| Course | QSO 630 Supply Chain Management |
|---|---|
| Module | Module 5 |
| Paper type | graduate assignment classifying a distributor's stock, setting order quantities and safety stock that reflect lead-time variation, and treating perishable stock under its own rules, to reach a fill-rate target at a known cost |
| Length | About 1,400 words, 8 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 630 Module 5
Ninety-One to Ninety-Seven: An Inventory Policy for Brackwater's Dry Goods and Live Stock
[Student Name]
Southern New Hampshire University
QSO 630: Supply Chain Management
Inventory Control Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Ninety-One to Ninety-Seven: An Inventory Policy for Brackwater's Dry Goods and Live Stock
Introduction
The service standards Brackwater Aquatics adopted in Module 2 promise independent stores that 97 percent of dry-goods order lines will ship complete, and promise Coastline Pet 98 percent. Today the figure is 91 percent. At the same time, the dry-goods warehouse holds about $3.1 million of stock, and a walk through its back aisles finds cartons of decorations and discontinued food that have not moved in a year. The problem is not too little inventory but the wrong inventory. This paper classifies Brackwater's 3,600 dry-goods items, sets order quantities and reorder points that allow for both demand and supply variation, ties service targets to item classes, estimates the investment and sets separate rules for the live fish that cannot be stocked like filters.
The Current Practice
Two buyers order dry goods. Each week they look at a report of items below a fixed minimum set years ago, call or email suppliers and decide quantities by experience. About 45 percent of items come from manufacturers in China and Taiwan, shipped by ocean container through the Port of Tampa with lead times of ten to fourteen weeks from order to shelf. The rest come from U.S. suppliers in one to two weeks. The minimums were never adjusted for the change in import lead times after 2020, and they are the same for an item that sells 4,000 a year as for one that sells 40.
Classifying the Items
A standard ABC analysis ranks items by annual dollar volume, unit cost times annual units. That ranking matters for investment but can mislead about service, because a fill-rate standard counts order lines, and a cheap item that appears on hundreds of orders can spoil more lines than an expensive item ordered rarely. Flores and Whybark (1986) proposed classifying on more than one criterion and combining the results into a single class, so that items important on any dimension receive closer control. This paper uses two: annual dollar volume and the number of order lines on which an item appeared last year.
Brackwater dry goods by combined class
| Class | Items | Share of dollar volume | Share of order lines | Line fill target |
|---|---|---|---|---|
| A | 540 | 72% | 48% | 99% |
| B | 900 | 20% | 30% | 97% |
| C | 2,160 | 8% | 22% | 93% |
An item is class A if it is in the top 15 percent on either criterion, which moves about 110 inexpensive but frequently ordered items, such as fish nets, thermometers and small food containers, up from C or B. The weighted line fill across the three targets is 0.48 times 99 percent plus 0.30 times 97 percent plus 0.22 times 93 percent, or about 97.1 percent, meeting the standard without asking for perfection on items stores can wait for.
Order Quantity
In a short note first printed in 1913 and reprinted later, Harris (1990) worked out, for a factory deciding how many parts to run at once, the lot size where paperwork and setup spending per year balances the money tied up on the shelf, the idea now called the economic order quantity. Take Brackwater's best-selling canister filter, a domestic item: annual demand is about 4,800 units, raising and receiving one purchase order runs near $85, the unit cost is $38 and holding cost runs about 22 percent of value a year. Doubling 4,800 times $85 and dividing by 0.22 times $38 gives about 97,600; its square root, roughly 310 units, is the lot size, about three and a half weeks of sales.
For imports the formula gives way to practical limits. A heater from a Taiwanese maker sells about 2,600 units a year, and a 40-foot container holds about 5,000 of them, but Brackwater consolidates heaters with pumps and lighting from the same supplier into one container every six weeks. Order quantity for each item in that container is therefore six weeks of expected demand, adjusted so the container is full. The textbook number is still useful as a check: if six weeks of an item's demand is far below its economic order quantity, it may be cheaper to buy it from a domestic distributor in smaller amounts.
