QSO 645 Module 9 Final Project Example

Reviewed by Portia Lambrick, MBA

This QSO 645 Module 9 Final Project sample presents a project management plan organized by the five process groups, showing for each key process the inputs used, the tools applied and the outputs produced, and works one real change through integrated change control. SNHU QSO 645 (QSO-645) makes this plan the capstone of its MS Project Management PMP preparation sequence. The project is the dome renewal at Halloran Science Center, an invented Omaha museum replacing its planetarium during a seven-month closure. Organizing the plan by process group shows how the framework the exam tests becomes a working document, from the business case to the day the presenters take over the new dome.

CourseQSO 645 Project Management for PMP® Certification
ModuleModule 9
Paper typegraduate final project presenting a project management plan organized by the five process groups, showing for each key process the inputs used, the tools applied and the outputs produced, and demonstrating integrated change control on a real change
LengthAbout 1,300 words, 7 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Project Management
UpdatedOctober 2026

Free sample paper for QSO 645 Module 9

1

Project Management Plan by Process Group: Halloran Science Center Dome Renewal

[Student Name]

Southern New Hampshire University

QSO 645: Project Management for PMP Certification

Final Project

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingHalloran Science Center, its project, people and every figure in this QSO 645 final project are invented.
2

Project Management Plan by Process Group: Halloran Science Center Dome Renewal

Introduction

Halloran Science Center will replace its 1987 star projector, dome surface and seats, add accessible seating and produce new shows, for $4.8 million, during a seven-month closure ending with a September 8 reopening for school field trips. This plan is organized by the five process groups. Within each group, a table shows the key processes, the main inputs used, the tools and techniques applied and the outputs produced at Halloran, followed by a short explanation. The final sections work one change through integrated change control and describe closing.

What this page is doingStates the plan's purpose and structure.
3

Initiating

Initiating processes at Halloran

ProcessMain inputsTools and techniquesOutputs at Halloran
Develop project charterBusiness case; benefits management plan; donor and grant agreementsExpert judgment from planetarium consultant; meetings with the boardCharter signed December 12 naming the executive director as sponsor
Identify stakeholdersCharter; donor list; school booking recordsStakeholder analysis; engagement assessmentStakeholder register with ten groups

The business case compared refurbishment, a hybrid optical and digital system and a fully digital system and recommended the hybrid, whose discounted income outruns the slice of savings Halloran itself puts in roughly fourfold. Badewi (2016) found that organizations combining sound project management with deliberate benefits management practices, such as naming benefit owners, reported more successful investments than those relying on project management alone, so the benefits register, with owners outside the project, was approved alongside the charter.

What this page is doingAuthorizes the project and identifies stakeholders.
4

Planning

Key planning processes at Halloran

ProcessMain inputsTools and techniquesOutputs at Halloran
Collect requirements and define scopeCharter; stakeholder registerFocus groups, survey, interviews, observation, document analysisRequirements traceability matrix, now 39 requirements; scope statement
Create WBSScope statementDecompositionWBS with seven deliverables and 52 work packages
Develop scheduleWBS; activity durations; vendor lead timesCritical path method; schedule compression30-week installation schedule with July 15 finish and reopening buffer
Determine budgetCost estimates; contracts; risk registerCost aggregation; reserve analysisCost baseline $4.42 million plus $380,000 contingency
Plan quality managementRequirements; vendor specificationsCost of quality; test planningQuality plan with metrics, factory and site acceptance tests
Plan communications and engagementStakeholder register; engagement assessmentCommunication requirements analysisCommunication plan and engagement matrix
Plan risk management and responsesScope, schedule and cost baselinesRisk workshop; probability and impact analysisRisk register with owners and responses
Plan procurementScope baseline; make-or-buy analysisContract type selection; source selection criteriaFour procurement packages, each with its contract type

The installation follows a predictive plan because contracts, inspections and the reopening date leave no room for discovery, while show production runs in two-week sprints with the education director as product owner. Boehm and Turner (2003) recommend letting a project's risks decide where plan-driven discipline and where agile flexibility belong, rather than choosing one for the whole effort; at Halloran, the frozen technical specification at week 6 is the agreed boundary between the two.

The schedule finishes installation by July 15, leaving seven weeks for testing, presenter training and rehearsals before September 8. The cost baseline is built from the four contracts and internal costs, with contingency sized from the risk register: dome panel delays, hidden conditions in the 1987 floor, integration problems between the optical and video systems and a shortfall in late donor pledges.

