QSO 630 Module 6 Warehouse Management Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 630 Module 6 Warehouse Management Assignment sample redesigns storage assignment, picking method and packing sequence in a facility and measures the result in order cycle time and in the condition of what arrives. SNHU QSO 630 (QSO-630) covers warehouse management in Module 6 of its MS Operations Management supply chain course. The facility is the fish room of Brackwater Aquatics, an invented Florida wholesaler where fish are netted one order at a time from tanks scattered along dozens of aisles and then wait, already sealed in bags, for a single afternoon pickup. Time studies show where the hours go, and the redesign gives most of them back.

CourseQSO 630 Supply Chain Management
ModuleModule 6
Paper typegraduate assignment redesigning storage assignment, picking method and packing sequence in a facility, measured by order cycle time and its effect on product condition, with the information system that supports it
LengthAbout 1,330 words, 7 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 630 Module 6

1

Four Hours Before the Truck: Redesigning Brackwater's Fish Room and Packing Line

[Student Name]

Southern New Hampshire University

QSO 630: Supply Chain Management

Warehouse Management Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe fish room, time studies and all results for Brackwater Aquatics in this QSO 630 assignment are invented.
2

Four Hours Before the Truck: Redesigning Brackwater's Fish Room and Packing Line

Introduction

The transportation plan in Module 3 shortened the hours Brackwater Aquatics' fish spend in transit, but it left a large block of time untouched: the hours between when a fish is bagged and when its box leaves the building. The inventory work in Module 5 also showed that dry-goods shortages are partly a warehouse problem, since items are sometimes in stock but not where a picker looks. This paper examines both sides of Brackwater's facility, the fish room and the dry-goods warehouse, measures where time and errors arise and recommends changes to storage, picking, packing and the information systems behind them.

What this page is doingStates the warehouse problem.
3

The Facility

The fish room holds about 2,900 tanks on racks along 31 aisles, grouped by supplier rather than species because each farm's delivery goes into the next empty block. Tanks share recirculating filtration by row. Orders print at 7 a.m. and through the morning. A netter takes one order at a time, walks the aisles to catch each species into a holding bucket, and brings the buckets to a single packing bench, where packers count fish into bags, add oxygen, seal the bags and pack them into foam boxes with heat or cold packs. Sealed boxes wait on a staging floor until the parcel pickup at 3 p.m. or a driver's departure at 6 p.m. Next door, the dry-goods warehouse stores 3,600 items in bin shelving and pallet racks arranged alphabetically by supplier.

What this page is doingDescribes layout and flow.
4

Measuring the Current Operation

For two weeks, a supervisor recorded times for a sample of 160 live orders, from order release to box departure. The average order had about 14 species. Netting took about 58 minutes per order, of which roughly two-thirds was walking between aisles. Orders then waited about 25 minutes for a free packer, and packing took about 22 minutes. Finally, sealed boxes waited on the staging floor an average of 2 hours and 40 minutes. Counting from the first fish netted, the average fish spent about four hours in a bucket or bag before leaving the building. The boxes with the longest staging waits had dead-on-arrival rates about 0.7 percentage points higher than the boxes packed last.

A review of manual order-picking research found that walking usually eats the biggest slice of a picker's day, and it sorted the remedies into layout, where items are stored, the route taken, grouping orders and dividing the floor into zones (de Koster et al., 2007). Brackwater's time study fits that pattern, but with a twist: in a fish room, picking time is also product time, because fish are out of their tanks from the moment they are netted.

What this page is doingUses a time study.
5

Order Profile

Last year's orders show that the 60 best-selling species, including neon and cardinal tetras, several livebearers, corydoras and common plecostomus, made up about 58 percent of fish shipped and appeared in about nine of every ten orders. About 170 species appeared in fewer than one order in fifty. On a typical morning, 30 to 40 orders contain neon tetras. This profile matters because when many orders share a few items, catching those items for several orders at once and dividing them at the bench saves walking. Petersen and Aase (2004) ran a simulated picking floor through many mixes of rules and saw grouped orders cut the miles walked more than any other single change, with storage by pick frequency trimming more on top.