Safety Stock
Safety stock protects against demand during the lead time running higher than expected. When the lead time itself varies, as import lead times do, the protection must cover both. For the imported canister filter sold under Brackwater's own label, weekly demand averages 92 units with a standard deviation of 30, and the lead time averages 12 weeks with a standard deviation of two weeks. Combining both sources of spread over the replenishment window gives the square root of 12 times 30 squared plus 92 squared times 2 squared, which is the square root of 10,800 plus 33,856, or about 211 units. Most of that comes from the lead-time term, a reminder that a two-week delay at the port is worth more than a few unusual weeks of sales.
For a class A item, a cycle service factor of about 2.05 corresponds to a 98 percent chance of not running out in a replenishment cycle, which, given the order sizes involved, produces a line fill rate near 99 percent. Safety stock is therefore about 2.05 times 211, or 433 units, and the reorder point is 12 weeks of average demand, 1,104 units, plus 433, or about 1,540 units on hand and on order. Under the old fixed minimum of 600 units, the filter ran out three times last year.
Safety stock approach by class
| Class | Service factor | Lead-time variation included | Review |
|---|---|---|---|
| A | about 2.05 | Yes, from last 12 months of receipts | Weekly |
| B | about 1.65 | Yes | Every two weeks |
| C | about 1.0, or order on demand from domestic distributor | Domestic items only | Monthly |
What the Policy Costs
Applying the new reorder points across class A and B items raises their safety stock by about $210,000. Holding cost at 22 percent is about $46,000 a year. On the other side, about 640 class C items carry more than a year of supply, and about 180 have not sold in twelve months. Returning what suppliers will take, discounting the rest through Brackwater's clearance list and setting C reorder points to near zero for items that can be bought domestically within a week frees about $95,000. Net added inventory is therefore about $115,000, roughly 4 percent of today's dry-goods stock, to move fill from 91 to 97 percent. Lost sales from short lines, estimated from stores that reorder the missing item elsewhere, run about $380,000 a year in margin, so the policy pays for itself several times.
Live Fish as Perishable Stock
Live fish cannot follow the same rules. Nahmias (1982) reviewed inventory models for goods with a limited life and showed that the order policy must account for stock that perishes as well as stock that sells, which pushes the best order size down as the useful life shortens. Fish do not expire on a date, but each week in a holding tank costs feed, water and labor and raises the chance of disease or loss. Brackwater's own records show holding mortality of about 0.4 percent a week rising to about 1.1 percent after three weeks. The policy therefore sets a 21-day holding limit for most species, after which fish are offered at a discount to stores on truck routes. Farm orders are placed twice a week, sized to the next two shipping weeks' expected orders plus a buffer for that species' typical swing, and fish are shipped oldest first. Imported fish, with longer quarantine, are ordered every two weeks.
Information and Review
The buyers will now work from a weekly exception report listing items at or below their reorder points, with lead-time statistics updated monthly from actual receipts. Classes are recalculated each quarter. Because the shared promotion calendar proposed with Coastline Pet would announce demand spikes weeks ahead, promoted items will be flagged and ordered separately so that a promotion does not raise their reorder points for months afterward.
Conclusion
Brackwater's fill-rate gap comes from fixed minimums that ignore how much and how reliably each item sells. Classifying on both dollars and order lines, setting order sizes by formula and container, and building safety stock that respects import lead-time swings would lift dry-goods fill to about 97 percent for a net added investment of about $115,000. Live fish get a 21-day limit and twice-weekly farm orders, because stock that perishes needs rules of its own.
References
Flores, B. E., & Whybark, D. C. (1986). Multiple criteria ABC analysis. International Journal of Operations & Production Management, 6(3), 38-46. https://doi.org/10.1108/eb054765
Harris, F. W. (1990). How many parts to make at once. Operations Research, 38(6), 947-950. https://doi.org/10.1287/opre.38.6.947
Nahmias, S. (1982). Perishable inventory theory: A review. Operations Research, 30(4), 680-708. https://doi.org/10.1287/opre.30.4.680
What the QSO 630 Module 5 instructions ask for
In Module 5, QSO 630 hands students a company's stock records and wants control policies back. Expect to classify items, for example with ABC analysis, calculate order quantities and reorder points, set safety stock for a chosen service level and explain the trade-off between holding cost and stockouts. Strong papers classify on more than one criterion when dollar value alone would mislead, show the formulas and a worked example with stated assumptions, account for variation in lead time as well as demand, explain when practical limits such as container loads or supplier minimums override the textbook order quantity, set different targets for different classes and estimate what the policy costs in inventory investment. Perishable or obsolete items deserve their own treatment rather than the general rule.
