| Course | QSO 530 Applied Statistics for Managers |
|---|---|
| Module | Module 5 |
| Paper type | graduate assignment stating hypotheses, running a two-sample test on a randomized business pilot and reporting the p-value with a confidence interval, effect size and power |
| Length | About 1,050 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 530 Module 5
Two Dollars and Ten Cents, p = 0.044: Testing Kettle Pond's Member App
[Student Name]
Southern New Hampshire University
QSO 530: Applied Statistics for Managers
Hypothesis Testing Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Two Dollars and Ten Cents, p = 0.044: Testing Kettle Pond's Member App
Introduction
Kettle Pond Food Cooperative's member app costs about $180,000 a year to operate. The board needs to know whether it raises members' spending enough to justify that cost. Comparing app users with other members would mislead, because heavier shoppers were more likely to download it. The co-op therefore ran a randomized pilot. This assignment states the hypotheses, tests them, reports the size and precision of the effect and assesses whether the pilot was large enough to answer the question.
Design
In June, 12,000 active members who had not yet downloaded the app were randomly divided into two groups of 6,000. Members in the invited group received an email and a register receipt message inviting them to download the app, with a $5 welcome credit. Members in the control group received nothing. Spending was measured from card records for ten weeks. The analysis compares the groups as randomized, whether or not invited members actually downloaded the app, about 41 percent of whom did. This intention-to-treat comparison keeps the benefit of random assignment: the groups were alike at the start, so a difference at the end can be credited to the invitation.
Hypotheses
Let the population mean weekly spending of invited members be μ1 and that of control members μ2. The null hypothesis is H0: μ1 − μ2 = 0, that the invitation made no difference. The alternative is H1: μ1 − μ2 ≠ 0. A two-sided test was chosen because the app could lower spending, for example by steering members toward discounted items, and the board should know if it did. The 5 percent threshold was fixed in the analysis plan, written before any spending data were pulled.
Checking Conditions
The two-sample t-test requires independent observations, which random assignment of separate households provides, and either roughly normal data or large samples. Weekly spending is skewed, as baskets are, but with 6,000 members per group, averages of this size behave very nearly normally, as the central limit theorem implies. The standard deviations of the two groups, $58 and $56, are similar, but Welch's form of the test, which lets each group keep its own variance, was used anyway; with groups this large and this similar, it gives the same result.
Results
Average weekly spending over ten weeks
| Group | Members | Mean | Standard deviation |
|---|---|---|---|
| Invited to the app | 6,000 | $90.20 | $58 |
| Control | 6,000 | $88.10 | $56 |
| Difference | $2.10 |
Each group's variance divided by its size, 3,364 over 6,000 and 3,136 over 6,000, sums to about 1.08, and the root of that sum, about $1.04, measures the uncertainty in the gap. The t statistic is $2.10 divided by $1.04, about 2.02, and the two-sided p-value is about 0.044. Because 0.044 is below 0.05, the null hypothesis is rejected: the data are unlikely if the invitation had no effect at all.
Size and Precision
Adding and subtracting 1.96 standard errors around $2.10 gives a 95 percent range of about $0.06 to $4.14 a week. The effect could be as small as a few cents or as large as about $4. Cumming (2014) argues that a p-value cannot show how large an effect is and that estimates with their intervals should be the main result reported. Here the difference is about 0.04 standard deviations, very small by the conventions Cohen (1992) proposed, in which 0.2 counts as small. That does not make it unimportant: across 41,000 households, an extra $2.10 a week would be about $4.5 million a year in sales. But the gross margin on that spending, after the cost of the app's deals, matters more than the sales figure, and at the lower end of the interval the app would not cover its cost.
Invitations Versus Downloads
Only about 41 percent of invited members, roughly 2,460, downloaded the app. The $2.10 is therefore the effect of being invited, averaged over members who downloaded it and members who ignored the invitation. If the invitation affected spending only through the app, the effect among those who downloaded it would be about $2.10 divided by 0.41, roughly $5.10 a week. That figure is useful for judging what the app does for its users, but it rests on that assumption. Comparing downloaders with invited members who did not download would give a much larger gap, about $6.80, because heavier shoppers were more likely to download; that comparison mixes the app's effect with differences between the people who chose it, and random assignment exists to avoid exactly that.
Power
Cohen (1992) showed how the power of a test depends on the effect size, the sample size and the significance level. The board's finance committee estimated that the app needs to raise spending by about $2 a week per household to cover its cost. With standard deviations near $57 and 6,000 members per group, the pilot had only about a 49 percent chance of detecting a true difference of $2. Detecting it with 80 percent power would require about 12,700 members in each group. In other words, the pilot was nearly as likely to miss a worthwhile effect as to find it, and its significant result sits close to the boundary.
What the Result Supports
Gigerenzer (2004) criticizes the ritual of treating p below 0.05 as a verdict, and the result here shows why. The test says the invitation probably increased spending by something more than zero. It does not say whether the increase is large enough to justify $180,000 a year, and the interval includes values that would not. The pilot also measured only ten weeks, when a novelty effect may have inflated spending. The evidence supports keeping the app for now and running a larger pilot, with about 13,000 members per group for six months, before the board makes a final decision.
Conclusion
Members invited to the app spent about $2.10 a week more than a randomized control group, and a gap that large would turn up only about 4.4 percent of the time if the app did nothing. The effect is very small relative to the variation in spending, its interval runs from almost nothing to about $4 and the pilot had little better than even odds of detecting the effect the app needs. Significance establishes that the effect is probably not zero; a larger test is needed to establish whether it is large enough.
