SPT 608 Module 2 Fan Research Assignment Example

Reviewed by Portia Lambrick, MBA

This SPT 608 Module 2 Fan Research Assignment sample conducts sport consumer research, designs a fan survey, analyzes results and segments fans by motivation and connection to guide marketing decisions. SNHU SPT 608 (SPT-608) asks MS Sport Management students to base marketing decisions on evidence about real fans rather than assumptions. The organization is the Kaw Valley Dredgers, an invented independent baseball team in Topeka. Ticketing data, a fan survey and a short survey of people who have never attended reveal four segments, and they show that most non-attenders simply do not know when the team plays or what it costs.

CourseSPT 608 Sport Marketing and Media
ModuleModule 2
Paper typegraduate assignment conducting sport consumer research, designing a fan survey, analyzing results and segmenting fans by motivation and connection to guide marketing decisions
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Sport Management
UpdatedOctober 2026

Free sample paper for SPT 608 Module 2

1

Who Comes and Why: Fan Research for the Kaw Valley Dredgers

[Student Name]

Southern New Hampshire University

SPT 608: Sport Marketing and Media

Fan Research Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe Kaw Valley Dredgers, their fans and all survey results are invented for this SPT 608 assignment.
2

Who Comes and Why: Fan Research for the Kaw Valley Dredgers

Introduction

The Kaw Valley Dredgers average about 2,100 fans a game in a 4,200-seat ballpark. To fill more seats, the club needs to know who comes, why they come, what would bring them back more often and why most of Topeka stays away. This paper describes research combining ticketing data, a fan survey and a survey of residents who have never attended, presents four fan segments and sets out what they mean for marketing.

What this page is doingStates the research purpose.
3

Research Design

Three sources were used. Ticketing records for the last two seasons covered about 31,000 individual buyers, showing frequency, ticket types, spending and ZIP codes. An online survey was sent to all buyers with an email address and answered by 1,140, a 9 percent response rate. It measured motives for attending, using items on socializing, family time, entertainment, interest in baseball and local pride, and each respondent's stage of connection to the club. And a short intercept survey of 260 adults at a Topeka shopping center and the city's farmers market reached residents who had never attended.

Funk and James (2001) describe fans' connection as moving through awareness, attraction, attachment and allegiance. The survey placed respondents in a stage using questions on how much the club mattered to them and whether they would keep attending after a poor season.

What this page is doingDescribes methods.
4

Fan Segments

Analysis of motives, attachment and purchase behavior produced four segments.

Four fan segments

SegmentShare of buyersMain motivesAttachment stageAverage games a seasonAverage spend per visit
Young families34%Affordable family night, children's activitiesAttraction3$54 per group
Social groups27%Friends, drink rail, atmosphereAttraction4$38 per person
Baseball loyalists14%Players, standings, the game itselfAttachment to allegiance14$24 per person
Civic boosters25%Pride in Topeka's revival, the riverfrontAttachment6$31 per person

Hunt et al. (1999) proposed classifying fans by the strength and basis of their identification, from temporary fans drawn by an event to devoted fans whose identity is tied to the team. The Dredgers' segments fit that idea: loyalists are close to devoted fans, while families and social groups attend mainly for the evening rather than the team and could easily choose another evening out.

Gladden and Funk (2002) found that fans hold many associations with teams beyond the sport itself, including the venue, socializing and escape. Those associations explain the families and social groups, who described the Dredgers as "something to do" rather than "our team."

What this page is doingPresents the segments.
5

Value of Each Segment

Estimated annual revenue by segment

SegmentBuyersAnnual revenueShare of ticket and in-park revenue
Young families10,500$570,00031%
Social groups8,400$510,00028%
Baseball loyalists4,300$380,00021%
Civic boosters7,800$370,00020%

Families and social groups bring most of the revenue but attend few games and sit at the attraction stage, where a better offer elsewhere can pull them away. The ticketing data show how fragile their attendance is: about 58 percent of family buyers last season attended only once, and the share returning from the previous season was 36 percent. Social groups returned at a slightly higher rate but concentrated their visits on Friday and Saturday nights, leaving weeknight crowds thin. Loyalists, by contrast, returned at 81 percent and spread their attendance across the week. Loyalists are small in number but steady. Boosters care about Topeka more than baseball, a connection the club has barely used.

What this page is doingSizes and values segments.
6

Non-Attenders

Why residents have not attended

ReasonShare citing it
Did not know when games were played46%
Assumed tickets were expensive38%
Not interested in baseball29%
No one to go with21%
Parking or getting there14%

Fewer than a third of non-attenders said they were not interested in baseball. Most named problems marketing can fix: they did not know the schedule and thought tickets cost more than the $9 general admission price. When told the price, 44 percent of non-attenders said they would consider going to a game. Their guesses averaged $22, more than double the actual figure, which suggests that the club's advertising, built around promotions, never mentions what a ticket costs. Many also assumed the team played on weekends only.

What this page is doingReports why people stay away.
7

Marketing Implications

Implications by segment

SegmentWhat they needMarketing response
Young familiesAffordable, easy evenings with something for childrenFamily four-packs, Sunday kids' activities, school and youth league channels
Social groupsA lively place to meet friendsGroup packages, drink rail nights, social media and local bar partnerships
Baseball loyalistsInformation and access to playersPlayer content, standings updates, mini-plans, player meet-and-greets
Civic boostersA way to show pride in TopekaHometown brand themes, local business nights, riverfront events
Non-attendersAwareness of schedule and priceSchedule magnets, radio and outdoor ads stating the $9 price

Moving families and social groups from attraction toward attachment would raise frequency, so the plan should reward second and third visits, not only first ones. A family that attends three times a season instead of once adds about $108 in revenue, and across 10,500 family buyers even a modest shift would add more than a new promotion night. Civic boosters, meanwhile, could be reached through Topeka organizations they already support, from neighborhood associations to the riverfront development group.

