SPT 608 Module 3 Branding Assignment Example

Reviewed by Portia Lambrick, MBA

This SPT 608 Module 3 Branding Assignment sample develops a sport team brand, auditing brand awareness and associations, defining brand identity and positioning and planning how the brand is expressed and measured. SNHU SPT 608 (SPT-608) asks MS Sport Management students to build brands with real meaning rather than slogans. The team is the Kaw Valley Dredgers, an invented independent baseball club in Topeka named for the sand dredges that once worked the Kansas River. Most of the town has never connected the club's name to that history, and the brand plan starts by closing that gap. Touchpoints and measures follow.

CourseSPT 608 Sport Marketing and Media
ModuleModule 3
Paper typegraduate assignment developing a sport team brand, auditing brand awareness and associations, defining brand identity and positioning and planning how the brand is expressed and measured
LengthAbout 1,030 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Sport Management
UpdatedOctober 2026

Free sample paper for SPT 608 Module 3

1

A Brand from a River Town's Past: Building the Kaw Valley Dredgers Brand

[Student Name]

Southern New Hampshire University

SPT 608: Sport Marketing and Media

Branding Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe Kaw Valley Dredgers and all brand research results are invented for this SPT 608 assignment.
2

A Brand from a River Town's Past: Building the Kaw Valley Dredgers Brand

Introduction

The Kaw Valley Dredgers are named for the sand dredges that have worked the Kansas River at Topeka for generations, pulling sand from the riverbed for the city's roads and buildings. Almost no one knows it. After two seasons, the brand is known mainly for cheap tickets and fireworks, and many residents think the logo belongs to a construction company. This paper audits the brand, defines a new identity and positioning, plans brand elements and touchpoints and sets brand measures.

What this page is doingStates the branding problem.
3

Brand Audit

Keller (1993) proposed that a brand is worth what it changes about how people react to a firm's marketing, and that change comes from what they know about the brand. For a ballclub, that knowledge means two things: whether Topeka residents can name the team unprompted, and which images come to mind when they do. Ross (2006) adapted this thinking for spectator sport, describing spectator-based brand equity as built from team brand awareness and associations formed through the team, its marketing and fans' experiences.

Brand audit findings

MeasureFindingSource
Unaided awareness, Topeka adults31% named the Dredgers when asked about local sports teamsIntercept survey, 260 residents
Aided awareness72% recognized the nameIntercept survey
Top associations among fansCheap tickets, fireworks, beer, "something to do"Fan survey, 1,140 fans
Knowledge of name's meaning9% of fans knew what a dredger wasFan survey
Logo recognition23% of non-attenders thought the logo was a construction company'sIntercept survey
Fans describing the team as "Topeka's team"34%Fan survey

The audit shows awareness without meaning, and it explains a pattern in the fan research: families and social groups treat the club as one evening option among many because the brand has given them no other reason to think of it. People know the Dredgers exist, but the associations they hold are about price and promotions, which any entertainment option could match. Gladden and Funk (2002) found that the strongest team brands hold associations that go beyond the game itself, such as tradition, nostalgia, pride in place and the venue. The Dredgers have a venue fans like and a name with real history, but the brand uses neither.

What this page is doingAssesses the current brand.
4

Brand Identity

The identity draws on three true things about the club. First, the river and the city's working past: the Dredgers' name, ballpark site and the river trades that built Topeka. Older residents remember the dredges working the river and the trucks hauling sand into town, memories the club can collect and share through an oral history project with the county historical society. Second, summer evenings: the experience fans value most. Third, belonging: a club owned locally, staffed by Topekans and part of the city's riverfront revival.

Brand identity

ElementStatement
Core ideaTopeka's summer, by the river
PersonalityHardworking, friendly, a little nostalgic, proud of Topeka
PromiseAn easy, joyful summer evening that belongs to the town
Proof pointsRiverfront ballpark, local ownership, players in the community, heritage nights
What this page is doingDefines what the brand stands for.
5

Positioning

The positioning line, "Topeka's summer, by the river," was tested with four groups of fans and two groups of non-attenders before being chosen over two alternatives, "Baseball the way Topeka plays it" and "Your night out on the Kaw." Fans found the first too focused on the game and the second unclear to anyone who did not know the river's local name. The chosen line separates the Dredgers from other evening options, movies, bars, youth sports, by claiming a place and a season no one else can. It speaks to families and social groups, who come for the evening, and to civic boosters, who care about Topeka. It does not mention winning, which the club cannot promise. It also gives staff a test for decisions: a promotion, a jersey or a social post either fits Topeka's summer by the river or it does not. Fireworks still fit; a generic theme night borrowed from another team's calendar may not.

What this page is doingSets the brand's place.
6

Brand Elements

The logo will be updated rather than replaced, because two seasons of awareness are worth keeping, keeping the name and colors but adding a dredge bucket and a river line so that it reads as baseball and as river, not construction. A mascot, a friendly river catfish called Sandy, will give children a character to meet and photograph; families in the fan research named a mascot as the single change most likely to bring them back, and the current club has none. A heritage jersey night series, four games a season, will feature uniforms based on historic Topeka teams and river trades, with game-worn jerseys auctioned for a local river conservation group. And the ballpark concourse will tell the story: photographs of the old dredges, a short display on the river trades and a "Sand Pile" kids' play area built from river sand.