What this page is doingBuilds the baselines and subsidiary plans.
5

Executing

Key executing processes at Halloran

ProcessMain inputsTools and techniquesOutputs at Halloran
Direct and manage project workProject management plan; approved changesWeekly coordination meetings; work authorizationInstalled dome, seats, projection and sound; work performance data
Manage qualityQuality plan; test resultsProcess audits by consultantAudit reports; process improvements
Acquire and develop teamResource planTraining; co-location in site officePresenters trained on portable system; integrated contractor team
Conduct procurementsProcurement documents; proposalsWeighted scoring by panel; negotiationFour signed contracts
Manage communications and engagementCommunication plan; engagement matrixCalls, meetings, tours, newslettersSchool bookings retained; members renewed
Implement risk responsesRisk registerAgreed responsesEarly dome panel order; floor survey before demolition

Turner and Simister (2001) relate the choice of contract to how much is known about both the product and the way it will be produced. The four packages reflect that: a firm fixed price for the fully drawn dome surface, a fixed price with unit-price allowances for seating in a building whose floor conditions were unknown, a fixed-price-incentive-fee contract for the projection system whose integration effort was uncertain and capped time and materials for show co-production. The procurement for the sound package was also where professional responsibility was tested: a board member's family connection to one bidder was disclosed to the sponsor, the board member recused and all bids were scored on published criteria.

What this page is doingCarries out the plan.
6

Monitoring and Controlling

Key monitoring and controlling processes at Halloran

ProcessMain inputsTools and techniquesOutputs at Halloran
Monitor and control project workWork performance data; baselinesEarned value; buffer trackingMonthly status reports to sponsor and board
Perform integrated change controlChange requests; planImpact analysis; change control boardApproved or rejected changes; updated baselines; change log
Validate scopeVerified deliverables; requirements matrixInspection; acceptance by sponsorAccepted deliverables
Control qualityQuality metrics; deliverablesMeasurements; viewing panel; test scriptsTest results; nonconformance reports
Monitor risksRisk register; performance reportsReviews at each status meetingUpdated register; triggered responses
Monitor stakeholder engagementEngagement matrix; booking and renewal dataEngagement measuresRevised strategies

Status is reported monthly using earned value for the installation and buffer consumption for the schedule; sprint progress for the show is reported through the backlog and the product owner's acceptance of scenes.

What this page is doingKeeps the project on its baselines.
7

A Change Through Integrated Change Control

In April, the dome fabricator reported that a shortage of perforated aluminum sheet would delay delivery of the dome panels by three weeks, pushing dome installation, projector alignment and testing into August and leaving too little time before September 8. The project manager logged a change request and analyzed three options with the integrator and the general contractor.

Options for the dome panel delay

OptionEffect on scheduleCostRisk
A: Accept the delayTesting ends September 1; training cut to one weeknoneHigh: little time to fix defects before reopening
B: Overtime and resequencing: install seats and sound before the dome, run dome crews six days a weekRecovers about two and a half weeks; testing ends July 30$38,000Moderate: crews working longer hours
C: Source sheet from a second mill at a premiumRecovers two weeks$64,000Moderate: new supplier's material untested

The project manager recommended Option B, which used part of the contingency reserve and stayed within the sponsor's approval authority, yet resequencing the baseline put it before the change control board anyway, where the sponsor, the planetarium manager and the board treasurer looked it over. It was approved on April 22. The schedule baseline, the cost forecast, the risk register and the communication plan were updated, and teachers and donors were told nothing had changed for them.

What this page is doingApplies the process to a real event.
8

Closing

Closing processes at Halloran

ProcessMain inputsTools and techniquesOutputs at Halloran
Close projectAccepted deliverables; contracts; lessons logFinal review meeting; document archivingFinal report to board and county; transition to planetarium manager; lessons learned
Close procurementsContracts; acceptance resultsProcurement auditFinal payments; warranties; vendor evaluations

Closing includes the transfer of the benefits register to its owners, whose yearly figures on visits, school groups, member households, rentals and teacher scores go to the treasurer's committee until the third anniversary of reopening.

What this page is doingEnds the project properly.
9

Conclusion

Organized by process group, Halloran's plan shows the PMP framework at work on one project: a charter and stakeholder register from initiating, baselines and subsidiary plans from planning, a mix of fixed-plan installation and sprint-based show production in executing, monitoring that caught a supplier delay early enough to choose among options, and closing that hands both the planetarium and its benefits to the people who will keep them. The value of the framework lies less in its names than in the decisions it forces at the right time.