What this page is doingTurns findings into actions.
8

Limitations

The survey response rate was 9 percent, and loyal fans were likely overrepresented; ticketing data, which cover all buyers, were used to size segments to correct for this. The intercept survey was a convenience sample at two locations and may not represent all of Topeka; people at a farmers market on a Saturday morning may be more likely than average to enjoy outdoor community events. Motives were self-reported, and segments were formed by analysis that involved judgment.

What this page is doingStates the limits.
9

Conclusion

The Dredgers serve four distinct groups: families and social groups who bring most of the money but little loyalty, a small core of baseball loyalists and civic boosters whose attachment is to Topeka as much as to baseball. Most non-attenders are not opposed to baseball; they do not know when the team plays or what it costs. Marketing that speaks to each segment and simply tells Topeka the schedule and the price could add more fans than any new promotion.

What this page is doingSummarizes the research.
10

References

Funk, D. C., & James, J. (2001). The psychological continuum model: A conceptual framework for understanding an individual's psychological connection to sport. Sport Management Review, 4(2), 119-150. https://doi.org/10.1016/S1441-3523(01)70072-1

Gladden, J. M., & Funk, D. C. (2002). Developing an understanding of brand associations in team sport: Empirical evidence from consumers of professional sport. Journal of Sport Management, 16(1), 54-81. https://doi.org/10.1123/jsm.16.1.54

Hunt, K. A., Bristol, T., & Bashaw, R. E. (1999). A conceptual approach to classifying sports fans. Journal of Services Marketing, 13(6), 439-452. https://doi.org/10.1108/08876049910298720

What the SPT 608 Module 2 instructions ask for

The SPT 608 fan research assignment commonly asks students to study sport consumers, through surveys, existing data or secondary research, and to segment them for marketing purposes. Expect to explain research methods, present findings and recommend how to target segments. Strong papers combine sources, such as purchase records and surveys, measure motives and levels of attachment rather than demographics alone, include people who do not yet attend, build segments that differ in ways marketing can act on and size each segment by its value. They are honest about the limits of their samples and methods. Each segment should end with a clear implication for product, price, promotion or channel. Limits should be stated.

How this SPT 608 Module 2 fan research assignment example is built

The assignment reports fan research for the Kaw Valley Dredgers, a fictional independent baseball team in Topeka, Kansas, combining ticketing data on 31,000 buyers, a survey of 1,140 fans and an intercept survey of 260 residents who have never attended. Motives and attachment stages are measured, and four segments emerge: young families, social groups, baseball loyalists and civic boosters, differing in frequency, spending and channels. Non-attenders cite not knowing the schedule and assuming high prices more than disliking baseball. Implications are set for each segment, and limits such as casual fans' non-response are noted. Funk and James, Hunt and colleagues and Gladden and Funk are cited. Implications follow each segment.

Where the SPT 608 Module 2 rubric puts the points

Grading on the SPT 608 fan research paper typically credits a sound research design, use of more than one source, measures of motivation and attachment, inclusion of non-attenders, segments that are distinct and actionable, sizes and values for each segment, clear marketing implications and honest limitations. Papers stand out when segments lead directly to different marketing actions. They lose points for segmenting by demographics alone, for surveys of only the most loyal fans, for findings without implications or for no research support. Tables, APA references and a short appendix of survey items are also expected. Sizes and values for each segment strengthen it. Honest limits help.

SPT 608 Module 2 help: the mistakes that cost points

Start with what you already have, such as ticket purchase records, which show who buys, how often and what they spend. Add a survey that asks why people come and how attached they feel, using established ideas such as stages of connection. Ask people who do not attend, too, since they are where growth lies. Look for groups that differ in motives and behavior, not only in age. Size each group and estimate its value. Then say what each group needs from marketing. Papers often describe fans in general; the stronger ones show four or five groups so different that one message could not reach them all. Then test the segments with staff.

Get SPT 608 Module 2 written to your instructions

Share the SPT 608 Module 2 instructions and the fans or market you need to understand. A writer designs the research, combines purchase data with surveys, analyzes motives and attachment, builds segments with sizes and value and turns the findings into marketing implications, with tables and APA references to sport consumer research. The first SPT 608 assignment costs nothing, with a typical two-day turnaround. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More SPT 608 papers and related MS Sport Management samples

SPT 608 Module 2 questions, answered

Where can I find a free SPT 608 Module 2 fan research sample?

This page holds the full SPT 608 Module 2 fan research and segmentation for an invented Topeka ballclub.

How should sport fans be segmented?

By motives, attachment and behavior, such as frequency and spending, rather than by demographics alone.

Why survey people who do not attend?

Because they represent growth, and their reasons for staying away, such as not knowing the schedule, are often fixable.

What is the psychological continuum model?

A model describing fans' connection to a sport or team in four stages: awareness, attraction, attachment and allegiance.

What are the limits of fan surveys?

Loyal fans answer more often than casual ones, so results may overstate attachment unless checked against purchase data.