Free sample paper for QSO 630 Module 10
Module Ten Discussion
One Flight a Week Was the Whole Route
In September the airline that runs the only weekly cargo flight from Bogotá to Miami used by our Colombian exporter suspended it for three weeks to move the aircraft to another route. Nobody warned us; the exporter learned two days before the flight. That route carries all our wild cardinal tetras and most of our South American catfish, about 6 percent of the fish we sell, and in autumn cardinals are one of the species stores ask for by name. We had about ten days of cardinals in quarantine. We bought the rest from an importer in Miami at roughly 40 percent more per fish, rationed what we had to stores that order every week, and told the others to wait. By our count the three weeks cost about $31,000 in lost margin, plus some stores that tried another wholesaler and have not all come back.
Craighead et al. (2007) built their argument from interviews and case material and concluded that how badly a disruption hurts follows from the shape of the chain, above all from points that a large share of the flow cannot avoid, and from how early the firm gets warning and how fast it can bounce back. Our route had one node on which everything depended, a single flight, and almost no warning. In our scorecard work in Module 8 I gave the Bogotá exporter a low score for route risk, but I treated it as one row among seven rather than as the thing that could stop supply entirely.
Tomlin (2006) modeled a firm choosing between holding inventory, sourcing from a more reliable supplier and simply accepting the risk, and found that as disruptions become rarer but longer, sourcing protection becomes more attractive than stock. That fits us exactly. Holding three weeks of extra cardinals would mean more tanks, more losses in quarantine and fish growing stale against our 21-day limit. A standing agreement with the Miami importer, a guaranteed allocation at an agreed premium triggered when our route fails, costs little in normal weeks. Tang (2006) notes that the most useful risk measures also help in ordinary times, and the agreement does: it gives us a second price to compare against.
I started QSO 630 thinking our problems were inside the building. I now see most of them at the handoffs, between packing and the carrier, between Coastline's promotions and our buying, between an exporter's river and our quarantine. This disruption was the same lesson at a larger scale.
What is the one route, supplier or building your chain cannot do without, and what would you do the morning it failed?
References
Craighead, C. W., Blackhurst, J., Rungtusanatham, M. J., & Handfield, R. B. (2007). The severity of supply chain disruptions: Design characteristics and mitigation capabilities. Decision Sciences, 38(1), 131-156. https://doi.org/10.1111/j.1540-5915.2007.00151.x
Tang, C. S. (2006). Perspectives in supply chain risk management. International Journal of Production Economics, 103(2), 451-488. https://doi.org/10.1016/j.ijpe.2005.12.006
Tomlin, B. (2006). On the value of mitigation and contingency strategies for managing supply chain disruption risks. Management Science, 52(5), 639-657. https://doi.org/10.1287/mnsc.1060.0515
What the QSO 630 Module 10 instructions ask for
For its last thread, QSO 630 has students look back over the ten modules and put its ideas to work to a supply chain challenge, often risk, disruption or international operations. Expect to describe a disruption that happened or could happen, analyze why it would be costly, evaluate options such as extra inventory, multiple suppliers, alternative routes and better information, and recommend an approach. Strong posts connect the event to the structure of the chain, for instance a single critical supplier or route, weigh what each protection costs in normal times, match the response to whether disruptions are frequent and short or rare and long and say plainly which QSO 630 idea altered the way the writer reads a chain. Replies should probe whether a classmate's backup would truly be available when needed.
How this QSO 630 Module 10 discussion example is built
The post describes a disruption at Brackwater Aquatics, a fictional Ruskin, Florida fish wholesaler, when the only weekly cargo flight carrying its Colombian exporter's boxes to Miami was suspended for three weeks. Wild cardinal tetras and South American catfish, about 6 percent of fish sales, were cut off. Brackwater bought from a Miami importer at about 40 percent more, rationed cardinals to regular customers and lost about $31,000 in margin. The writer explains why one flight was a critical node, compares a larger quarantine stock with a standing agreement with the Miami importer and recommends the agreement for a rare but long disruption. Craighead and colleagues, Tomlin and Tang are cited.
Where the QSO 630 Module 10 rubric puts the points
Credit in the last QSO 630 thread goes to a concrete disruption with its costs, an explanation of severity grounded in the chain's design, a comparison of protective options including what they cost in normal times, a recommendation matched to how often and how long such events last, a genuine reflection on what the course changed and research used to support the reasoning. Posts lose marks when they list generic risk strategies without choosing, ignore the cost of protection, recommend extra stock for goods that cannot be held, or skip the reflection. Replies that test whether a classmate's backup supplier would have capacity during the same event earn the strongest marks. APA citations and focused writing finish the grade.
QSO 630 Module 10 help: the mistakes that cost points
Choose one disruption, real or plausible, and say what it would cost: lost sales, higher prices, angry customers. Then ask why it would be so damaging. Often the answer is a single supplier, route or facility that everything passes through. List the protections you could buy: more inventory, a second supplier, an alternate route, faster warning. Say what each costs when nothing goes wrong. Match your choice to the disruption: stock works for short, frequent hiccups, while long, rare outages call for another source. Then reflect on the course: which idea changed how you see your chain? Posts often recommend every protection at once, which no company can afford, or forget that some products cannot simply be stockpiled.
Get QSO 630 Module 10 written to your instructions
Paste the QSO 630 Module 10 prompt and describe a disruption your chain has faced or could face. A writer identifies what made it severe, compares holding stock, adding sources and arranging contingency routes, recommends the response that suits how often and how long such events occur, reflects on what the course taught and cites disruption research, closing with a pointed question. We write your first QSO 630 post free, in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 630 papers and related MS Operations Management samples
- QSO 630 Module 1 Discussion: From Farm Pond to Store Tank
- QSO 630 Module 2 Customer Service Standards Assignment: What the Stores Are Promised
- QSO 630 Module 3 Transportation Planning Assignment: Parcel, Airline Cargo or Our Own Trucks
- QSO 630 Module 4 Discussion: A Pet Chain's Half-Price Weekend
- QSO 630 Module 5 Inventory Control Assignment: 3,600 Products and a 91 Percent Fill Rate
- QSO 630 Module 6 Warehouse Management Assignment: The Fish Room and the Packing Line
- QSO 630 Module 7 Discussion: Wild-Caught Imports and Who Answers for Them
- QSO 630 Module 8 Procurement Assignment: Scoring Three Overseas Exporters
- QSO 630 Module 9 Final Project: The Supply Chain Improvement Plan
- MBA 687 Module 3 Milestone One Change Readiness Assessment: Readiness and culture at Veritane US
- BMB 670 Module 6 Milestone Two: Safety, Fees and Sponsors
- MKT 500 Module 6 Milestone Six: Customer Research and Marketing Objectives
- TAX 650 Module 5 Business Deductions Assignment: The Garden Design Business
QSO 630 Module 10 questions, answered
Where can I find a free QSO 630 Module 10 Discussion sample?
This page has the full QSO 630 Module 10 post on a canceled cargo flight that cut off an invented wholesaler's Colombian fish supply.
What makes a supply chain disruption severe?
Mainly how much flows through the affected point, how complex and dense the chain is around it, and how quickly the firm can detect the problem and recover.
How do mitigation and contingency differ when a supply route fails?
Mitigation is preparation made in advance, such as extra stock or a second supplier; contingency is action taken once a disruption occurs, such as rerouting.
When is holding extra inventory a poor defense against disruption?
When goods are perishable or costly to hold, or when disruptions last longer than any reasonable stock would cover.
What should a reflective final discussion post include?
A specific situation, an application of course ideas, a reasoned recommendation and an honest account of what you learned.