SPT 700 Module 9 Final Project Example

Reviewed by Portia Lambrick, MBA

This SPT 700 Module 9 Final Project sample presents a complete graduate capstone report bringing together the problem, literature, situation analysis, data analysis, options, recommendation, implementation plan, budget, evaluation, ethics and limitations for a sport organization. SNHU SPT 700 (SPT-700) ends the MS Sport Management degree with this report. The organization is the Gateway Officials Association, an invented St. Louis nonprofit that loses nearly half its new referees within two seasons. The evidence points to support rather than pay, and the report recommends a plan the association can fund and start this fall. Limitations are stated plainly. Every recommendation traces to a finding.

CourseSPT 700 Sport Management Capstone
ModuleModule 9
Paper typegraduate capstone report bringing together the problem, literature, situation analysis, data analysis, options, recommendation, implementation plan, budget, evaluation, ethics and limitations for a sport organization
LengthAbout 1,030 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Sport Management
UpdatedOctober 2026

Free sample paper for SPT 700 Module 9

1

Keeping the Whistle: A Capstone Report on New Official Retention at the Gateway Officials Association

[Student Name]

Southern New Hampshire University

SPT 700: Sport Management Capstone

Final Project

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe Gateway Officials Association and all data, people and figures in this SPT 700 capstone are invented.
2

Keeping the Whistle: A Capstone Report on New Official Retention at the Gateway Officials Association

Executive Summary

The Gateway Officials Association loses 46 percent of its new officials within two seasons, costing about $70,000 a year in replacement and contributing to 140 rescheduled games last fall. Records, a survey and interviews show that new officials leave mainly because of abuse and a lack of support, not pay, and that the officials who shared their first games with a veteran were far less likely to quit. This report recommends structured mentoring, a 48-hour response to every abuse report, published advancement criteria and a carefully safeguarded youth officials pilot, at about $156,000 a year, paid for by member schools through a $3 fee, plus outside grant money for the first two years. It aims to cut early attrition from 46 to 30 percent in one year and to halve rescheduled games.

What this page is doingSummarizes the report.
3

The Problem

About 140 officials join Gateway each year, yet its total has fallen from about 1,510 to 1,150 in five years, with an average age of 53. Recruitment has held steady; retention has not. Of 420 officials recruited in the last three seasons, 35 percent left after their first season and 46 percent within two. Each departure wastes about $1,100 in recruiting and training, and the shortage disrupts schools and leagues.

What this page is doingStates the problem.
4

Organizational Context

Gateway assigns games fairly, keeps a deep bench of veterans and holds on to its member schools, funded by about $610,000 in fees and dues. Its weaknesses lie in the first seasons: no structured mentoring, little feedback, no published path to better games and no follow-up when officials report abuse. Newcomers are sent mostly to youth and junior varsity contests, the games with the worst sideline behavior, while competing part-time jobs and fees that lag inflation pull them away.

What this page is doingSummarizes the situation analysis.
5

What Research Says

Warner et al. (2013) found that former referees left because of poor treatment and a lack of support and community, and argued that officials should be developed as deliberately as athletes. Supportive peers helped umpires ride out abuse in the study by Kellett and Shilbury (2007), and the Canadian survey by Livingston and Forbes (2016) tied staying to the backing officials felt from their organization. Hancock et al. (2015) found that officials' reasons for continuing differ from their reasons for starting, shifting toward growth and connection. Planned volunteer practices went with better retention in the club survey by Cuskelly et al. (2006).

What this page is doingIntegrates the literature.
6

Findings

Key findings

FindingEvidence
The first season is the danger pointOver a third of recruits do not return for year two
Assignments matterOfficials with mostly youth and junior varsity games left at 53%; with some varsity, 31%
Shared early games with veterans24% versus 55% gone within two seasons
Feedback matters29% left after a written evaluation; 52% without
Unanswered abuse precedes departures68% left after a report with no follow-up
Abuse and support outrank payExit survey ratings: abuse 4.1, lack of support 3.8, pay 2.9

Interviews explained the numbers. Officials who stayed almost all named a veteran who called after games or worked alongside them; those who left described a first abusive game, alone, followed by silence. These findings are associations rather than proof, but records, survey and interviews agree.

