larger than any saving consolidation produces, but the answer depends on what a faster chain would cost to run, which Project One will estimate.

What this page is doingSets up Project One.
10

Conclusion

Two-thirds of Halstrom's returns work, yet 60 percent of all returns are scrapped. The reverse flow loses about $650,000 a year in handling and another $615,000 in value while tools wait. Speed and sorting, not lower freight rates, are where the money is. A reverse flow that tested and sorted tools within a few weeks, and sent each to the disposition its condition deserved, would recover far more of the value Halstrom now throws away.

What this page is doingSummarizes the findings.
11

References

Blackburn, J. D., Guide, V. D. R., Jr., Souza, G. C., & Van Wassenhove, L. N. (2004). Reverse supply chains for commercial returns. California Management Review, 46(2), 6-22. https://doi.org/10.2307/41166207

Guide, V. D. R., Jr., Souza, G. C., Van Wassenhove, L. N., & Blackburn, J. D. (2006). Time value of commercial product returns. Management Science, 52(8), 1200-1214. https://doi.org/10.1287/mnsc.1060.0522

Petersen, J. A., & Kumar, V. (2009). Are product returns a necessary evil? Antecedents and consequences. Journal of Marketing, 73(3), 35-51. https://doi.org/10.1509/jmkg.73.3.035

What the QSO 425 Module 2 instructions ask for

The QSO 425 Module 2 assignment usually asks students to analyze a company's returns. Expect to describe return volumes and rates, classify returns by reason and condition, trace current disposition paths and what each recovers, estimate the costs of handling returns, including transportation, storage, processing and credits, and identify the main problems and opportunities. Strong assignments base the analysis on data by return reason, distinguish costs from recovered value, put a number on the value lost while returns wait, connect the findings to research on reverse supply chains and end with the specific questions a redesign must answer rather than a list of general recommendations.

How this QSO 425 Module 2 returns analysis assignment example is built

The assignment analyzes a year of returns at Halstrom Tool Company, a fictional South Carolina cordless tool maker. Of 142,900 returned tools, 38 percent had no fault found, 31 percent were unused, 22 percent were defective and 9 percent were damaged in shipping. They spent an average of eleven weeks between the store and a disposition decision. Freight, storage and processing cost about $2.11 million; restocking, liquidation, refurbishment and scrap recovered about $1.46 million, a net loss of about $650,000. The wait cost about $615,000 more in lost value on resalable tools alone. Guide and colleagues on the time value of returns, Blackburn and colleagues on fast and efficient reverse chains and Petersen and Kumar frame the analysis.

Where the QSO 425 Module 2 rubric puts the points

Marking for the QSO 425 returns analysis looks first at a clear account of return volumes and rates, classification by reason and condition, an accurate trace of dispositions and their recovered value, a complete costing of the reverse flow, an estimate of value lost to time, correct use of research and conclusions that set up the redesign. The strongest analyses show that the disposition a return receives does not match its condition. Credit drops when returns are treated as one category, recovered value is ignored, time is not costed, figures do not reconcile or recommendations are generic. Tables, clear writing and APA citations also count.

QSO 425 Module 2 help: the mistakes that cost points

Start with the totals: units sold, units returned and the return rate. Break returns down by reason, using the company's codes or a sample you inspect, and by disposition: restock, refurbish, liquidate, scrap or recycle. For each disposition, estimate what it recovers per unit and what it costs to get the unit there: freight, storage, processing. Then measure time: how many weeks pass between return and disposition, and how much value a product loses each week. Compare the condition of returns with what happens to them; the gap is the opportunity. A common mistake is reporting only the cost of returns without what they recover; another is ignoring time. End with the questions the redesign must answer.

Get QSO 425 Module 2 written to your instructions

Share the QSO 425 Module 2 instructions and your returns data or scenario. A writer sorts returns by reason and disposition, calculates the full cost of the reverse flow and the value recovered, estimates value lost to waiting, identifies where the money leaks and draws conclusions for the redesign, citing reverse logistics research. Your first QSO 425 paper is free, delivered in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 425 papers and related BS Operations Management samples

QSO 425 Module 2 questions, answered

Where can I find a free QSO 425 Module 2 Returns Analysis Assignment sample?

The complete QSO 425 Module 2 assignment is on this page: an analysis of 142,900 returns at an invented cordless tool maker.

What is the return rate?

The share of units sold that are returned, usually calculated by product, channel or period to identify where returns concentrate.

What does no fault found mean?

A return that the manufacturer's testing shows to work properly, often caused by user error, misunderstanding or buyer's remorse.

What is the time value of returns?

The loss in a returned product's recoverable value for each week it waits before resale or recovery, especially for products with short life cycles.

What is disposition in reverse logistics?

The decision about what to do with a returned item, such as restock, refurbish, remanufacture, harvest parts, liquidate, recycle or dispose.