QSO 530 Module 7 ANOVA and Chi-Square Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 530 Module 7 ANOVA and Chi-Square Assignment sample compares several group means with one-way ANOVA and post hoc tests and tests the association between categorical variables with chi-square. SNHU QSO 530 (QSO-530) assigns group comparisons in Module 7 of the applied statistics course in the MS Operations Management. The groups are the seven stores of Kettle Pond Food Cooperative, an invented grocery cooperative whose managers want to know whether their stores really differ and why app use varies so much from store to store. The paper separates differences that are real from differences that are large enough to matter and finds the variable that lies behind them.

CourseQSO 530 Applied Statistics for Managers
ModuleModule 7
Paper typegraduate assignment comparing several group means with one-way ANOVA and post hoc tests and testing association between categorical variables with chi-square
LengthAbout 1,050 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 530 Module 7

1

Significant but Small, and Explained by Age: Comparing Kettle Pond's Seven Stores

[Student Name]

Southern New Hampshire University

QSO 530: Applied Statistics for Managers

ANOVA and Chi-Square Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe samples, test results and stores of Kettle Pond Food Cooperative in this QSO 530 assignment are invented.
2

Significant but Small, and Explained by Age: Comparing Kettle Pond's Seven Stores

Introduction

Kettle Pond Food Cooperative's store managers are compared each month on average basket size, and some argue that the differences reflect management rather than location. Separately, the board has noticed that a much larger share of Burlington members use the new app than members elsewhere. This assignment uses one-way analysis of variance to test whether mean basket size differs among the seven stores and how much, and a chi-square test to examine what lies behind differences in app use.

What this page is doingSets the two questions.
3

Data

For the store comparison, 300 member baskets were drawn at random from each store's transactions during the 12 weeks analyzed in Module 2, giving 2,100 baskets. Sampling equal numbers from each store keeps the comparison balanced and avoids the problem of testing with hundreds of thousands of records, where almost any difference would be significant. For app use, the analysis uses the 612 respondents to the member survey described in Module 4, who reported whether they use the app at least once a week and their age group.

What this page is doingDescribes the samples.
4

One-Way ANOVA

The null hypothesis is that mean basket size is the same at all seven stores; the alternative is that at least one mean differs.

Sample mean basket size by store, 300 baskets each

StoreMeanStandard deviation
Montpelier$46.10$46
Lebanon$43.20$43
Hanover$41.30$42
Brattleboro$39.90$41
St. Johnsbury$37.20$38
Middlebury$35.50$37
Burlington Pine Street$27.80$32

The ANOVA gives F of about 6.4 with 6 and 2,093 degrees of freedom and a p-value below 0.001, so the null hypothesis is rejected: the stores do not all have the same mean basket size. But the effect size, eta-squared, is about 0.02, meaning that store accounts for only about 2 percent of the variation in basket size. Almost all of the variation lies between baskets within the same store, between the shopper buying a coffee and the family doing its weekly shop.

What this page is doingTests whether store means differ.
5

Checking Conditions

Basket sizes are strongly skewed, and the standard deviations range from $32 at Burlington to $46 at Montpelier. Lumley et al. (2002) showed that with large samples, tests of means are robust to non-normal data, but unequal variances can still affect results when group sizes differ. Here the groups are equal in size and the ratio of the largest to the smallest variance is about two, within the range where ANOVA performs well. As a further check, the analysis was repeated using Welch's ANOVA, which does not assume equal variances, and on the logarithm of basket size, which reduces skew. Both gave the same conclusion.

What this page is doingTests whether the result is robust.
6

Which Stores Differ

Seven stores yield 21 possible pairs. Running 21 separate t-tests at the 5 percent level would make at least one false positive likely even if no stores differed. Benjamini and Hochberg (1995) describe how the expected proportion of false discoveries can be controlled when many tests are made; for a set of pairwise comparisons after ANOVA, Tukey's method controls the chance of any false difference. With the pooled standard deviation of about $40 and 300 baskets per store, Tukey's threshold for a significant difference is about $9.70.

By that standard, Burlington's mean is lower than those of Montpelier, Lebanon, Hanover and Brattleboro, and Montpelier's is higher than Middlebury's. No other pair differs by more than the threshold. The monthly ranking, which places every store in order, therefore implies more precision than the data support: five of the seven stores cannot be reliably told apart. And Burlington's lower figure reflects its role as a downtown store with many small visits, which Module 2 documented, rather than poor management.

What this page is doingCompares pairs with control for multiple tests.
7

Chi-Square Test

The second question is whether app use is associated with age. The null hypothesis is that weekly app use is independent of age group.

Weekly app use by age group, survey respondents

Age groupUse weeklyDo notTotalShare using weekly
Under 3534336751%
35 to 6411821933735%
65 and over3817020818%
Total19042261231%

All expected counts exceed 20, so the chi-square approximation is reliable. The test gives chi-square of about 30.5 with 2 degrees of freedom and a p-value below 0.001. Cramér's V is about 0.22, a moderate association. Members under 35 are nearly three times as likely as those 65 and over to use the app weekly.

What this page is doingExamines app use by age.
8

What Lies Behind the Store Differences

Membership records show that about 44 percent of Burlington members have the app, against 22 to 36 percent at the other stores, and some directors concluded that Burlington staff promote it better. But Burlington's members are much younger: about 38 percent are under 35, against about 18 percent elsewhere. When app adoption is compared within age groups, Burlington's lead shrinks to two or three percentage points in each group. Bickel et al. (1975) showed, in their study of graduate admissions, that an apparent difference between groups can disappear or reverse when a third variable that differs between them is taken into account. Age plays that role here.

