Module Seven Discussion
Two Tickets and a Nephew's Bid
Last week a member of Halloran Science Center's board, who also sits on the finance committee that approves our contracts, stopped me after a meeting. A nephew owns an audiovisual firm that plans to bid on our $310,000 sound package for the new dome, and the board member asked me to "make sure he gets a fair look." In the same conversation, I was offered two tickets to a college football game in Lincoln, "no strings attached." Nothing was asked that is obviously improper. Both pieces still needed a response.
I see two separate problems. The first is a conflict of interest: a person with authority over contract approvals has a family stake in a bidder. The second is a gift from someone connected to a bidder during a procurement. PMI's ethics code groups its expectations under four headings, and three of them bear directly on this one. Fairness requires disclosing conflicts and making decisions impartially; honesty requires being open about what happened; responsibility includes reporting. Ethics has been described as running through ordinary project decisions rather than waiting for a rare crisis (Helgadóttir, 2008), and this is a good example: an ordinary chat after a meeting carried two ethical questions. Interviews with practitioners in several countries have tied governance, trust and ethics in temporary organizations tightly together (Müller et al., 2013); a procurement seen as rigged would damage trust in our project with donors and the county, whatever the outcome.
I declined the tickets that afternoon, saying our procurement policy does not allow gifts during an open bid and thanking the board member for the thought. I then wrote a short note to our executive director, the project's sponsor, describing the conversation. The sponsor asked the board member to recuse from the finance committee's vote on the sound package, which happened without drama. The nephew's firm can still bid. All bids will be scored on the criteria published in the request for proposals by a three-person panel that does not include me alone, and the scoring sheets will be kept with the contract file. Loo (2002) describes using short vignettes to help project managers rehearse dilemmas like this before they happen; I wish I had done that, because my first instinct was to say nothing and avoid an awkward moment.
How small does a gift have to be before your organization stops caring, and does that change while a bid is open?
References
Helgadóttir, H. (2008). The ethical dimension of project management. International Journal of Project Management, 26(7), 743-748. https://doi.org/10.1016/j.ijproman.2007.11.002
Loo, R. (2002). Tackling ethical dilemmas in project management using vignettes. International Journal of Project Management, 20(7), 489-495. https://doi.org/10.1016/S0263-7863(01)00056-4
Müller, R., Andersen, E. S., Kvalnes, Ø., Shao, J., Sankaran, S., Turner, J. R., Biesenthal, C., Walker, D., & Gudergan, S. (2013). The interrelationship of governance, trust, and ethics in temporary organizations. Project Management Journal, 44(4), 26-44. https://doi.org/10.1002/pmj.21350
What the QSO 645 Module 7 instructions ask for
The seventh QSO 645 discussion usually asks students to examine professional and social responsibility, often through an ethical dilemma, and to reason from PMI's published ethics code. Expect to identify the ethical issues in a situation, tie each to the value in that code it touches, and describe what a project manager should do. Strong posts separate distinct issues that arrive together, such as a conflict of interest and a gift, explain the difference between what the code requires and what it merely encourages, propose specific actions in a sensible order, beginning with disclosure, and consider how to act ethically without damaging working relationships unnecessarily. They avoid both moralizing and treating the matter as a formality. Replies should test a classmate's resolution against the code's exact expectations.
How this QSO 645 Module 7 discussion example is built
The post describes an ethical problem at Halloran Science Center, a fictional Omaha museum renewing its planetarium for $4.8 million. A board member on the finance committee says a nephew's audiovisual firm will bid on the $310,000 sound package, asks the project manager to give it a fair look and offers two football tickets. The writer separates a conflict of interest that must be disclosed from a gift that must be declined, checks each against PMI's ethics code and reports the actions: declining the tickets, informing the sponsor in writing, asking the board member to recuse from the vote, scoring all bids on published criteria with a panel and letting the firm compete equally. Helgadóttir, Müller and colleagues and Loo are cited.
Where the QSO 645 Module 7 rubric puts the points
Credit in the seventh QSO 645 thread typically goes to correctly identified ethical issues, accurate application of the code's values and standards, specific actions in a defensible order, disclosure handled openly, fairness to all bidders including the one connected to the conflict, attention to relationships and a short treatment of research on ethics in projects. Posts score well when they show the reasoning a PMP candidate would need on a situational question. They lose marks for vague appeals to integrity, for hiding the conflict to keep the peace, for excluding the connected firm without cause or for ignoring the gift. Replies that compare a classmate's actions with the code's actual wording earn the most. APA citations finish the grade.
QSO 645 Module 7 help: the mistakes that cost points
Start by naming each ethical issue separately; real situations often bundle two or three. For each, find the relevant value in the code: honesty for disclosure, fairness for conflicts and impartial decisions, responsibility for reporting, respect for how you treat the people involved. Then list your actions in order. Disclosure usually comes first, to the person with authority over the decision. Remember that fairness cuts both ways: the connected party should neither get an advantage nor be shut out. Say how you will keep the relationship workable. Exam questions on ethics often ask what to do first, so practice ordering actions. Posts often stop at "follow the code"; the useful part is what you actually do on Monday morning.
Get QSO 645 Module 7 written to your instructions
Paste the QSO 645 Module 7 prompt and describe the ethical situation you want to discuss. A writer separates the issues, applies the values of the PMI code with specific actions, explains disclosure, fairness and how to protect relationships while doing the right thing, and supports the reasoning with ethics research, then asks the class a question worth debating. We draft the first QSO 645 post free, in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 645 papers and related MS Project Management samples
- QSO 645 Module 1 Discussion: Five Process Groups in One Dome
- QSO 645 Module 2 Business Case Assignment: Repair, Replace or Go Fully Digital
- QSO 645 Module 3 Requirements Assignment: What Teachers and Visitors Asked For
- QSO 645 Module 4 Discussion: A Hybrid Approach for Show Production
- QSO 645 Module 5 Procurement Assignment: Four Packages, Four Contract Types
- QSO 645 Module 6 Quality Assignment: Acceptance Tests for an Image
- QSO 645 Module 8 Communications Assignment: Schools, Donors and Members
- QSO 645 Module 9 Final Project: The Plan by Process Group
- QSO 645 Module 10 Discussion: Ready for Situational Questions
- OL 645 Module 4 Discussion: Workplace Surveillance and Privacy
- MKT 675 Module 5 Comparative Advertising Assignment: Comparative Ads and the Lanham Act
- QSO 500 Module 10 Discussion: The Ethics of Studying Customers' Finances
- QSO 640 Module 7 Discussion: Fixtures That Failed After Installation
QSO 645 Module 7 questions, answered
Where can I find a free QSO 645 Module 7 Discussion sample?
This page holds the full QSO 645 Module 7 post on a board member's relative bidding for a contract and the ethics behind the response.
Which values does PMI's ethics code rest on?
Four: responsibility, respect, fairness and honesty, and under each the code separates required conduct from conduct it only encourages.
What should a project manager do about a conflict of interest?
Disclose it promptly to the appropriate stakeholders, step back from or ask others to step back from the decision and follow a fair, documented process.
Can a project manager accept gifts from vendors or stakeholders?
Gifts that could influence or appear to influence a decision should be declined, and organizational policy and law always apply.
Should a firm connected to a conflict be excluded from bidding?
Not automatically; fairness usually means letting it compete on the same terms while removing the conflicted person from the decision.