| Course | QSO 530 Applied Statistics for Managers |
|---|---|
| Module | Module 2 |
| Paper type | graduate assignment summarizing a large business data set with measures of center, spread and shape, graphs and comparisons between groups |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 530 Module 2
Thirty-Eight Dollars on Average, Twenty-Four in the Middle: Describing Kettle Pond's Baskets
[Student Name]
Southern New Hampshire University
QSO 530: Applied Statistics for Managers
Descriptive Statistics Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Thirty-Eight Dollars on Average, Twenty-Four in the Middle: Describing Kettle Pond's Baskets
Introduction
Kettle Pond Food Cooperative's board receives one figure for basket size each month: the average sale per transaction. Before the board can judge whether the new member app changes how people shop, it needs a fuller picture of how they shop now. This assignment describes 710,000 checkout transactions from the 12 weeks ending in September across the co-op's seven stores, examines the shape of the distribution and its outliers and compares members with other shoppers and the stores with one another.
Center and Spread
Basket size, all transactions, 12 weeks
| Measure | Value |
|---|---|
| Transactions | 710,000 |
| Mean | $38.40 |
| Median | $24.10 |
| Standard deviation | $41.20 |
| 10th percentile | $6.20 |
| 25th percentile | $11.80 |
| 75th percentile | $49.60 |
| 90th percentile | $89.00 |
The mean, the figure the board sees, is $14.30 above the median. Half of all baskets are under about $24, and the middle half run from about $12 to about $50. Because the standard deviation exceeds the mean, the distribution cannot be anything like symmetric: subtracting twice the spread from the average lands at a negative basket. Tukey (1962) argued that analysts should look at data closely before applying formal methods, and here a single average would hide most of what matters.
Shape
A histogram of basket size rises steeply to a peak around $8 to $12, the coffee, lunch and single-item visits, and then declines in a long tail that stretches past $300. Micceri (1989), examining hundreds of real data sets, found that most were far from normal, with skew and heavy tails common, and grocery baskets are a clear example.
Share of transactions and of sales by basket size
| Basket size | Share of transactions | Share of sales |
|---|---|---|
| Under $10 | 27% | 4% |
| $10 to $49.99 | 48% | 31% |
| $50 to $89.99 | 15% | 27% |
| $90 and over | 10% | 38% |
Small baskets make up more than a quarter of visits but only 4 percent of sales, while the largest tenth bring in 38 percent. The co-op's sales depend heavily on a minority of big weekly shops. A change that adds one item to many small baskets matters less than one that keeps a household doing its weekly shop at Kettle Pond.
Outliers
A box plot flags about 31,000 baskets as outliers above the upper fence, about $107, which is expected in data this skewed and does not mean they are errors. A closer look at the 312 baskets over $1,000, the extreme end of that tail, found that almost all were bulk case orders placed by restaurants and cafés through the wholesale account, rung through a regular register. They are genuine sales, but they are not household shopping. Excluding them lowers the mean basket from $38.40 to about $37.70 and leaves the median unchanged. They are reported separately below rather than deleted, and the wholesale team has been asked to ring them on a separate code, so that future reports can set them aside automatically.
Day and Hour
Basket size also varies with the time of the visit, which matters for staffing and for when the app's deals are sent. Weekend baskets are larger: the median on Saturdays and Sundays is about $31, against about $21 on weekdays. Within the day, visits before 10 a.m. are dominated by coffee, bakery and lunch items, with a median basket of about $9, while visits between 4 and 7 p.m. have a median of about $33 and bring in about 34 percent of weekday sales. The pattern is the same at every store except Burlington, where the lunchtime hours produce the largest number of visits but small baskets. The co-op's staffing plan, which spreads cashiers evenly across the afternoon, does not match these peaks, and the app's weekly deals are sent on Monday mornings, when few members are planning a large shop.
Members and Other Shoppers
Basket size by shopper type
| Shopper | Share of transactions | Mean | Median |
|---|---|---|---|
| Member, card scanned | 64% | $44.70 | $29.30 |
| Other shopper | 36% | $27.20 | $15.90 |
Members spend more per visit on either measure. The weighted average of the two means reproduces the overall $38.40. The gap partly reflects who joins: households that do their weekly shopping at the co-op are more likely to buy a membership. That is a reason to be careful when the app, which only members can use, is credited with members' higher spending.
Stores
Basket size by store
| Store | Mean | Median | Standard deviation |
|---|---|---|---|
| Montpelier | $46.10 | $30.40 | $47.00 |
| Lebanon | $43.20 | $28.80 | $44.60 |
| Hanover | $41.30 | $27.00 | $43.10 |
| Brattleboro | $39.90 | $26.10 | $41.00 |
| St. Johnsbury | $37.60 | $25.40 | $38.20 |
| Middlebury | $35.50 | $23.90 | $37.00 |
| Burlington Pine Street | $27.80 | $17.20 | $31.50 |
Every store shows the same skew, with means well above medians and standard deviations about as large as the means. The Burlington store stands apart: it sits in a dense downtown neighborhood with many small lunchtime and walk-in visits, so its lower basket size reflects how it is used, not necessarily how well it is run. Anscombe (1973) warned that the same summary numbers can belong to data that look entirely unlike one another on a graph, and side-by-side box plots of the seven stores show the Burlington store's large cluster of baskets under $10 more clearly than any table.
What the Description Means
Three points follow for the board. First, the monthly average basket should be reported with the median and the share of sales from baskets over $90, because the average moves with a few large orders and says little about the typical visit. Second, any evaluation of the app should compare like with like, since members already spent more than other shoppers before the app existed. Third, store comparisons need to account for what each store is for; the Burlington store's small baskets are part of its role.
