| Course | QSO 630 Supply Chain Management |
|---|---|
| Module | Module 3 |
| Paper type | graduate assignment comparing transportation modes and carriers by total delivered cost, including losses in transit, and assigning each customer region the mode that serves it best |
| Length | About 1,250 words, 7 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 630 Module 3
Hours in the Bag: A Mode Plan for Brackwater's Live Shipments
[Student Name]
Southern New Hampshire University
QSO 630: Supply Chain Management
Transportation Planning Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Hours in the Bag: A Mode Plan for Brackwater's Live Shipments
Introduction
Brackwater Aquatics ships about 61,000 foam boxes of live fish a year to pet stores in 38 states, an average of about 235 boxes each shipping day. Nearly four of every five go by a national parcel carrier's overnight service because it reaches every address and needs no planning. The service standards written in Module 2 promise stores that 98 percent of fish will arrive alive, yet across all shipments about 3.6 percent die on the way, and the rate on parcel shipments is higher still. This paper compares Brackwater's three transportation options on total delivered cost, assigns each customer region the mode that serves it best and tests the plan against the problems most likely to upset it.
Why Time in the Bag Matters
Fish travel in sealed plastic bags holding about one-third water and two-thirds pure oxygen, packed in foam boxes with heat or cold packs depending on season. Harmon (2009) explains that fish in transport face three linked threats: dissolved oxygen falls, ammonia from their own waste rises, and temperature drifts away from what the species tolerates. Each of these grows with time. Brackwater's claim data show the effect clearly. Boxes opened within 16 hours of bagging lose about 1.3 percent of fish, boxes opened at 16 to 24 hours lose about 3.1 percent, and boxes opened after 24 hours lose about 7.4 percent. Any mode that shortens the hours in the bag therefore saves fish, and any mode that adds hours, including a store's late pickup, costs them.
The Three Options
The first option, overnight parcel, is what Brackwater uses today. Its boxes are collected at 3 p.m. and reach most stores by 10:30 the next morning. Because packing starts at 7 a.m., the average box spends 20 to 24 hours in the bag by the time the store opens it. The parcel carrier charges about $68 per box under Brackwater's contract, including the dimensional weight surcharge on large foam boxes. Parcel networks move boxes through sort hubs where temperature is not controlled, which matters most in January and August.
The second option is airline counter-to-counter cargo. Brackwater can drop boxes at an airline's cargo counter at Tampa as late as 4 p.m. for evening flights, and stores collect them at the arrival airport, often before 9 p.m. the same day. Bag time falls to 12 to 16 hours. Feng et al. (2015) describe how airlines treat cargo as a secondary product to passenger service, filling the belly space left after bags, which makes capacity uncertain on full flights and dependent on the passenger schedule. The rate averages about $41 per box, but the store must drive to the airport, and only stores within about 45 minutes of a served airport will do so.
The third option is the company's own fleet. Brackwater runs two heated box trucks on fixed overnight routes to stores in Florida and southern Georgia, leaving at 6 p.m. and delivering from 5 a.m. Bag time is 14 to 18 hours and temperature is controlled throughout. The cost per box is about $29 on full routes, covering drivers, fuel, leases and maintenance.
Total Delivered Cost
Cost per box by mode, current average
| Item | Overnight parcel | Airline cargo | Company truck |
|---|---|---|---|
| Freight per box | $68.00 | $41.00 | $29.00 |
| Fish value per box (wholesale) | $295 | $295 | $295 |
| Share of fish dead on arrival | 3.9% | 2.1% | 1.4% |
| Value lost per box | $11.51 | $6.20 | $4.13 |
| Claims handling per box | $1.90 | $1.20 | $0.80 |
| Store's own cost to collect | none | about $14 | none |
| Total delivered cost per box | $81.41 | $62.40 | $33.93 |
The store's cost to collect is included because a store that spends an hour driving to the airport is paying part of the transportation bill, and stores that find it burdensome will either stop ordering or ask for a lower price. Even with that cost included, airline cargo beats parcel by about $19 a box where it is available. The truck is cheapest of all, but only on routes dense enough to fill it.