What this page is doingSummarizes the plan.
10

References

Badewi, A. (2016). The impact of project management (PM) and benefits management (BM) practices on project success: Towards developing a project benefits governance framework. International Journal of Project Management, 34(4), 761-778. https://doi.org/10.1016/j.ijproman.2015.05.005

Boehm, B., & Turner, R. (2003). Using risk to balance agile and plan-driven methods. Computer, 36(6), 57-66. https://doi.org/10.1109/MC.2003.1204376

Turner, J. R., & Simister, S. J. (2001). Project contract management and a theory of organization. International Journal of Project Management, 19(8), 457-464. https://doi.org/10.1016/S0263-7863(01)00051-5

What the QSO 645 Module 9 instructions ask for

The QSO 645 final project typically asks students to build a comprehensive project management plan that applies the process groups and knowledge areas to a project, demonstrating the inputs, tools and techniques and outputs of key processes. Expect to cover initiating, planning, executing, monitoring and controlling and closing, with the subsidiary plans and baselines planning produces and the way they are used afterward. Strong projects show that the student can do more than name processes: each key process is tied to a real document or decision, the baselines agree with each other, the approach suits the work, and at least one change or problem is traced through monitoring and control to a documented decision. Instructors also look for professional responsibility woven into the plan rather than appended.

How this QSO 645 Module 9 final project example is built

The project presents the plan for the dome renewal at Halloran Science Center, a fictional Omaha museum's $4.8 million planetarium project, organized by process group. Initiating covers the business case, charter and stakeholder register. Planning covers the requirements matrix, a 30-week installation schedule fixed to a September 8 reopening, a $4.42 million cost baseline with $380,000 of contingency and the subsidiary plans, including a hybrid approach for show production. Executing, monitoring and controlling and closing follow, each with a table of processes, inputs, tools and outputs. A three-week dome panel delay is worked through change control to an approved $38,000 overtime plan. Boehm and Turner, Badewi and Turner and Simister are cited.

Where the QSO 645 Module 9 rubric puts the points

Marks on the QSO 645 final project usually go to complete coverage of the process groups, accurate use of inputs, tools and techniques and outputs tied to real project documents, consistent baselines, subsidiary plans that fit the project, a sensible choice of approach, a change carried through integrated change control with options and a documented decision, attention to ethics and stakeholder engagement and research used to justify choices. Plans score well when a reader can see the framework working on one project. They lose points for listing processes without application, for baselines that disagree, for a change process that is described but never used or for treating closing as an afterthought. Tables, APA references and professional writing complete the grade.

QSO 645 Module 9 help: the mistakes that cost points

Organize your plan by the five process groups, and in each group pick the processes that matter most for your project. For each, name the main inputs you actually used, the tools or techniques you applied and the outputs you produced, using your own documents rather than generic terms. Make sure the scope, schedule and cost baselines agree. Show where you used a predictive approach and where an adaptive one. Then take one real change, describe the request, analyze its effect on scope, time, cost, quality and risk, give the options and record the decision and the updates it caused. Finish with closing. Final projects often list all forty-nine processes from memory; it is better to apply twenty well than to name every one.

Get QSO 645 Module 9 written to your instructions

Send the QSO 645 capstone brief, any instructor comments so far and the project you are planning. A writer organizes the plan by process group, shows the inputs, tools and outputs behind each key process, keeps scope, schedule, cost, quality, risk, procurement and communication consistent, works a change through integrated change control and supports the reasoning with project research. We write your first QSO 645 project free, in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 645 papers and related MS Project Management samples

QSO 645 Module 9 questions, answered

Where can I find a free QSO 645 Module 9 Final Project sample?

The full QSO 645 Module 9 final project is on this page: an invented museum's planetarium plan organized by process group, with a change request.

What are inputs, tools and techniques and outputs?

The way the PMP framework describes a process: the documents and information it uses, the methods applied and the documents or results it produces.

What is integrated change control?

The process of reviewing every change request, analyzing its effects across the project, approving or rejecting it and updating plans and baselines.

Why organize a project plan by process group?

It shows how the project moves from authorization through planning, execution and control to closing, mirroring the PMP framework.

Who approves changes in integrated change control?

A change control board or the sponsor, within authority levels set in the plan, with the project manager analyzing and recommending.