QSO 425 Module 3 Project One Example

Reviewed by Portia Lambrick, MBA

This QSO 425 Module 3 Project One sample designs a reverse logistics process and network with gatekeeping, a returns center, a disposition decision tree and the economics of the redesign. SNHU QSO 425 (QSO-425) asks for this design in Module 3 of its reverse logistics course in the BS Operations Management. The company is Halstrom Tool Company, an invented South Carolina cordless tool maker whose working returns wait eleven weeks and are mostly scrapped. The project screens returns at the store, moves processing to a company-run center, sends each tool to the disposition its condition deserves and shows what the change is worth after its costs.

CourseQSO 425 Reverse Logistics
ModuleModule 3
Paper typeundergraduate project designing a reverse logistics process and network with gatekeeping, a returns center, a disposition decision tree and the economics of the redesign
LengthAbout 1,110 words, 7 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 425 Module 3

1

Sort Early, Decide Fast: A Reverse Logistics Design for Halstrom Tool Company

[Student Name]

Southern New Hampshire University

QSO 425: Reverse Logistics

Project One: Reverse Logistics Design

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe process design, volumes and economics for Halstrom Tool Company in this QSO 425 project are fictional.
2

Sort Early, Decide Fast: A Reverse Logistics Design for Halstrom Tool Company

Introduction

Module 2's analysis established three facts: most of Halstrom Tool Company's 142,900 annual returns work, they sit for almost three months before anyone decides their fate and most end up scrapped. Handling them loses roughly $0.65 million a year, and the delay destroys about $0.6 million more in value. This project redesigns the flow from the store counter to final disposition, chooses where returns will be processed, sets the rules for each disposition and calculates what the redesign is worth.

What this page is doingStates the design problem.
3

Design Principles

Blackburn et al. (2004) argue that reverse supply chains for commercial returns should be designed for responsiveness when products lose value quickly and for efficiency when they do not, and that the key to responsiveness is sorting returns early, close to where they enter the chain. Halstrom's working tools lose about 1.1 percent of their value a week, fast enough that speed matters, while its defective tools and batteries lose little by waiting. The design therefore sorts early and moves working tools quickly, while defective tools and batteries follow a cheaper, slower path.

What this page is doingSets the direction.
4

Gatekeeping at the Store

Nearly four in ten returns turn out to work on test, and help line calls suggest most of those are uncharged batteries or misunderstanding. The redesign gives each store service desk a charged Halstrom test battery and a laminated three-step check: fit the charged battery, run the tool, check the chuck or blade. If the tool works, the associate offers a call to Halstrom's help line from the counter. The customer may still return the tool, since the stores' policies allow it, but a trial in eight stores last spring cut no-fault-found returns there by 34 percent.

Applied chain-wide, gatekeeping is assumed to reduce returns by about 18,500 a year, mostly no-fault-found, which lowers the volume entering the flow to about 124,400. The figures below use the original 142,900 for comparability and treat the reduction as an additional benefit.

What this page is doingStops avoidable returns.
5

Where Returns Are Processed

Fleischmann et al. (1997) review reverse network models and note that the choice between central and distributed processing turns on volume, the cost of testing equipment and how quickly products must be sorted. Halstrom's returns arrive from about 2,400 stores. Testing a cordless tool needs fixtures and trained technicians, and consistent decisions matter for reconditioned quality. A single company-run returns center in part of the Greenville plant, about 30,000 square feet, gives consistent testing, access to engineers and parts and no third-party fee per pallet.

Speed comes from collection rather than location. Instead of waiting for a full pallet, stores ship returns weekly in small cartons through the chains' existing back-haul to their distribution centers, which forward them to Greenville. Average time from return to disposition falls from about eleven weeks to about three: one week at the store, one week in transit and up to one week at the center.