What this page is doingShows what orders have in common.
6

Storage Assignment

The recommendation is class-based storage in the fish room. The 60 fastest species move into the 600 tanks in the six aisles nearest the packing bench, with a fixed home block for each species. Farms' deliveries of those species go straight to their home blocks after quarantine. The next 200 species occupy the middle aisles, and the slow movers and quarantine tanks the far end. Grouping by species rather than by farm means the room records each lot's farm and arrival date on the tank label and in the inventory system, so fish can still be shipped oldest first.

What this page is doingMoves fast movers near packing.
7

Picking Method

For the 60 fast species, netting moves from order by order to batches. Each morning at 8 a.m. and 10 a.m., the system totals the fish of each fast species needed across all released orders, and one netter catches each species for the whole batch into a sorting tray, from which packers count fish into each order's bags. Slower species are still netted order by order, but only for the short walk to the middle and far aisles. Based on the time study, batch netting cuts average netting time per order from 58 minutes to about 24.

What this page is doingSwitches to batches.
8

Packing Waves

Packing changes from one continuous flow to three waves timed to the transportation plan. Parcel orders are packed first, from 8 to 12:30, for the 1 p.m. pickup. Airline cargo orders are packed from 12:30 to 3, for a 3:30 departure to the Tampa cargo counter. Truck orders are packed from 3 to 5:30 for a 6 p.m. departure. A second packing bench next to the fast-species aisles handles the morning peak. Under this schedule, the average box leaves about 80 minutes after its last bag is sealed, rather than nearly three hours.

Average minutes per live order, before and after

StepCurrentRedesigned
Netting5824
Waiting for a packer258
Packing2220
Staging until departure16050
Total from first netting to departureabout 265about 102
What this page is doingTimes packing to departures.
9

Dry-Goods Warehouse

Gu et al. (2007) describe warehouse design as a set of linked decisions about receiving, storage, picking and shipping that must be made together, because a good choice in one area can be undone by another. In dry goods, the class A items from Module 5 move to waist-high shelving nearest the packing area, and the alphabetical supplier layout is replaced by locations based on how often items are picked. Handheld scanners will confirm each pick against the order, which addresses a problem the time study also found: about one in five dry-goods shortages reported by stores were items that were in stock but picked from the wrong bin or missed. Scanning also gives accurate on-hand counts, which the reorder points from Module 5 depend on.

What this page is doingApplies the same logic.
10

Information System Support

Brackwater's current order system prints orders but knows nothing about locations. The warehouse management module that comes with its accounting package will be configured to hold a location for every item and every fish lot, generate batch netting lists twice each morning, release orders to packing in waves by transportation mode and record a time stamp when each box is sealed. Printing that time on the box label lets the claims desk compare dead-on-arrival rates with time in the bag and see whether the waves are working.

What this page is doingSpecifies what the software must do.
11

Expected Benefits and Costs

Cutting average time from first netting to departure from about 265 to about 102 minutes is expected to lower the dead-on-arrival rate by about 0.4 percentage points, worth roughly $70,000 a year in credits. Netting labor falls by about 2.3 full-time positions, which will be reassigned to the second packing bench and to the claims desk rather than eliminated. Dry-goods scanning is expected to raise line fill by about one point on its own. One-time costs include about $46,000 for racking changes and the second bench, $28,000 for scanners and $15,000 for system configuration.

What this page is doingSizes the change.
12

Implementation

The fish room will be reorganized one aisle at a time over six weeks, starting with the aisles nearest packing, so that no species is ever without a home tank. Batch netting begins once the first 30 fast species are in their new blocks. The dry-goods move happens over two weekends.

What this page is doingKeeps the room running.
13

Conclusion

Brackwater's fish wait longest not in trucks or planes but in buckets and staged boxes inside their own building. Class-based storage, batch netting for the fastest species, packing waves timed to departures and scanning in dry goods would cut the time from first netting to departure by about 60 percent and reduce both dead fish and short shipments, at modest cost.

