| Course | TAX 650 Federal Taxation of Individuals |
|---|---|
| Module | Module 5 |
| Paper type | graduate assignment computing a sole proprietor's Schedule C net profit, home office and vehicle deductions, self-employment tax, a retirement contribution and the qualified business income deduction |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Accounting |
| Updated | October 2026 |
Free sample paper for TAX 650 Module 5
The Garden Design Business: Theo Varga's 2024 Sole Proprietorship Return
[Student Name]
Southern New Hampshire University
TAX 650: Federal Taxation of Individuals
Business Deductions Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
The Garden Design Business: Theo Varga's 2024 Sole Proprietorship Return
Introduction
Theo Varga runs a sole proprietorship designing residential gardens in the Raleigh area, preparing plans and overseeing installers whom Theo hires as subcontractors. In 2024 the business earned $86,000 of gross receipts, including about $6,500 that clients paid in cash, discussed later in Module 8. This paper identifies Theo's deductible business expenses, computes vehicle and home office deductions, net profit, self-employment tax, a SEP-IRA contribution and the qualified business income deduction.
Ordinary and Necessary Expenses
Under section 162, a business may deduct costs that are common and helpful in its line of work. The Internal Revenue Service (2024a) describes in Publication 334 how sole proprietors report these on Schedule C.
Business expenses before vehicle and home office
| Expense | Amount | Note |
|---|---|---|
| Design software subscriptions | $2,400 | Used only for the business |
| Subcontracted installers | $9,800 | Forms 1099-NEC issued |
| Business liability insurance | $1,600 | |
| Marketing and website | $1,200 | |
| Phone and internet, business share | $900 | 50% of combined bills, based on use |
| Professional training | $650 | Garden design certification course |
| Supplies | $700 | Drafting and presentation materials |
| Total | $17,250 |
Theo also paid for a family membership at a botanical garden, which Theo uses for inspiration. That is a personal expense with incidental business benefit and is not deductible. The same reasoning excludes Theo's general gardening magazines, which the family reads, while the professional design journal, read only for work, belongs in supplies. Subcontractor payments are deductible because Theo controls the projects and pays the installers directly; each installer who received $600 or more received a Form 1099-NEC, which protects the deduction if it is questioned.
Vehicle Expenses
Theo drove 6,200 business miles in 2024 visiting clients and sites, documented in a mileage log, out of 15,800 total miles. At the 2024 business rate of 67 cents for each mile, the deduction comes to $4,154 (Internal Revenue Service, 2024c). Business parking and tolls could be added to the standard rate, but Theo kept no receipts for them, so none are claimed. The actual expense method, 39 percent of the car's operating costs and depreciation, gave a slightly smaller amount, so the standard rate is used. Because Theo used the standard rate in the first year the car was used for business, Theo keeps the option of switching to actual costs in later years; choosing actual costs first would have locked in that method for the car's life.
Home Office
Theo uses a 240-square-foot room in the family's 2,400-square-foot home regularly and exclusively as a design studio and meets clients there, satisfying the home office requirements (Internal Revenue Service, 2024b).
Home office methods compared
| Method | Computation | Deduction |
|---|---|---|
| Simplified | 240 sq ft x $5 | $1,200 |
| Actual expenses, 10% business use | Mortgage interest $14,200, property tax $4,600, insurance $1,500, utilities $3,600, total $23,900 x 10% = $2,390; depreciation on building basis $360,000 x 10% over 39 years = $923 | $3,313 |
The actual method yields more, but the choice also depends on the rest of the return. If the Vargas itemized, the business share of mortgage interest and taxes would merely move from Schedule A to Schedule C. Because their itemized deductions, computed in Module 6, fall below the $29,200 standard deduction, they will not itemize, and the business share of those costs is deductible only through the home office. The actual method therefore adds real deductions. The trade-off is depreciation: when the home is sold, depreciation claimed after May 6, 1997 is taxable, while any remaining gain may still qualify for the home sale exclusion. Theo should keep records of it for as long as the family owns the house.