How this QSO 630 Module 5 inventory control assignment example is built
The assignment sets inventory policy for Brackwater Aquatics, a fictional Ruskin, Florida wholesaler whose 3,600 dry-goods items ship complete on only 91 percent of order lines. Items are classified on dollar volume and on how often they appear in orders: 540 class A items carry 72 percent of dollars and 48 percent of lines. An order quantity of about 310 units is calculated for a canister filter, then overridden by container loads for imports. Safety stock for a 12-week lead time that swings by two weeks comes to about 430 units. Fill targets of 99, 97 and 93 percent by class reach 97 percent overall, adding about $210,000 of stock on A and B items while cutting $95,000 from C. Harris, Flores and Whybark and Nahmias are cited.
Where the QSO 630 Module 5 rubric puts the points
The QSO 630 inventory assignment tends to reward a classification that fits the business, correct order quantity and reorder point calculations with assumptions stated, safety stock that includes lead-time variation, service targets tied to item classes and to the company's promises, honest treatment of practical limits on order sizes, an estimate of the added or released investment and separate handling for perishable stock. The best papers show where the textbook answer must bend. Marks fall for applying one rule to every item, for safety stock based on demand variation alone, for service levels with no link to customer standards or for formulas presented without a worked example. Tables, APA references and clear explanation complete the grade.
QSO 630 Module 5 help: the mistakes that cost points
Start by sorting your items. Rank them by annual dollar volume, then check whether that ranking matches how often items appear on orders, since a cheap item on many orders can hurt service more than an expensive one on a few. Set targets by class. Work one item fully: its order quantity, its average demand over the lead time, and safety stock using both demand variation and lead-time variation. Then ask whether practical limits, such as a supplier's minimum or a container load, change the answer. Add up what the policy does to total inventory, including stock you can cut. Treat items that spoil or go out of date separately. Papers often compute safety stock from demand alone, which badly understates what imports with uncertain lead times need.
Get QSO 630 Module 5 written to your instructions
Share the QSO 630 Module 5 instructions and your item data. A writer classifies your stock, calculates order quantities and reorder points, sets safety stock that reflects both demand and lead-time variation, matches service targets to item classes, estimates the inventory investment and handles perishable or obsolete stock, citing inventory research. Your first QSO 630 assignment is written free of charge, usually inside two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 630 papers and related MS Operations Management samples
- QSO 630 Module 1 Discussion: From Farm Pond to Store Tank
- QSO 630 Module 2 Customer Service Standards Assignment: What the Stores Are Promised
- QSO 630 Module 3 Transportation Planning Assignment: Parcel, Airline Cargo or Our Own Trucks
- QSO 630 Module 4 Discussion: A Pet Chain's Half-Price Weekend
- QSO 630 Module 6 Warehouse Management Assignment: The Fish Room and the Packing Line
- QSO 630 Module 7 Discussion: Wild-Caught Imports and Who Answers for Them
- QSO 630 Module 8 Procurement Assignment: Scoring Three Overseas Exporters
- QSO 630 Module 9 Final Project: The Supply Chain Improvement Plan
- QSO 630 Module 10 Discussion: The Week the Bogotá Flight Was Canceled
- QSO 511 Module 1 Discussion: Framing an Analytics Question
- BMB 630 Module 4 Discussion: Turning an Audience Into a Community
- OL 640 Module 4 Discussion: Territories and Encroachment
- INT 640 Module 10 Final Project: The International Market Strategy
QSO 630 Module 5 questions, answered
Where can I find a free QSO 630 Module 5 inventory control sample?
The full QSO 630 Module 5 assignment is on this page, setting stock policy for an invented aquarium wholesaler's dry goods and live fish.
What is ABC analysis in inventory control?
Sorting items into classes by importance, usually annual dollar volume, so the most important items get the tightest control and highest service targets.
How is safety stock calculated when lead times vary?
By combining variation in demand during the lead time with variation in the lead time itself, then multiplying by a factor for the chosen service level.
Why might the economic order quantity not be used?
Because supplier minimums, container or truck loads, price breaks or shelf life can make a different order size cheaper in practice.
How should perishable inventory be managed?
With limits on how long stock is held, first-in first-out issue and orders sized to expected use within its useful life.