References
Cohen, J. (1992). A power primer. Psychological Bulletin, 112(1), 155-159. https://doi.org/10.1037/0033-2909.112.1.155
Cumming, G. (2014). The new statistics: Why and how. Psychological Science, 25(1), 7-29. https://doi.org/10.1177/0956797613504966
Gigerenzer, G. (2004). Mindless statistics. The Journal of Socio-Economics, 33(5), 587-606. https://doi.org/10.1016/j.socec.2004.09.033
What the QSO 530 Module 5 instructions ask for
The QSO 530 Module 5 assignment typically asks students to test a hypothesis about a business question. Expect to state null and alternative hypotheses, choose a significance level, select an appropriate test such as a one-sample, two-sample or paired t-test or a test of proportions, check its assumptions, compute the test statistic and p-value, reach a conclusion and interpret it for managers. Strong assignments describe how the data were collected, especially whether groups were randomly assigned, report a confidence interval and effect size alongside the p-value, consider whether the study had enough power, distinguish statistical from practical significance and explain what decision the result supports and what further evidence is needed.
How this QSO 530 Module 5 hypothesis testing assignment example is built
The assignment tests whether the member app raised spending at Kettle Pond Food Cooperative, a fictional grocery cooperative with seven stores, using a randomized pilot in which 6,000 members were invited to the app and 6,000 were not. Over ten weeks, invited members spent an average of $90.20 a week against $88.10, a difference of $2.10. A two-sample t-test gives a statistic of about 2.02 and a p-value of about 0.044, rejecting the null hypothesis at the 5 percent level. But the 95 percent interval runs from about $0.06 to $4.14, the effect size is about 0.04 standard deviations and the pilot had only about a 49 percent chance of detecting a $2 difference. Cohen, Cumming and Gigerenzer inform the analysis.
Where the QSO 530 Module 5 rubric puts the points
The QSO 530 hypothesis testing assignment is commonly graded on correctly stated hypotheses, a justified choice of test and significance level, a check of the test's conditions, correct calculation of the statistic and p-value, a correct conclusion, a confidence interval and effect size, attention to power and an interpretation that separates statistical from practical significance. The strongest assignments show what the result does and does not justify for the decision. Credit drops when hypotheses are stated about samples rather than populations, the p-value is read as the probability the null is true, significance is equated with importance, power is ignored or a nonsignificant result is read as proof of no effect. Tables, clear writing and APA citations complete the grade.
QSO 530 Module 5 help: the mistakes that cost points
Write the hypotheses about the population: the null states no difference or no effect, and the alternative states the difference you are testing for. Choose the significance level before looking at the results. Pick the test that matches the design, such as a two-sample t-test for two independent groups or a paired test for the same people measured twice, and check its conditions. Calculate the test statistic and p-value, then go further: give the confidence interval for the difference, an effect size, for instance the gap expressed in standard deviation units, and the study's power to detect a difference that would matter. Explain what the result means for the decision in dollars or other business terms. Reports often stop at "significant," which tells a manager almost nothing about how large or certain the effect is.
Get QSO 530 Module 5 written to your instructions
Share the QSO 530 Module 5 instructions and your data. A writer states the null and alternative hypotheses, chooses and justifies the test, checks its conditions, calculates the test statistic and p-value, reports a confidence interval and effect size, assesses power and explains what the result means for the decision, citing research on significance testing. Your first QSO 530 paper is free, finished in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 530 papers and related MS Operations Management samples
- QSO 530 Module 1 Discussion: Data, Variables and the Decision
- QSO 530 Module 2 Descriptive Statistics Assignment: What a Typical Basket Looks Like
- QSO 530 Module 3 Discussion: Why Checkout Waits Are Not Normal
- QSO 530 Module 4 Confidence Interval Assignment: What Members Think, Within a Margin
- QSO 530 Module 6 Discussion: What p Equals 0.044 Means
- QSO 530 Module 7 ANOVA and Chi-Square Assignment: Seven Stores Compared
- QSO 530 Module 8 Regression Assignment: What Moves Weekly Store Sales
- QSO 530 Module 9 Final Project: The Statistical Analysis Report
- QSO 530 Module 10 Discussion: Reporting Numbers Honestly
- MKT 678 Module 7 Discussion: Licensing and Brand Dilution
- CSR 610 Module 10 Final Project: An Ethics and Culture Strategy
- FIN 620 Module 7 Discussion: Paying for a Second Credit Rating
- OL 645 Module 4 Discussion: Workplace Surveillance and Privacy
QSO 530 Module 5 questions, answered
Where can I find a free QSO 530 Module 5 Hypothesis Testing Assignment sample?
The complete QSO 530 Module 5 assignment is on this page: testing whether a member app raised spending at an invented grocery cooperative.
What is a p-value?
A measure of how surprising the data would be if there were truly no effect; a small value is evidence against no effect, not the chance that no effect exists.
Why report a confidence interval with a hypothesis test?
Because the interval shows how large the effect could plausibly be, which matters for decisions, while the p-value only measures evidence against no effect.
What is statistical power?
The probability that a study will detect an effect of a given size if it exists, which depends on the sample size, the variability and the significance level.
How does statistical significance differ from practical significance?
A statistically significant effect is one the data show is probably not zero; a practically significant one is big enough to change what a manager would do.