Regional Plan
Recommended mode by customer region
| Region | Stores | Boxes a year | Mode | Reason |
|---|---|---|---|---|
| Florida, Georgia, South Carolina | 214 | 15,800 | Company trucks (three routes) | Dense, within 350 miles, lowest loss |
| Stores within 45 minutes of 23 served airports | 386 | 22,400 | Airline cargo | Short bag time, lower rate |
| Coastline Pet stores outside truck routes | 31 | 2,100 | Airline cargo with chain courier | Chain collects at airport |
| All other stores | 519 | 20,700 | Parcel, pickup moved to 1 p.m. | Only option, earlier packing shortens bag time |
Adding a third truck route through Columbia and Charleston is justified because South Carolina's 41 stores already order about 3,000 boxes a year, enough to fill a truck on four nights a week. Caplice (2007) describes truckload freight as a market in which shippers with steady, predictable lanes get better service and rates from carriers than shippers whose volumes swing; Brackwater considered hiring a regional refrigerated carrier for the South Carolina route, and that option remains the backup if the third truck is not filled.
For stores staying on parcel, the plan moves packing for those orders earlier and asks the carrier for a 1 p.m. pickup, which cuts the average bag time by about two hours. Packing those boxes first also frees the afternoon for airline and truck boxes, which leave later.
Estimated Savings
Applying each region's mode to its boxes, the plan lowers total delivered cost by about $410,000 a year compared with today: about $290,000 from moving 22,400 boxes from parcel to airline cargo, about $85,000 from the South Carolina truck route, and about $35,000 from earlier parcel pickups. The overall share of fish arriving dead is projected to fall from 3.6 percent to about 2.4 percent. That is still above the 98 percent standard, so Module 6 will look at the packing line itself.
Testing the Plan
Three things could break the plan. First, winter storms close airports and delay trucks. On days when the National Weather Service forecasts hard freezes or ice along a route, the plan holds live shipments to that region rather than risk them, and stores are told by 9 a.m. Second, airlines cut flights or embargo live animals in summer heat; when Tampa ground temperatures are forecast above 95 degrees, cargo boxes get extra cold packs and must be at the counter by 2 p.m. If an airline drops a route, those stores revert to parcel until another carrier is found. Third, a truck breaks down. Each route has a pre-arranged backup with a local refrigerated carrier, and boxes can be moved to parcel the same afternoon.
Links to Service and Inventory
Faster modes reduce the fish Brackwater must hold to replace losses and lower the claims workload the new claims desk will handle. The earlier parcel pickup, however, puts pressure on the 11 a.m. cutoff in the service standards, so parcel stores will see a 10 a.m. cutoff on the portal. That trade-off will be reviewed after the first quarter.
Conclusion
Measured by freight alone, Brackwater ships the expensive way for no reason; measured by total delivered cost, the picture is more nuanced but leads to the same place. Trucks for the dense southeastern lanes, airline cargo for stores near served airports and earlier parcel pickups for everyone else would cut total delivered cost by about $410,000 a year and save roughly one in three fish now lost in transit. Each lane has a backup, and the plan will be reviewed each quarter with the service standards it supports.
References
Caplice, C. (2007). Electronic markets for truckload transportation. Production and Operations Management, 16(4), 423-436. https://doi.org/10.1111/j.1937-5956.2007.tb00270.x
Feng, B., Li, Y., & Shen, Z.-J. M. (2015). Air cargo operations: Literature review and comparison with practices. Transportation Research Part C: Emerging Technologies, 56, 263-280. https://doi.org/10.1016/j.trc.2015.03.028
Harmon, T. S. (2009). Methods for reducing stressors and maintaining water quality associated with live fish transport in tanks: A review of the basics. Reviews in Aquaculture, 1(1), 58-66. https://doi.org/10.1111/j.1753-5131.2008.01003.x
What the QSO 630 Module 3 instructions ask for
The Module 3 assignment in QSO 630 typically asks students to develop a transportation plan for a company, choosing among modes and carriers and justifying the choice. Expect to compare options such as truckload, less-than-truckload, parcel, air and intermodal on cost, transit time, reliability, capacity and risk of loss or damage, and to explain how the transportation decision connects to inventory and customer service. Strong papers compare modes on total cost rather than freight rates alone, include the cost of slow or damaged deliveries, divide customers into lanes or regions instead of choosing one mode for everyone, consider private fleets as well as carriers, and test the plan against the things most likely to go wrong. Clear tables of cost per shipment make the reasoning easy to follow.