What this page is doingSummarizes the redesign.
14

References

de Koster, R., Le-Duc, T., & Roodbergen, K. J. (2007). Design and control of warehouse order picking: A literature review. European Journal of Operational Research, 182(2), 481-501. https://doi.org/10.1016/j.ejor.2006.07.009

Gu, J., Goetschalckx, M., & McGinnis, L. F. (2007). Research on warehouse operation: A comprehensive review. European Journal of Operational Research, 177(1), 1-21. https://doi.org/10.1016/j.ejor.2006.02.025

Petersen, C. G., & Aase, G. (2004). A comparison of picking, storage, and routing policies in manual order picking. International Journal of Production Economics, 92(1), 11-19. https://doi.org/10.1016/j.ijpe.2003.09.006

What the QSO 630 Module 6 instructions ask for

The Module 6 assignment in QSO 630 usually asks students to analyze warehouse operations for a company and recommend improvements. Expect to examine layout, storage assignment, order picking, packing and shipping, and the information systems that support them, and to measure performance in terms such as order cycle time, accuracy, space use and labor cost. Strong papers start from measurement rather than opinion, find which activity consumes the most time or causes the most errors, match the storage and picking method to how orders actually look, connect warehouse timing to transportation departures and customer service standards and estimate the benefit of each change. Recommendations for software or scanning should say what problem they solve, not simply that technology helps.

How this QSO 630 Module 6 warehouse management assignment example is built

The assignment redesigns the fish room at Brackwater Aquatics, a fictional Ruskin, Florida wholesaler, where fish are netted order by order from 2,900 tanks in 31 aisles, bagged at one central bench and held sealed until a 3 p.m. pickup. Time studies show the first fish of an average order is bagged about four hours before the box leaves. The paper moves the 60 fastest-selling species, 58 percent of fish shipped, next to packing, switches to batch netting by species, packs in three waves timed to each carrier and, in dry goods, places fast class A items at waist height and adds handheld scanning. Bagging-to-departure time falls to about 80 minutes. De Koster and colleagues, Gu and colleagues and Petersen and Aase are cited.

Where the QSO 630 Module 6 rubric puts the points

The QSO 630 warehouse assignment is usually graded on measured analysis of current operations, identification of the biggest source of time, cost or error, storage and picking methods matched to the order profile, links between warehouse timing and transportation and service standards, sensible use of information systems, estimated benefits and an implementation plan that keeps the operation running. Papers that turn a time study into a design earn the most. They lose points for redesigning the floor plan without data, recommending a warehouse system as a cure-all, ignoring how picking and packing interact or judging the design by space saved when the real cost is time. Tables, APA style and plain writing complete the grade.

QSO 630 Module 6 help: the mistakes that cost points

Measure before you redesign. Follow a sample of orders from release to dock and record where the time goes: walking, searching, picking, packing, waiting. Look at your order profile: how many lines per order, which items appear most often, whether many orders share the same items. Fast movers belong closest to packing. If many orders share items, picking in batches and sorting afterward can beat picking order by order. Then look at packing and shipping together, since the best pick sequence follows departure times. Add scanning or software only where it fixes an error or a delay you measured. Estimate the gain for each change. Papers often redraw the layout to save space, when the bigger cost is people walking and goods waiting.

Get QSO 630 Module 6 written to your instructions

Share the QSO 630 Module 6 instructions and describe your warehouse or distribution center. A writer studies where time goes from order to dock, redesigns storage locations, picking method and packing sequence, adds the scanning or software support it needs, estimates the gain in time, accuracy and cost and supports it with warehousing research. We write the first QSO 630 assignment you send without charge, generally turned around over two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 630 papers and related MS Operations Management samples

QSO 630 Module 6 questions, answered

Where can I find a free QSO 630 Module 6 warehouse management sample?

This page holds the full QSO 630 Module 6 assignment, redesigning the fish room and packing line at an invented aquarium wholesaler.

What is batch picking?

Picking the same item for several orders in one trip, then sorting the items to their orders, which cuts travel when many orders share items.

What is class-based storage in a warehouse?

Giving the items picked most often the spots closest to the packing bench or dock, and pushing rarely picked stock to the back.

How do you measure warehouse performance?

With measures such as order cycle time, picking accuracy, lines picked per labor hour, space use and on-time shipping.

Why should packing be timed to carrier departures?

So that orders leave soon after they are packed, which reduces waiting, protects perishable goods and smooths the workload.