What this page is doingPlans how the brand looks and sounds.
7

Touchpoints

Brand touchpoints

TouchpointCurrent stateBrand change
Ticketing websiteGeneric ticketing templateRiver imagery, positioning line, schedule first
Social mediaPromotions and scoresStories about the river, players and Topeka
Gate and concoursePlain signageHeritage photos, river display, welcome from staff
Public address and video boardGeneric music and promptsLocal voices, Topeka history segments between innings
MerchandiseLogo caps and shirtsHeritage line and river designs
Community eventsOccasional appearancesRiverfront cleanups and summer festival presence
What this page is doingMaps where fans meet the brand.
8

Measures

Brand measures

MeasureBaselineNext season target
Unaided awareness, Topeka adults31%42%
Fans who know the name's meaning9%50%
Fans describing the Dredgers as "Topeka's team"34%45%
Top associations include river, summer or TopekaNot presentIn top three
Heritage merchandise salesNone$60,000
What this page is doingTracks brand equity.
9

Conclusion

The Dredgers have a name with a story and a ballpark by the river, but their brand rests on cheap tickets and fireworks, associations any rival can copy. The audit's most striking number, that fewer than one fan in ten knows what a dredger is, is also the easiest to change. Rebuilding the brand around Topeka's river and working past, summer evenings and belonging gives the club a positioning no one else can claim. An updated logo, a mascot, heritage nights, ballpark storytelling and consistent touchpoints can turn awareness into meaning, measured each season through awareness, associations and attachment.

What this page is doingSummarizes the brand plan.
10

References

Gladden, J. M., & Funk, D. C. (2002). Developing an understanding of brand associations in team sport: Empirical evidence from consumers of professional sport. Journal of Sport Management, 16(1), 54-81. https://doi.org/10.1123/jsm.16.1.54

Keller, K. L. (1993). Conceptualizing, measuring, and managing customer-based brand equity. Journal of Marketing, 57(1), 1-22. https://doi.org/10.1177/002224299305700101

Ross, S. D. (2006). A conceptual framework for understanding spectator-based brand equity. Journal of Sport Management, 20(1), 22-38. https://doi.org/10.1123/jsm.20.1.22

What the SPT 608 Module 3 instructions ask for

The SPT 608 branding assignment typically asks students to analyze and develop the brand of a sport team, event or organization, applying brand equity concepts. Expect to assess the current brand and recommend how to build it. Strong papers audit the brand with evidence, such as awareness and the associations fans hold, define a brand identity and positioning that are distinctive and true to the organization, plan brand elements and the touchpoints where fans meet the brand and set measures to track brand equity over time. They connect the brand to fans' motives and to the community rather than inventing slogans. Recommendations should be specific enough for a designer and a marketing staff to carry out.

How this SPT 608 Module 3 branding assignment example is built

The assignment develops the brand of the Kaw Valley Dredgers, a fictional independent baseball team in Topeka, Kansas. An audit finds 31 percent unaided awareness, associations dominated by cheap tickets and fireworks, a logo mistaken for a construction company and little connection to the river dredges the name honors. Using brand equity ideas, the paper defines an identity around Topeka's river and working heritage, summer evenings and a club belonging to the town, positioned as "Topeka's summer, by the river." It plans an updated logo, mascot, heritage jersey nights and ballpark storytelling, maps touchpoints and sets awareness, association and attachment measures. Keller, Ross and Gladden and Funk are cited.

Where the SPT 608 Module 3 rubric puts the points

The SPT 608 branding rubric generally rewards an evidence-based brand audit, an identity and positioning that are distinctive and authentic, application of brand equity concepts, specific brand elements and touchpoints, connection to fans' motives and community and measures for tracking brand equity. Papers score highest when the brand grows from something real about the organization or place. They lose points for slogans without substance, for redesigns without research, for brands disconnected from fans or for no measures. Visual descriptions, tables and APA references complete the grade, along with a short note on how the brand will be protected in sponsor and media use.

SPT 608 Module 3 help: the mistakes that cost points

Begin by finding out what people think of the brand now: how many know it unprompted and what comes to mind when they hear the name. Compare that with what the organization wants to stand for. Look for something real, in history, place or the fan experience, that could give the brand meaning. Write a short identity and a positioning line that no rival could claim. Then plan the elements, such as logo, colors and mascot, and every place fans meet the brand. Decide how you will measure awareness, associations and attachment next year. Papers often start with a new logo; the stronger ones start with the meaning the logo should carry.

Get SPT 608 Module 3 written to your instructions

Share the SPT 608 Module 3 instructions and the team or event brand you are working on. A writer audits awareness and associations, defines identity and positioning, plans brand elements and touchpoints and sets brand measures, grounded in brand equity research with tables and APA references. We draft your first SPT 608 assignment free, generally inside two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More SPT 608 papers and related MS Sport Management samples

SPT 608 Module 3 questions, answered

Where can I find a free SPT 608 Module 3 branding sample?

The complete SPT 608 Module 3 brand plan for an invented Topeka ballclub is on this page.

What is customer-based brand equity?

The effect that brand knowledge, awareness and associations, has on how consumers respond to a brand's marketing.

What is spectator-based brand equity?

The value of a team's brand to spectators, built from brand awareness and associations formed through the team and its marketing.

What is brand positioning?

The distinctive place a brand aims to hold in consumers' minds compared with alternatives, often stated in a short line.

How can a team measure its brand?

By tracking unaided and aided awareness, the associations fans hold and their attachment through regular surveys.