How this QSO 630 Module 3 transportation planning assignment example is built
The assignment plans transportation for Brackwater Aquatics, a fictional Ruskin, Florida wholesaler that ships about 61,000 foam boxes of live fish a year, 78 percent by overnight parcel. Parcel costs about $68 a box with 3.9 percent of fish dead, airline counter-to-counter cargo about $41 with 2.1 percent dead but a drive to the airport for the store, and Brackwater's own heated trucks about $29 within 350 miles with 1.4 percent dead. Counting dead fish and credits reverses the ranking for many stores. The plan assigns three nearby states to trucks, stores near 23 airports to cargo and the rest to earlier parcel pickups, saving about $410,000 a year. Harmon, Feng and colleagues and Caplice are cited.
Where the QSO 630 Module 3 rubric puts the points
Points in the QSO 630 transportation planning assignment are generally awarded for a clear description of current shipping, a fair comparison of modes on cost, time, reliability and loss, a total delivered cost that includes more than freight, a plan that differs by lane or region for stated reasons, attention to the private fleet option, a link to service standards and inventory, and a test of the plan against disruptions. Papers rise when the numbers show a choice the company had not seen. They lose credit when they compare freight rates alone, pick one mode for everyone, ignore customers' own costs such as driving to an airport, or present a plan with no backup. Tables, APA citations and careful prose complete the grade.
QSO 630 Module 3 help: the mistakes that cost points
List your current shipments by lane or region, with volumes and what each mode costs. Then add what the freight bill hides: the value of goods damaged or lost in transit, the cost of late deliveries, extra inventory needed for slower modes and any cost the customer bears, such as picking freight up. Compare modes on that total, region by region. Look at whether a private fleet makes sense for dense nearby lanes, since trucks are cheapest when they are full. Choose a mode for each region and explain why. Finally, test the plan: what happens in a storm, a carrier strike or a capacity squeeze? Papers often pick the lowest rate and stop, which misses that the cheapest mode can deliver the most expensive outcome.
Get QSO 630 Module 3 written to your instructions
Send the QSO 630 Module 3 instructions with your shipment volumes and lanes. A writer compares modes and carriers on freight, transit time, reliability and loss or damage, builds a total delivered cost per shipment, assigns lanes or regions to the best option, tests the plan against disruptions and cites transportation research. A first QSO 630 assignment comes free, generally back in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 630 papers and related MS Operations Management samples
- QSO 630 Module 1 Discussion: From Farm Pond to Store Tank
- QSO 630 Module 2 Customer Service Standards Assignment: What the Stores Are Promised
- QSO 630 Module 4 Discussion: A Pet Chain's Half-Price Weekend
- QSO 630 Module 5 Inventory Control Assignment: 3,600 Products and a 91 Percent Fill Rate
- QSO 630 Module 6 Warehouse Management Assignment: The Fish Room and the Packing Line
- QSO 630 Module 7 Discussion: Wild-Caught Imports and Who Answers for Them
- QSO 630 Module 8 Procurement Assignment: Scoring Three Overseas Exporters
- QSO 630 Module 9 Final Project: The Supply Chain Improvement Plan
- QSO 630 Module 10 Discussion: The Week the Bogotá Flight Was Canceled
- MGT 701 Module 9 Discussion: Leading Through Resistance
- BMB 655 Module 8 Budgeting Assignment: A Cash Budget Built Around Late Royalty Statements
- MKT 620 Module 1 Discussion: Why Consumers Buy, and Why They Do Not
- INT 620 Module 3 Discussion: Should Kettle Moraine Hedge at All?
QSO 630 Module 3 questions, answered
Where can I find a free QSO 630 Module 3 Transportation Planning sample?
The complete QSO 630 Module 3 assignment is on this page: choosing parcel, air cargo or company trucks for an invented live fish wholesaler.
What is total delivered cost in transportation planning?
Freight plus everything the mode causes downstream, such as loss and damage, late-delivery costs, inventory in transit and costs the customer bears.
When does a private truck fleet make sense?
When lanes are short and dense enough to keep trucks full on regular routes, or when control over handling and timing matters more than the lowest rate.
What is counter-to-counter air cargo?
A service in which a shipper drops freight at an airline's cargo counter and the consignee collects it at the destination airport, usually on the same day.
How should a transportation plan handle disruptions?
By naming a backup mode or carrier for each lane, setting triggers for switching and knowing in advance what the switch costs.