QSO 700 Module 6 Solution Design Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 700 Module 6 Solution Design Assignment sample generates and compares solution alternatives against weighted criteria, validates the preferred design with historical data and fairness testing and selects a solution. SNHU QSO 700 (QSO-700) asks MS Project Management capstone students to move from diagnosis to design in Module 6. The organization is Harbor Pines Credit Union, an invented Michigan credit union whose dealer car loan applications spend hours waiting for a decision. Three alternatives are compared, and the winner is tested on two years of loans and on fairness before it is recommended to the sponsor, along with the changes that let dealers get paid the day a clean contract arrives.

CourseQSO 700 Project Management and Operations Capstone
ModuleModule 6
Paper typegraduate assignment generating and comparing solution alternatives against weighted criteria, validating the preferred design with historical data and fairness testing, and selecting a solution
LengthAbout 1,120 words, 7 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Project Management
UpdatedOctober 2026

Free sample paper for QSO 700 Module 6

1

Three Ways to a Faster Yes: Comparing and Testing Solutions for Harbor Pines' Dealer Loans

[Student Name]

Southern New Hampshire University

QSO 700: Project Management and Operations Capstone

Solution Design Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingHarbor Pines Credit Union, its alternatives, costs and test results in this QSO 700 assignment are invented.
2

Three Ways to a Faster Yes: Comparing and Testing Solutions for Harbor Pines' Dealer Loans

Introduction

The current-state analysis found that Harbor Pines Credit Union's dealer applications are worked on for about 31 minutes but wait hours, because of no after-hours coverage, narrow automated rules, underwriter time diluted by other duties, incomplete applications and a single queue without triage. This paper develops three alternatives that address those causes in different ways, compares them against weighted criteria agreed with the sponsor, tests the preferred design against two years of loan results and for fairness, and recommends a solution for implementation planning.

What this page is doingStates the design task.
3

Three Alternatives

Alternative A adds capacity. Harbor Pines would hire four underwriters to cover weekday evenings from 5 to 9 p.m. and every Saturday, at about $290,000 a year in salary and benefits, with no change to automated rules or the queue.

Alternative B redesigns the process. Automated rules would be expanded, after validation, to approve or decline about 55 percent of applications instantly. The remaining applications would be sorted by the decision engine into a simple queue, for complete applications with moderate risk, and a complex queue, for thin credit files, recent bankruptcies, self-employment income and loans above the vehicle's value. Two underwriters would move to a noon-to-9 p.m. shift and all underwriters would share a Saturday rotation. A dealer support specialist would take dealer calls about past applications off underwriters. The dealer portal would require employment and income fields before submission. Costs are about $180,000 once for decision engine configuration and about $62,000 a year for the new specialist.

Alternative C outsources. A credit union service organization would underwrite applications received after 5 p.m. and on weekends using Harbor Pines' credit policy, at about $11 per application, roughly $160,000 a year at current volume, with no change to daytime operations.

What this page is doingDescribes each option.
4

Criteria and Scoring

The vice president of lending signed off on six criteria and their weights, which carry the proposal's guard rails forward.

Weighted comparison (scores 1 to 5)

CriterionWeightA: Add underwritersB: RedesignC: Outsource after hours
Decisions within 15 minutes30%253
Annual cost15%243
Loan quality15%443
Fairness and compliance15%443
Dealer and member experience15%353
Effects on staff10%442
Weighted score100%2.954.452.90

Alternative A improves after-hours coverage but leaves daytime waiting largely unchanged, since the queue and diluted capacity remain; modeling the arrival pattern, it would bring only about 35 percent of decisions within 15 minutes. Alternative C covers after-hours applications but by underwriters who do not know Harbor Pines' dealers, and the two underwriters interviewed about it worried that it signaled a move to outsource their jobs. Alternative B addresses all five root causes and, in a simulation of last year's arrivals, brings about 72 percent of decisions within 15 minutes.