Net Profit
Schedule C summary
| Item | Amount |
|---|---|
| Gross receipts | $86,000 |
| Expenses before vehicle and home office | ($17,250) |
| Vehicle, standard mileage rate | ($4,154) |
| Home office, actual method | ($3,313) |
| Net profit | $61,283 |
Self-Employment Tax
Self-employment tax applies at 15.3 percent to 92.35 percent of net self-employment earnings. Net earnings are $61,283 x 92.35% = $56,595. Self-employment tax is $56,595 x 15.3% = $8,659. Because Theo's earnings are far below the 2024 Social Security wage base of $168,600, the full rate applies. The Vargas' combined wages and self-employment earnings also fall below the $250,000 threshold for the additional 0.9 percent Medicare tax on joint returns, so that tax does not apply either. Half of the tax, $4,330, is deductible as an adjustment to income.
SEP-IRA Contribution
A sole proprietor's SEP-IRA ceiling works out to one-fifth of earnings once half the self-employment tax has been subtracted. That base is $61,283 minus $4,330, or $56,953, giving a maximum contribution of about $11,391 (Internal Revenue Service, 2024d). Theo contributed $11,000 before the filing deadline, which is deductible as an adjustment to income. Because Theo has no employees, the plan covers only Theo; if Theo later hires staff who meet the eligibility rules, the SEP would have to cover them at the same percentage, a cost to consider before hiring.
Qualified Business Income Deduction
For the deduction, the business's profit is first cut by the items tied to it, half the self-employment tax and the SEP-IRA contribution. That gives $61,283 minus $4,330 minus $11,000, or $45,953. Twenty percent is $9,191. Because the Vargas' taxable income before this deduction, about $133,803, is below the 2024 threshold of $383,900 for joint filers, the wage and property limits and the specified service business rules do not apply. The deduction is also limited to 20 percent of taxable income minus net capital gain, about $25,141, so the full $9,191 is allowed.
Records
Theo needs a contemporaneous mileage log, receipts for every expense, the 1099-NEC forms issued to installers, a floor plan showing the office's size and exclusive use and records of home costs and depreciation, which will matter when the house is sold.
Conclusion
Theo's design business produced net profit of about $61,283 in 2024 after $24,717 of expenses, including vehicle costs at the 67-cent standard rate and a home office deduction of $3,313 under the actual method, which is the better choice because the Vargas will not itemize. Self-employment tax is about $8,659, with $4,330 deductible; an $11,000 SEP-IRA contribution fits within the limit; and the qualified business income deduction is about $9,191.
References
Internal Revenue Service. (2024a). Tax guide for small business (Publication 334). U.S. Department of the Treasury.
Internal Revenue Service. (2024b). Business use of your home (Publication 587). U.S. Department of the Treasury.
Internal Revenue Service. (2024c). Travel, gift, and car expenses (Publication 463). U.S. Department of the Treasury.
Internal Revenue Service. (2024d). Retirement plans for small business (Publication 560). U.S. Department of the Treasury.
What the TAX 650 Module 5 instructions ask for
The TAX 650 business deductions assignment commonly asks students to compute a sole proprietor's income and deductions, often covering a home office, a car, the tax owed on self-employment earnings and the pass-through deduction. Expect to apply the ordinary and necessary standard and specific limitation rules. Strong papers classify expenses correctly, compare alternative methods for home office and vehicle deductions and choose the better one with reasons, compute self-employment tax and its deduction accurately, apply retirement contribution limits for self-employed people, compute the qualified business income deduction with its limits and explain the records required. They use the correct year's rates and show each step. Records should be listed.