What this page is doingChooses the network.
6

Disposition Tree

Disposition rules at the returns center

Condition at intakeTest resultDisposition
Sealed or unused, packaging intactNot testedRestock as new after inspection
Opened, workingPasses full testRecondition: clean, new box, sold as factory reconditioned
DefectiveRepair cost under $18Repair and sell as reconditioned
DefectiveRepair cost $18 or moreHarvest motors, gearboxes and chucks; recycle the rest
Damaged housing, working internalsPasses testHarvest parts
Over five years old or obsolete modelAnyRecycle, or liquidate if working and in demand
Battery packAnySeparate hazardous path, see below

The $18 repair threshold leaves a margin: a repaired tool sells for $58 as reconditioned and costs about $16 to recondition, so an $18 repair still leaves about $24, well above the roughly $9 its parts would bring if harvested. The rules are written so that technicians do not decide disposition by judgment, which keeps reconditioned quality consistent.

What this page is doingSets the rules.
7

Battery Path

Lithium-ion battery packs are regulated as hazardous materials in transport, and damaged packs can catch fire. Under the redesign, stores keep returned packs in the fire-resistant bins they already use for battery recycling, with terminals taped, and ship them separately under the applicable rules for lithium batteries. At the center, packs are tested; those that hold at least 90 percent of rated capacity are sold as reconditioned packs, and the rest go to a certified battery recycler that recovers cobalt, nickel and lithium. No pack is scrapped with general waste.

What this page is doingHandles hazardous returns.
8

Economics of the Redesign

Dispositions after redesign

DispositionShareUnitsValue per unitTotal
Restocked as new22%31,400$52.00$1,635,000
Reconditioned38%54,300$42.00 net$2,281,000
Parts harvested10%14,300$9.00$129,000
Liquidated8%11,400$11.50$131,000
Recycled22%31,400$0.60$19,000
Total recovered142,900$4,195,000

Handling now costs about $3.60 a unit in freight, $1.95 in storage for three weeks and $2.20 in variable processing, about $1.11 million, plus about $1.1 million a year for the center's 22 technicians and staff, equipment and space. Total cost is about $2.21 million against $4.20 million recovered, a net gain of about $1.98 million, compared with a net loss of $650,000 today: an improvement of about $2.63 million.

Two adjustments reduce that. Some buyers of reconditioned tools would otherwise have bought new ones. Assuming 20 percent of reconditioned sales replace new sales, Halstrom would lose about 10,900 new sales at about $44 of margin each, roughly $480,000 a year. The net improvement is therefore about $2.15 million a year, plus the unquantified benefit of gatekeeping. One-time costs are about $1.4 million to fit out the center and $260,000 for store test kits and training, $1.66 million in total, recovered in under a year.

What this page is doingCalculates what it is worth.
9

Closing the Loop

Closed-loop supply chain research has shifted its focus from the mechanics of recovery to returns as a business process tied to design, marketing and profit (Guide & Van Wassenhove, 2009). The returns center would also give Halstrom's engineers, for the first time, a steady flow of failure data: which gearboxes fail, which chucks are misunderstood and which chargers are blamed for batteries that were never charged.

What this page is doingExplains the wider benefit.
10

Implementation

The center would be fitted out over five months, starting with the battery path because it carries the most risk. Gatekeeping would roll out chain by chain, starting with the chain whose stores ran the trial. The third-party warehouse contract would end after a two-month overlap. Measures would be cycle time from return to disposition, the share of working tools restocked or reconditioned and net recovery per return.

What this page is doingOutlines the steps.
11

Conclusion

Sorting returns early, processing them in a company-run center within three weeks and routing each by explicit rules would turn Halstrom's reverse flow from a loss of about $650,000 a year into a gain of about $1.5 million after lost sales, for a one-time investment of about $1.66 million.