What this page is doingCompares the alternatives.
5

Validating the Automated Rules

The expanded rules were developed with the two underwriters who volunteered after the Module 4 discussion and the credit union's risk analyst. They were applied to all applications from the last 24 months for which loan results are known. Kleinberg et al. (2018), studying judges' bail decisions, found that a machine prediction of risk could have improved outcomes compared with human decisions, while warning that such comparisons must account for cases where the human decision prevented the outcome from being observed. Harbor Pines faces the same problem: declined applications have no loan results. The back-test therefore focused on applications the rules would approve that underwriters also approved, about 41 percent of funded loans, whose 60-day delinquency was about 0.41 percent, against 0.62 percent for the portfolio. For applications the rules would approve but underwriters declined, a small group, outcomes are unknown, and those rules were narrowed until that group fell below 2 percent of approvals.

What this page is doingBack-tests on loan results.
6

Testing for Fairness

Fuster et al. (2022) found in mortgage data that more flexible statistical models predicted default better but that the gains were spread unevenly, and Black and Hispanic borrowers gained least from the sharper predictions. Before recommending the rules, the compliance officer tested approval rates and recommended pricing tiers across groups using the proxy method for race and ethnicity used by federal regulators when such data are not collected for non-mortgage loans, and compared outcomes by sex and age. No disparity exceeded Harbor Pines' fair lending policy limits, and the expanded rules slightly narrowed the approval gap for the proxy groups compared with the current manual process. The test will be repeated quarterly after launch.

What this page is doingChecks for unequal outcomes.
7

The Selected Solution

Alternative B is selected. Successful redesigns tend to combine several heuristics rather than apply one at a time (Reijers & Limam Mansar, 2005), and this design combines automation of routine decisions, triage into separate paths, resource changes matched to arrivals, removal of interruptions and complete inputs at the start. Specifically: the validated rules go live in the decision engine; simple and complex queues are created, with simple applications assigned to underwriters on the noon-to-9 p.m. shift in the evening; complex applications go to the most experienced underwriters during the day; the dealer support specialist answers all dealer status calls; and the portal requires income and employment data. Funding is addressed by a stipulation checklist shown to dealers at approval and electronic document upload.

What this page is doingSpecifies the design.
8

Funding Redesign

The decision redesign alone would leave dealers waiting days to be paid. Three funding changes accompany it. At approval, the portal shows the dealer a checklist of the exact documents required for that loan, based on its risk tier, so that income proof is requested only when the rules require it. Dealers upload documents electronically instead of sending paper by courier, and the funding specialist sees an alert when a file is complete. Contracts that arrive complete before 2 p.m. are funded the same day. In a sample of 200 recent contracts, about three-quarters of the missing documents were ones the dealer had but did not know were needed, which the checklist should prevent.

What this page is doingAddresses the second delay.
9

Risks of the Design

Automated rules could drift as economic conditions change, so their performance will be reviewed monthly. Underwriters on the evening shift will need training on the simple queue and support when complex cases arrive at night. Dealers may game required fields, so income claims above certain thresholds still trigger verification.

What this page is doingNames what could go wrong.
10

Conclusion

Three alternatives were compared on speed, cost, quality, fairness, experience and staff effects. Adding underwriters fixes evenings but not days; outsourcing fixes evenings at a cost to relationships and morale. The combined redesign addresses every root cause, is expected to bring about 72 percent of decisions within 15 minutes, approved loans with lower delinquency in back-testing and passed fairness testing. It moves to implementation planning in the next milestone.