How this TAX 650 Module 5 business deductions assignment example is built
The assignment computes Theo Varga's 2024 business results, a fictional Raleigh garden designer with $86,000 of gross receipts. Ordinary and necessary expenses are identified, and vehicle costs use the 67-cent standard mileage rate on 6,200 business miles. The simplified home office method at $5 a square foot is compared with the actual method at 10 percent of home costs and depreciation, and the actual method is chosen because the Vargas will take the standard deduction. Net profit is about $61,283, self-employment tax about $8,659 with half deductible, a $11,000 SEP-IRA contribution fits the limit and the qualified business income deduction is about $9,191. IRS Publications 334, 587, 463 and 560 are cited. Records are listed.
Where the TAX 650 Module 5 rubric puts the points
Grading for the TAX 650 business deductions paper usually rewards correct classification of expenses, a reasoned choice of home office and vehicle methods, accurate self-employment tax and its deduction, correct retirement contribution limits, an accurate qualified business income deduction, the correct year's rates and clear computations with authority. Papers score highest when method choices are explained in light of the whole return. They lose points for personal expenses claimed as business, for using another year's mileage rate, for forgetting the self-employment tax deduction or for computing the qualified business income deduction on gross rather than net business income. Tables, APA references and clear steps complete the grade. Method choices need reasons.
TAX 650 Module 5 help: the mistakes that cost points
List every business expense and ask whether it is ordinary and necessary for this business; separate personal portions. For the car and the home office, compute both available methods and compare. Remember that the home office choice interacts with whether the household itemizes. Find net profit, apply the 15.3 percent rate to 92.35 percent of it and deduct half the result above the line. Work out the retirement contribution limit from net earnings after that adjustment. Then compute the qualified business income deduction. Papers often show totals; the stronger ones show each step so a reviewer could check it. Keep the records that support each method choice.
Get TAX 650 Module 5 written to your instructions
Share the TAX 650 Module 5 instructions and the business facts. A writer identifies deductible expenses, computes car and home office deductions by the better method and works through payroll-type taxes on self-employment, retirement limits and the pass-through deduction step by step and explains the records needed, with tables and APA references to IRS guidance. Your first TAX 650 assignment costs nothing, with delivery inside about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More TAX 650 papers and related MS Accounting samples
- TAX 650 Module 1 Discussion: Researching a Tax Question
- TAX 650 Module 2 Filing Status Assignment: Filing Status and Dependents
- TAX 650 Module 3 Gross Income Assignment: What Counts as Income
- TAX 650 Module 4 Discussion: Bees: A Hobby or a Business?
- TAX 650 Module 6 Deductions and Credits Assignment: Itemize or Not, and the Credits
- TAX 650 Module 7 Property Transactions Assignment: The Home Sale and the Stock
- TAX 650 Module 8 Discussion: A Client Who Wants to Stretch the Rules
- TAX 650 Module 9 Final Project: The Comprehensive Return and Planning Memo
- TAX 650 Module 10 Discussion: Roth or Traditional?
- MKT 635 Module 9 Discussion: Ethics in Search Marketing and Online Reviews
- QSO 625 Module 9 Final Project: The Black Belt Project Report
- MKT 625 Module 1 Discussion: Digital Strategy Versus Digital Tactics
- SPT 501 Module 7 Discussion: Who Answers a Post-Race Survey
TAX 650 Module 5 questions, answered
Where can I find a free TAX 650 Module 5 business deductions sample?
This page holds the complete TAX 650 Module 5 Schedule C, self-employment tax and QBI computation for an invented garden designer.
What was the standard mileage rate for business in 2024?
67 cents per mile for business use of a vehicle.
What is the simplified option for a home office?
It allows $5 per square foot of qualifying space, up to 300 square feet, instead of tracking actual home expenses.
How is self-employment tax calculated?
At 15.3 percent on 92.35 percent of net self-employment earnings, with the Social Security portion capped at the wage base, and half deductible.
What is the qualified business income deduction?
A pass-through owner's write-off equal to as much as one-fifth of business profit, capped by taxable income and, at higher incomes, by wage and property tests.