TAX 650 Module 10 Discussion Example

Reviewed by Portia Lambrick, MBA

This TAX 650 Module 10 Discussion sample compares traditional and Roth retirement contributions for a client, weighing current and expected future tax rates, flexibility and behavior, and recommending a mix. SNHU TAX 650 (TAX-650) closes the MS Accounting course with a planning question every individual client eventually asks. The clients are Lena and Theo Varga, an invented Raleigh couple in the 22 percent bracket with a 401(k), a SEP-IRA and room for Roth IRAs. The post explains why the best answer for them is probably not all one or the other. The answer is a mix. Each reason is explained in plain terms.

CourseTAX 650 Federal Taxation of Individuals
ModuleModule 10
Paper typegraduate discussion post comparing traditional and Roth retirement contributions for a client, weighing current and expected future tax rates, flexibility and behavior, and recommending a mix
LengthAbout 380 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Accounting
UpdatedOctober 2026

Free sample paper for TAX 650 Module 10

1

Module Ten Discussion

Pay the Tax Now or Later?

Lena and Theo Varga asked a question at the end of our meeting on their 2024 return: should their retirement savings go into Roth accounts instead? Lena defers $23,000 a year to a 401(k) that offers a Roth option, and Theo contributes to a SEP-IRA. At their income, each dollar of traditional contribution saves 22 cents of federal tax and 4.5 cents of North Carolina tax today.

What this page is doingThe question.
2

A traditional contribution is deducted now and taxed when withdrawn. A Roth contribution is taxed now, and qualified withdrawals are tax-free (Internal Revenue Service, 2024b). If tax rates were the same in both periods, the two would leave the same after-tax amount. So the choice turns on one comparison: the 26.5 percent combined rate they save today against whatever rate will apply when the money comes out. With pensions absent, two Social Security benefits and savings drawn down gradually, a lower rate is plausible, which favors traditional. But tax law changes, and their savings may grow large enough to push withdrawals into a higher bracket.

What this page is doingThe trade-off.
3

Three points push toward a mix. First, holding both kinds of accounts gives flexibility in retirement: in a high-income year, they can draw from the Roth; in a low one, from the traditional account. Second, since 2024 the owner of a Roth account inside a workplace plan no longer has to take minimum withdrawals while alive. Third, behavior matters. Beshears et al. (2017) found that when employers introduced Roth 401(k) options, employees tended to contribute similar nominal amounts, which, because Roth dollars are after-tax, means saving more in real terms. If the Vargas keep contributing the same dollar amounts to Roth accounts, they save more.

The Vargas also qualify for Roth IRAs: for 2024, the phaseout for joint filers began at $230,000 of modified adjusted gross income, well above their $163,003, so each could contribute $7,000 (Internal Revenue Service, 2024a).

What this page is doingBeyond the rates.
4

I would keep most of Lena's 401(k) deferrals traditional, since 26.5 percent is likely higher than their retirement rate, open Roth IRAs for both and fund them as cash allows and direct a modest share of new 401(k) contributions to the Roth option, building a mix.

What this page is doingMy recommendation.
5

How would you advise a client who is confident retirement income will be lower, but whose savings are growing fast?

What this page is doingFor classmates.
6

References

Beshears, J., Choi, J. J., Laibson, D., & Madrian, B. C. (2017). Does front-loading taxation increase savings? Evidence from Roth 401(k) introductions. Journal of Public Economics, 151, 84-95. https://doi.org/10.1016/j.jpubeco.2015.09.007

Internal Revenue Service. (2024a). Contributions to individual retirement arrangements (IRAs) (Publication 590-A). U.S. Department of the Treasury.

Internal Revenue Service. (2024b). Distributions from individual retirement arrangements (IRAs) (Publication 590-B). U.S. Department of the Treasury.

What the TAX 650 Module 10 instructions ask for

The final TAX 650 discussion often asks students to apply individual tax concepts to a planning question, such as retirement saving, education funding or the timing of income and deductions, and sometimes ask for a short look back at the course. Plan to compare alternatives for a client using tax rules and reasoning. Strong posts compare options using the client's actual marginal rates, explain eligibility and limits for the year, consider uncertainty about future rates, add non-tax factors such as flexibility, required distributions and saving behavior, and recommend a course with reasons. They acknowledge what cannot be known. Replies should challenge classmates' assumptions about future tax rates and client behavior. Limits should match the year.

How this TAX 650 Module 10 discussion example is built

The post advises Lena and Theo Varga, a fictional Raleigh couple, on traditional versus Roth retirement saving. Lena defers $23,000 to a 401(k) with a Roth option and Theo funds a SEP-IRA; they face a 22 percent federal rate plus North Carolina's 4.5 percent, and their income lets each contribute $7,000 to a Roth IRA. The trade-off, a deduction now against tax-free withdrawals later, turns on future rates, plus the value of holding both account types, the absence of Roth required distributions and research suggesting Roth savers often keep the same nominal contribution. The writer recommends mostly traditional 401(k) deferrals plus Roth IRAs. IRS Publications 590-A and 590-B and Beshears and colleagues are cited. A mix is recommended.

Where the TAX 650 Module 10 rubric puts the points

For the closing TAX 650 thread, instructors typically credit a comparison based on the client's actual marginal rates, correct eligibility and limits for the year, honest treatment of uncertainty about future rates, attention to non-tax factors, a reasoned recommendation and replies that test classmates' assumptions. Posts score well when they turn a general debate into advice for one client. They lose points for assuming future rates without reasoning, for ignoring eligibility limits, for treating one option as always better or for no citations. APA references and a clear recommendation complete the grade, along with a brief note on what the course changed. Clear reasons matter.

TAX 650 Module 10 help: the mistakes that cost points

Find the client's marginal rate today, federal and state. Estimate, with reasons, what it might be in retirement, and admit the uncertainty. Check eligibility: income limits for Roth IRAs, plan options at work, contribution limits. Compare the after-tax result of each choice at different future rates. Then add what the numbers miss: flexibility from having both kinds of accounts, required distributions and how the choice might change how much the client saves. Recommend a mix if that fits. Posts often declare Roth or traditional the winner; the stronger ones explain why this client should split the difference. Then revisit it each year.

Get TAX 650 Module 10 written to your instructions

Paste the TAX 650 Module 10 prompt and describe your client's situation. A writer compares the options with the client's current and expected tax rates, explains eligibility and limits, adds flexibility and behavioral considerations, recommends a course and closes by inviting classmates to test the advice, with APA citations. The first TAX 650 post is free, usually within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More TAX 650 papers and related MS Accounting samples

TAX 650 Module 10 questions, answered

Where can I find a free TAX 650 Module 10 Discussion sample?

The full TAX 650 Module 10 post on Roth versus traditional saving for an invented Raleigh couple is on this page.

What is the main difference between Roth and traditional retirement accounts?

Traditional contributions are deducted now and taxed when withdrawn; Roth contributions are taxed now and qualified withdrawals are tax-free.

When is a Roth contribution better?

Generally when the saver expects a higher tax rate in retirement than today, or values tax-free flexibility later.

Could a married couple contribute to a Roth IRA in 2024 with $163,000 of income?

Yes; the 2024 phaseout for joint filers began at $230,000 of modified adjusted gross income.

Do Roth 401(k) accounts have required minimum distributions?

Not anymore for the original owner; starting in 2024, Roth money in workplace plans can stay invested for life.