Conclusion
Kettle Pond's baskets are strongly right-skewed: the median basket is about $24 while the mean is about $38, a quarter of visits bring in almost nothing and a tenth bring in more than a third of sales. Large outliers are mostly wholesale orders and are now reported separately. Members spend more per visit than other shoppers, and stores differ mainly because they serve different kinds of trips. These descriptions set the baseline for testing the app.
References
Anscombe, F. J. (1973). Graphs in statistical analysis. The American Statistician, 27(1), 17-21. https://doi.org/10.1080/00031305.1973.10478966
Micceri, T. (1989). The unicorn, the normal curve, and other improbable creatures. Psychological Bulletin, 105(1), 156-166. https://doi.org/10.1037/0033-2909.105.1.156
Tukey, J. W. (1962). The future of data analysis. The Annals of Mathematical Statistics, 33(1), 1-67. https://doi.org/10.1214/aoms/1177704711
What the QSO 530 Module 2 instructions ask for
The QSO 530 Module 2 assignment usually asks students to describe a business data set with descriptive statistics. Expect to calculate the mean, median and mode, the range, standard deviation and percentiles, describe the shape of distributions, identify outliers, build graphs such as histograms and box plots, compare groups and interpret the results for a business audience. Strong assignments choose measures that fit the shape of the data, report percentiles when data are skewed, look into unusual values before choosing how to treat them, compare groups on the same measures, use graphs to reveal patterns the summary numbers conceal and connect each finding to a question managers care about.
How this QSO 530 Module 2 descriptive statistics assignment example is built
The assignment summarizes 710,000 checkout transactions from 12 weeks at Kettle Pond Food Cooperative, a fictional grocery cooperative with seven stores. The mean basket is $38.40, but the median is only $24.10 and the standard deviation $41.20, and the distribution is strongly skewed: 27 percent of baskets under $10 bring in 4 percent of sales, while the top tenth bring in 38 percent. The 312 baskets over $1,000 prove to be restaurant bulk orders. Members spend $44.70 a visit against $27.20 for other shoppers, and store medians range from $17.20 at the urban Burlington store to $30.40 at the Montpelier flagship. Tukey, Anscombe and Micceri inform the approach.
Where the QSO 530 Module 2 rubric puts the points
The QSO 530 descriptive statistics assignment is commonly graded on correct calculation of center, spread and position, measures suited to the shape of the data, accurate description of distributions, sensible handling of outliers, fair comparisons between groups, graphs that are clear and honest and interpretation tied to business questions. The strongest assignments show a manager something the average alone would have hidden. Credit drops when only means are reported for skewed data, outliers are deleted without investigation, groups are compared on different measures, graphs distort scale or numbers are listed without saying what they mean. Tables, clear writing and APA citations complete the grade.
QSO 530 Module 2 help: the mistakes that cost points
Before calculating anything, plot the data: a histogram shows the shape and a box plot shows the middle half and the outliers. If the distribution is roughly symmetric, the mean and standard deviation describe it well; if it is skewed, report the median and percentiles too, and say how far apart mean and median are. Investigate outliers by looking at the records themselves, since unusual values can be errors, special cases or the most important customers. Compare groups using the same measures and graphs side by side. For each number you report, add a sentence on what it means for the business. Weak papers usually report a mean and standard deviation for data that are nothing like a bell curve, or remove the largest values because they look inconvenient.
Get QSO 530 Module 2 written to your instructions
Share the QSO 530 Module 2 instructions and your data set. A writer calculates measures of center, spread and position, describes the shape of each distribution, investigates outliers, compares groups fairly, builds graphs that show what the numbers hide and explains what the description means for managers, citing research on data analysis. Your first QSO 530 paper is free, ready in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 530 papers and related MS Operations Management samples
- QSO 530 Module 1 Discussion: Data, Variables and the Decision
- QSO 530 Module 3 Discussion: Why Checkout Waits Are Not Normal
- QSO 530 Module 4 Confidence Interval Assignment: What Members Think, Within a Margin
- QSO 530 Module 5 Hypothesis Testing Assignment: Did the App Change Spending?
- QSO 530 Module 6 Discussion: What p Equals 0.044 Means
- QSO 530 Module 7 ANOVA and Chi-Square Assignment: Seven Stores Compared
- QSO 530 Module 8 Regression Assignment: What Moves Weekly Store Sales
- QSO 530 Module 9 Final Project: The Statistical Analysis Report
- QSO 530 Module 10 Discussion: Reporting Numbers Honestly
- OL 500 Module 2 Milestone One: Case Introduction and Individual-Level Analysis
- FIN 610 Module 4 Discussion: Should Rappahannock Loosen Credit Terms?
- OL 690 Module 7 Discussion: Watching the Scrap Suppliers
- QSO 645 Module 7 Discussion: A Board Member's Relative Wants to Bid
QSO 530 Module 2 questions, answered
Where can I find a free QSO 530 Module 2 Descriptive Statistics Assignment sample?
The complete QSO 530 Module 2 assignment is on this page: describing 12 weeks of baskets at an invented grocery cooperative.
When should the median be used instead of the mean?
When data are skewed or contain extreme values, since the median reflects the typical case while the mean is pulled toward the tail.
What does a box plot show?
The median, the quartiles that bound the middle half of the data and points that lie far outside that range, making skew and outliers visible.
How should outliers be handled?
Investigated first: they may be errors to correct, special cases to report separately or genuine values that belong in the analysis.
What is a right-skewed distribution?
One with a long tail of high values, such as grocery baskets, where most values are moderate and a few are very large, pulling the mean above the median.