What this page is doingConsiders a confounding variable.
9

What the Differences Mean in Practice

The largest reliable gap among the full-size stores, about $10.60 a basket between Montpelier and Middlebury, sounds large, but Middlebury is the smaller store, with a narrower range of bulk and household goods, and its members do more of their weekly shopping elsewhere. Closing the gap would mean changing what the store carries, not how it is managed. A better monthly report would show each store's median basket with an interval and mark only the differences that the data support, so that managers are not judged on gaps that chance alone could produce. For the app, the age pattern matters more than any store pattern: deals that suit older members, such as printed coupons at the register for those who prefer them, could reach the members the app now misses.

What this page is doingPuts the results in business terms.
10

Conclusion

Kettle Pond's stores differ in mean basket size by more than chance would explain, but store accounts for only about 2 percent of the variation, and only the urban Burlington store and the gap between Montpelier and Middlebury stand out after controlling for multiple comparisons. Monthly rankings should be replaced by a comparison that shows which differences are real. App use depends strongly on age, which explains most of Burlington's high adoption, so the app's appeal to older members, not one store's promotion, is the issue for the board.

What this page is doingSummarizes the findings.
11

References

Benjamini, Y., & Hochberg, Y. (1995). Controlling the false discovery rate: A practical and powerful approach to multiple testing. Journal of the Royal Statistical Society: Series B (Methodological), 57(1), 289-300. https://doi.org/10.1111/j.2517-6161.1995.tb02031.x

Bickel, P. J., Hammel, E. A., & O'Connell, J. W. (1975). Sex bias in graduate admissions: Data from Berkeley. Science, 187(4175), 398-404. https://doi.org/10.1126/science.187.4175.398

Lumley, T., Diehr, P., Emerson, S., & Chen, L. (2002). The importance of the normality assumption in large public health data sets. Annual Review of Public Health, 23, 151-169. https://doi.org/10.1146/annurev.publhealth.23.100901.140546

What the QSO 530 Module 7 instructions ask for

The QSO 530 Module 7 assignment usually asks students to compare more than two groups or test relationships between categorical variables. Expect to state hypotheses, run a one-way analysis of variance and interpret the F statistic, use post hoc tests to identify which groups differ, conduct a chi-square test of independence on a contingency table, check the conditions for each test and explain the results. Strong assignments report effect sizes as well as p-values, control for the number of comparisons made, check whether unequal variances or skew affect the conclusions, ask whether a third variable explains an association and translate each finding into what managers should or should not conclude.

How this QSO 530 Module 7 anova and chi-square assignment example is built

The assignment compares the seven stores of Kettle Pond Food Cooperative, a fictional grocery cooperative, using a random sample of 300 member baskets from each. A one-way ANOVA gives F of about 6.4 with p below 0.001, but store explains only about 2 percent of the variation in basket size, and Tukey comparisons separate only the urban Burlington store from the four largest stores and Montpelier from Middlebury. A chi-square test on the member survey finds weekly app use strongly associated with age, chi-square about 30.5 with a Cramér's V of 0.22, from 51 percent of members under 35 to 18 percent of those 65 and over, which explains most of Burlington's high app adoption. Lumley and colleagues, Benjamini and Hochberg and Bickel and colleagues inform the analysis.

Where the QSO 530 Module 7 rubric puts the points

The QSO 530 ANOVA and chi-square assignment is commonly graded on correctly stated hypotheses, appropriate tests for the data, checks of conditions such as equal variances and expected counts, correct calculation and interpretation of F and chi-square statistics, post hoc comparisons with control for multiple testing, effect sizes, attention to confounding variables and conclusions stated in business terms. The strongest assignments show that a significant difference can be small or explained by something else. Credit drops when a significant F is read as all groups differing, many pairwise tests are run without adjustment, expected counts are too small, effect sizes are missing or associations are treated as causes. Tables, clear writing and APA citations complete the grade.

QSO 530 Module 7 help: the mistakes that cost points

State the question each test answers: ANOVA asks whether the means of several groups are all equal, and chi-square asks whether two categorical variables are independent. Check conditions first: for ANOVA, roughly similar spreads and either normal data or large groups; for chi-square, expected counts of at least five in each cell. Run the test and report the statistic, degrees of freedom and p-value, then an effect size such as eta-squared for ANOVA or Cramér's V for chi-square. If ANOVA is significant, use a post hoc method such as Tukey's to find which pairs differ, rather than many separate t-tests. Then ask whether another variable, such as customer age or store size, could explain the pattern. Papers frequently stop at a significant result without saying how large it is or what lies behind it.

Get QSO 530 Module 7 written to your instructions

Share the QSO 530 Module 7 instructions and your data. A writer states the hypotheses, checks the conditions for ANOVA and chi-square, runs the tests, reports effect sizes such as eta-squared and Cramér's V, uses post hoc comparisons with an adjustment for multiple tests, looks for variables that explain group differences and interprets the results for managers, citing statistical research. Your first QSO 530 paper is free, prepared within roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 530 papers and related MS Operations Management samples

QSO 530 Module 7 questions, answered

Where can I find a free QSO 530 Module 7 ANOVA and Chi-Square Assignment sample?

The complete QSO 530 Module 7 assignment is on this page: comparing seven stores and app use by age at an invented grocery cooperative.

What does a one-way ANOVA test?

Whether the means of three or more groups are all equal, by comparing variation between group means with variation within groups.

Why use post hoc tests after ANOVA?

Because a significant F shows only that some means differ; post hoc tests identify which pairs differ while controlling the overall error rate.

What does a chi-square test of independence show?

Whether the distribution of one categorical variable differs across the categories of another more than chance would explain.

What is Cramér's V?

An effect size for chi-square tests ranging from 0 to 1 that shows how strong the association between two categorical variables is.