What this page is doingReports the evidence.
7

Options and Recommendation

Four options were scored on effect, cost, feasibility, stakeholder support and risk: structured mentoring, an abuse response system, a development and pay ladder and a youth recruitment pathway. The recommended package combines mentoring and abuse response as its core, adds published advancement criteria without a fee supplement and pilots one youth cohort of 20 basketball officials. Allen et al. (2010) argued that retention strategies work best when aimed at the specific causes an organization identifies; this package targets the two strongest causes in Gateway's data.

What this page is doingCompares and chooses.
8

Implementation

Budget and funding

ItemAnnual amount
Mentoring, stipends, shared game fees and training$96,000
Part-time support coordinator for 48-hour follow-up$28,000
Advancement criteria and reviews$12,000
Youth cohort pilot with safeguarding$20,000
Total cost$156,000
$3 assigning fee increase$95,000
Regional sports foundation grant$40,000
State association development fund$21,000
Total funding$156,000

The board approves the plan in March, mentors are recruited and trained in the summer and the program launches with the fall season, with a mid-year review in December and a full evaluation after one year. The executive director owns the plan; the training coordinator leads mentoring; the new support coordinator leads abuse follow-up; assignors schedule mentored games.

What this page is doingPlans, funds and schedules.
9

Ethics

The youth pilot places minors in settings where adults are abused. Mountjoy et al. (2016) describe verbal and psychological abuse as forms of harm sport organizations must prevent. The pilot will proceed only with safeguards: games only with players at least three years younger, officials in pairs with an adult mentor present, zero tolerance under which abuse of a youth official ends the game, trained mentors, parental consent, limited hours and a named safeguarding lead. Leagues that do not agree will not take part.

What this page is doingAddresses risks to young officials.
10

Evaluation

Evaluation measures

MeasureBaselineOne-year target
Recruits lost after season one35%18% or less
Recruits lost within two seasons46%30% or less
Share of abuse reports answered inside two daysUnknown95%
Newcomers who say they feel supportedUnknown7 in 10
Games moved for lack of officials140Fewer than 80

The first mentored cohort will be compared with the three previous cohorts using the same records, with a second comparison by the number of mentored games each official received.

What this page is doingDefines how results will be judged.
11

Limitations

The findings show associations, not causes; veterans may choose promising officials to work with. Only about half of former officials answered the exit survey. The study covers one association, and results may differ elsewhere. The capstone author leads the association, which is why interviews were conducted by an outside graduate student. The fee increase depends on a member vote, and the plan's long-term funding depends on it.

What this page is doingStates the limits.
12

Conclusion

Gateway does not mainly have a recruiting problem; it has a first-season problem. New officials leave after facing abuse alone and hearing nothing from the association. Mentoring, a fast response to abuse, a clear path forward and a carefully protected youth pilot respond directly to what the evidence shows, and they can be funded, staffed and measured starting this fall.

What this page is doingCloses the report.
13

References

Allen, D. G., Bryant, P. C., & Vardaman, J. M. (2010). Retaining talent: Replacing misconceptions with evidence-based strategies. Academy of Management Perspectives, 24(2), 48-64. https://doi.org/10.5465/amp.2010.51827775

Cuskelly, G., Taylor, T., Hoye, R., & Darcy, S. (2006). Volunteer management practices and volunteer retention: A human resource management approach. Sport Management Review, 9(2), 141-163. https://doi.org/10.1016/S1441-3523(06)70023-7

Hancock, D. J., Dawson, D. J., & Auger, D. (2015). Why ref? Understanding sport officials' motivations to begin, continue, and quit. Movement & Sport Sciences, 87(1), 31-39. https://doi.org/10.3917/sm.087.0031

Kellett, P., & Shilbury, D. (2007). Umpire participation: Is abuse really the issue? Sport Management Review, 10(3), 209-229. https://doi.org/10.1016/S1441-3523(07)70012-8

Livingston, L. A., & Forbes, S. L. (2016). Factors contributing to the retention of Canadian amateur sport officials: Motivations, perceived organizational support, and resilience. International Journal of Sports Science & Coaching, 11(3), 342-355. https://doi.org/10.1177/1747954116644061