What this page is doingSummarizes the design.
12

References

Blackburn, J. D., Guide, V. D. R., Jr., Souza, G. C., & Van Wassenhove, L. N. (2004). Reverse supply chains for commercial returns. California Management Review, 46(2), 6-22. https://doi.org/10.2307/41166207

Fleischmann, M., Bloemhof-Ruwaard, J. M., Dekker, R., van der Laan, E., van Nunen, J. A. E. E., & Van Wassenhove, L. N. (1997). Quantitative models for reverse logistics: A review. European Journal of Operational Research, 103(1), 1-17. https://doi.org/10.1016/S0377-2217(97)00230-0

Guide, V. D. R., Jr., & Van Wassenhove, L. N. (2009). The evolution of closed-loop supply chain research. Operations Research, 57(1), 10-18. https://doi.org/10.1287/opre.1080.0628

What the QSO 425 Module 3 instructions ask for

QSO 425 Project One usually asks students to design or redesign a reverse logistics process or network for an organization. Expect to describe the current reverse flow and its problems, propose a design covering gatekeeping, collection, transportation, processing location, sorting and disposition, set performance targets such as cycle time and recovery rate, address special requirements such as hazardous materials, and evaluate the design's costs and benefits. Strong projects build on an analysis of returns by reason, screen out avoidable returns at the start, match the speed of the chain to how fast products lose value, make disposition decisions with explicit rules, account for fixed costs and side effects such as cannibalization and explain how the design will be implemented.

How this QSO 425 Module 3 project one example is built

The project redesigns the reverse flow at Halstrom Tool Company, a fictional South Carolina cordless tool maker. Store staff screen returns with a charged test battery and a scripted call to Halstrom's help line. Returns ship weekly to a company-run returns center in Greenville rather than waiting for pallets to fill. A disposition tree restocks sealed tools, reconditions working ones, repairs defective tools when repair costs under $18, harvests parts from the rest and recycles what remains, with batteries on a separate hazardous path. The wait falls from eleven weeks to three. After a $1.1 million annual center cost and about $480,000 of lost new-tool sales, the reverse flow improves by about $2.1 million a year for a one-time $1.66 million.

Where the QSO 425 Module 3 rubric puts the points

Instructors grading QSO 425 Project One look at a clear account of the current flow and its problems, a complete design from gatekeeping to final disposition, a justified choice of processing location, explicit disposition rules tied to condition and value, cycle time and recovery targets, proper handling of hazardous items, a costing that includes fixed costs and cannibalization and an implementation outline. Projects that score highest connect every design choice to a finding from the returns analysis. Credit drops when gatekeeping is missing, disposition is left to judgment, fixed costs or lost sales are ignored, batteries are treated like other returns or benefits are claimed without calculation. Tables, clarity and APA citations count too.

QSO 425 Module 3 help: the mistakes that cost points

Start from your returns analysis: what comes back, why and how long it waits. Design the front end first, gatekeeping that stops avoidable returns, such as products that only needed instructions or charging. Then decide where returns are processed: centralized for control and scale, decentralized for speed, or a mix. Build a disposition tree with rules: what condition sends a product to restock, recondition, repair, parts or recycling, using cost and value thresholds. Set targets for cycle time and recovery rate. Handle hazardous items on their own path. Finally, cost the design, including fixed costs of a center and any sales lost when reconditioned products replace new ones. A common mistake is a design with no rules; another is counting recovered value without its costs.

Get QSO 425 Module 3 written to your instructions

Upload the QSO 425 Project One guidelines and describe the company and its returns. A writer designs the reverse process from gatekeeping to final disposition, chooses where returns are processed, builds the disposition decision tree, sets cycle time targets, handles hazardous items and calculates the costs, recovered value and net effect of the redesign, citing research. Your first QSO 425 project is free, finished in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 425 papers and related BS Operations Management samples

QSO 425 Module 3 questions, answered

Where can I find a free QSO 425 Module 3 Project One sample?

This page holds the complete QSO 425 Project One: a returns process, network and disposition tree for an invented cordless tool maker.

What is gatekeeping in reverse logistics?

Screening returns at the point of entry so that items that should not be returned, or problems that can be solved on the spot, do not enter the reverse flow.

What is a centralized returns center?

A dedicated facility where returns from many locations are received, tested, sorted and dispositioned, offering consistent decisions and economies of scale.

What is a disposition decision tree?

A set of rules that route each returned item to restock, repair, refurbish, remanufacture, parts recovery, liquidation or recycling according to its condition and value.

What is cannibalization in remanufacturing?

When customers who would have bought a new product buy a refurbished or remanufactured one instead, reducing new sales.