What this page is doingRecommends the redesign.
11

References

Fuster, A., Goldsmith-Pinkham, P., Ramadorai, T., & Walther, A. (2022). Predictably unequal? The effects of machine learning on credit markets. The Journal of Finance, 77(1), 5-47. https://doi.org/10.1111/jofi.13090

Kleinberg, J., Lakkaraju, H., Leskovec, J., Ludwig, J., & Mullainathan, S. (2018). Human decisions and machine predictions. The Quarterly Journal of Economics, 133(1), 237-293. https://doi.org/10.1093/qje/qjx032

Reijers, H. A., & Limam Mansar, S. (2005). Best practices in business process redesign: An overview and qualitative evaluation of successful redesign heuristics. Omega, 33(4), 283-306. https://doi.org/10.1016/j.omega.2004.04.012

What the QSO 700 Module 6 instructions ask for

The QSO 700 Module 6 assignment typically asks students to develop and evaluate solutions to the capstone problem and recommend one. Expect to propose several alternatives, define criteria for comparing them, analyze each against the criteria and justify a choice. Strong papers trace each alternative back to the root causes in the current-state analysis, include options of different cost and ambition, weight criteria to reflect the sponsor's priorities and the proposal's guard-rail objectives, test the preferred solution with evidence rather than assertion, for example by back-testing on historical data, and examine side effects such as fairness, quality or staff impact. The chosen solution should be specific enough to plan in the next milestone.

How this QSO 700 Module 6 solution design assignment example is built

The assignment compares three solutions at Harbor Pines Credit Union, a fictional Michigan credit union: hiring four evening and Saturday underwriters for about $290,000 a year; a combined redesign that expands validated automated rules to about 55 percent of applications, triages the rest, moves two underwriters to noon-to-9 p.m. with a Saturday rotation, adds a dealer support specialist and requires income fields in the portal; and outsourcing after-hours underwriting at $11 an application. Scored on speed, cost, loan quality, fairness, dealer and member experience and staff effects, the redesign wins; back-testing shows about 0.41 percent delinquency on loans its rules would approve, and a proxy-based fairness test finds no disparities beyond policy. Kleinberg and colleagues, Fuster and colleagues and Reijers and Limam Mansar are cited.

Where the QSO 700 Module 6 rubric puts the points

Grading in the QSO 700 solution design assignment generally rewards alternatives tied to root causes, a range of options, criteria and weights reflecting the sponsor's priorities and guard rails, a fair comparison, evidence-based validation of the preferred option, examination of side effects such as fairness and staff impact, a clear selection and research that informs both the design and its risks. Papers stand out when the preferred solution is tested hard before it is recommended. They lose credit for a single solution compared against straw men, for criteria that ignore the proposal's objectives, for automation recommended without validation or fairness testing or for solutions too vague to plan. A comparison table that adds up and APA entries that match the citations round out the score.

QSO 700 Module 6 help: the mistakes that cost points

Start from the root causes you found and design two or three alternatives that address them in different ways, including a simple one and an ambitious one. Agree on criteria with your sponsor, including the guard rails in your proposal, and weight them. Score each alternative with evidence where you have it. Then test the winner: run its rules or assumptions against historical data, check for unequal effects on groups of customers or employees and look for other side effects. Make the chosen solution concrete: who does what, with which tools, when. Papers often pick the solution first and build the comparison around it; a strong paper lets the test results decide.

Get QSO 700 Module 6 written to your instructions

Send the QSO 700 Module 6 brief along with what your diagnosis found. A writer generates realistic alternatives, sets weighted criteria with the sponsor's priorities, scores and compares them, validates the preferred design against historical data, tests it for fairness or other side effects and supports the selection with research. No fee applies to the first QSO 700 design paper, usually back within a couple of days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 700 papers and related MS Project Management samples

QSO 700 Module 6 questions, answered

Where can I find a free QSO 700 Module 6 solution design sample?

This page carries the full QSO 700 Module 6 assignment: three solutions for an invented credit union's slow dealer loan decisions.

How many alternatives should a capstone solution design compare?

Usually two to four realistic alternatives, including at least one simpler and one more ambitious option, each tied to root causes.

What is back-testing a decision rule?

Applying a proposed rule to past cases with known outcomes to estimate how it would have performed.

How can automated lending rules be tested for fairness?

By comparing approval and pricing outcomes across protected groups, often using proxy methods, before and after a rule change.

Why include staff effects in solution criteria?

Because solutions that ignore effects on employees often fail in implementation and can harm morale and quality.