Mountjoy, M., Brackenridge, C., Arrington, M., Blauwet, C., Carska-Sheppard, A., Fasting, K., Kirby, S., Leahy, T., Marks, S., Martin, K., Starr, K., Tiivas, A., & Budgett, R. (2016). International Olympic Committee consensus statement: Harassment and abuse (non-accidental violence) in sport. British Journal of Sports Medicine, 50(17), 1019-1029. https://doi.org/10.1136/bjsports-2016-096121

Warner, S., Tingle, J. K., & Kellett, P. (2013). Officiating attrition: The experiences of former referees via a sport development lens. Journal of Sport Management, 27(4), 316-328. https://doi.org/10.1123/jsm.27.4.316

What the SPT 700 Module 9 instructions ask for

For the SPT 700 final project, students normally hand in the full capstone report, integrating and revising the work of earlier milestones into a professional document for the organization. Expect an executive summary and sections on the problem, literature, organizational analysis, methods and findings, options and recommendation, implementation and evaluation, and limitations. Strong reports are consistent from start to finish, so the recommendation follows from the findings and the implementation plan funds and measures exactly what is recommended. They revise earlier milestones in light of later evidence, address ethics where the recommendation affects vulnerable people and state limitations honestly. The report should be one an organization's board could act on.

How this SPT 700 Module 9 final project example is built

The final project presents the capstone report for the Gateway Officials Association, a fictional St. Louis nonprofit assigning about 1,150 officials. Of new officials, 46 percent leave within two seasons, costing about $70,000 a year and contributing to 140 rescheduled games. Records on 420 recruits, an exit survey and 18 interviews show that officials who worked early games beside veterans left at 24 percent against 55 percent and that unanswered abuse reports preceded the highest departures. Mentoring, 48-hour abuse response, advancement criteria and a safeguarded youth pilot are recommended at about $156,000, funded by a fee increase, a grant and a state fund, with measures, evaluation, ethics and limitations. Warner and colleagues, Kellett and Shilbury and five other sources are cited.

Where the SPT 700 Module 9 rubric puts the points

The SPT 700 final project rubric typically credits a clear executive summary, a well-supported problem, integrated literature, sound methods and findings, options compared fairly, a recommendation that follows from the evidence, a funded and scheduled implementation plan, a credible evaluation, attention to ethics and honest limitations, all consistent across sections. The highest marks go to reports a board could approve as written. Marks are lost for earlier milestones dropped in unrevised, recommendations that outrun the evidence, plans without funding or measures or missing limitations. Tables, APA references and professional writing complete the grade. An executive summary that stands alone for busy board members adds credit.

SPT 700 Module 9 help: the mistakes that cost points

Read your milestones in order and ask whether each still fits what you learned later; revise anything the data contradicted. Leave the executive summary until everything else is finished, and write it in plain language for a board. Make sure every recommendation traces to a finding, every activity has money and an owner and every outcome has a measure. Address any ethical risks your recommendation creates. State the limits of your evidence plainly. Then read the report as a skeptical board member would. A report that feels like five assignments taped together will not persuade a board; one continuous argument will. Then check every number appears the same way throughout.

Get SPT 700 Module 9 written to your instructions

Send the SPT 700 Module 9 requirements together with your milestone drafts. A writer revises and combines them into one capstone report, making sure the findings, recommendation, budget and measures agree everywhere they appear, with APA references throughout. We draft your first SPT 700 final project free, in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More SPT 700 papers and related MS Sport Management samples

SPT 700 Module 9 questions, answered

Where can I find a free SPT 700 Module 9 final project sample?

The complete SPT 700 Module 9 capstone report on referee retention for an invented St. Louis association is on this page.

What sections does a sport management capstone report include?

An executive summary, problem, literature, organizational analysis, methods and findings, options and recommendation, implementation, evaluation, ethics and limitations.

Should a final capstone revise earlier milestones?

Yes; later evidence often changes the problem's framing or options, and the final report should be consistent with what was learned.

Why include limitations in a capstone report?

They show readers how much confidence to place in the findings and where further evidence is needed.

What makes a capstone recommendation credible?

It follows from the evidence, is funded and scheduled, has named owners and includes measures that can show whether it worked.