SPT 700 Module 5 Milestone Two Example

Reviewed by Portia Lambrick, MBA

This SPT 700 Module 5 Milestone Two sample analyzes organizational data and survey results to answer capstone research questions, identifying where and why a problem occurs and drawing implications for solutions. SNHU SPT 700 (SPT-700) asks MS Sport Management students to let evidence, not assumptions, shape their recommendations. The data come from the Gateway Officials Association, an invented St. Louis nonprofit that loses nearly half its new referees within two seasons. Officials who worked early games beside a veteran left at less than half the rate of those who did not. The paper explains what that does and does not prove.

CourseSPT 700 Sport Management Capstone
ModuleModule 5
Paper typegraduate capstone milestone analyzing organizational data and survey results to answer research questions, identifying where and why a problem occurs and drawing implications for solutions
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Sport Management
UpdatedOctober 2026

Free sample paper for SPT 700 Module 5

1

Where the Pipeline Leaks: Recruitment and Attrition Data at the Gateway Officials Association

[Student Name]

Southern New Hampshire University

SPT 700: Sport Management Capstone

Milestone Two

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe Gateway Officials Association, its officials, records and survey results are invented for this SPT 700 milestone.
2

Where the Pipeline Leaks: Recruitment and Attrition Data at the Gateway Officials Association

Introduction

This milestone analyzes the data gathered for the Gateway Officials Association capstone to answer three research questions: when new officials leave, why they leave or stay and which association practices are associated with staying. It draws on association records for 420 officials recruited over the last three seasons, an exit survey of former officials and the 18 interviews reported earlier.

What this page is doingStates the purpose.
3

When Officials Leave

Retention of officials recruited in the last three seasons

PointOfficials remainingShare of recruits
Recruited420100%
After first season27465%
After second season22754%

Most losses come after the first season: 35 percent of recruits do not return for a second year, and a further 11 percent leave after the second. The timing points to the first season as the period where intervention matters most. An official who returns for a second season is far more likely to stay for a third, so effort spent in the first months has the largest payoff. The pattern differs by assignment. Officials whose first-season games were at least 80 percent youth and junior varsity left within two seasons at 53 percent; those with a mix including some varsity games left at 31 percent. Differences by sport were smaller, though basketball and soccer, the sports with the most sideline incidents, had higher losses than volleyball and softball. Age mattered less than expected: officials under 30 and over 50 left at similar rates, so what happens in the first season seems to matter more than who is recruited.

What this page is doingAnswers research question 1.
4

Which Practices Matter

Departure within two seasons by early experience

Experience in first seasonOfficialsLeft within two seasons
Worked 3 or more of first 10 games with a veteran11824%
Did not30255%
Received a written evaluation10429%
Did not31652%
Filed an abuse report with no follow-up5968%
Filed no report36142%

The differences are large, and they hold across sports. In basketball, the sport with the most incidents, mentored officials left at 27 percent against 61 percent for others; in volleyball the gap was smaller but in the same direction. Officials who both worked with veterans and received written feedback left at only 19 percent. New officials who worked early games alongside veterans left at less than half the rate of those who did not. Written feedback was associated with a similar gap. Officials whose abuse reports went unanswered left at the highest rate of any group.

What this page is doingAnswers research question 3.
5

Why They Leave or Stay

An exit survey sent to 194 former officials drew 104 responses. Respondents rated the importance of each reason on a five-point scale.

Exit survey, average importance of reasons for leaving

ReasonAverage rating
Abuse from coaches, parents or players4.1
Lack of support from the association3.8
No clear path to better games3.4
Time demands and scheduling3.1
Pay2.9
Other job or family commitments2.7

The survey agrees with the interviews: abuse and lack of support rank above pay. Open comments added detail. Several respondents wrote that they would have stayed if someone had called after their worst game, and a few said they learned they had been reported by a coach only when they saw their assignments disappear, with no explanation. Warner et al. (2013) reported the same pattern among former referees, and the Gateway data add something their interviews could not: a measure of how much early support is associated with staying.

What this page is doingAnswers research question 2.
6

Association, Not Proof

These comparisons show associations, not causes. Veterans may choose to work with new officials who already seem capable, and those officials might have stayed anyway. Officials who file reports may be those most bothered by abuse. The exit survey reached about half of former officials, and those with stronger feelings may have been more likely to answer. Still, the pattern is consistent across records, surveys and interviews, and with research. Cuskelly et al. (2006) found that management practices such as support and recognition were associated with volunteer retention, and Allen et al. (2010) argued that retention efforts work best when they target the specific causes of turnover an organization can identify, which these data now allow.

What this page is doingStates the limits.
7

Interviews and Numbers Together

The records and the interviews tell the same story from two directions. According to the records, pairing with veterans early went with staying; the interviews explain what those veterans did, a phone call after a hard game, a word of advice at halftime, a recommendation for a better assignment. The records show that unanswered abuse reports came before departures; the interviews describe what silence felt like to the official who filed them. When two kinds of evidence agree, the conclusions are stronger than either could support alone, and the agreement here is strong enough to guide the options that follow.

What this page is doingIntegrates the evidence.
8

Implications

Three implications follow. First, the first season is decisive, so any intervention must begin before and during it. Second, structured contact with veterans and written feedback are the practices most strongly associated with staying, and both are within the association's control. Third, unanswered abuse reports are associated with the highest departures, so the association's response to abuse matters as much as the abuse itself. Pay, by contrast, sits lower in both the survey and the interviews; it may still matter for recruitment and for officials weighing other jobs, but the evidence does not support making it the first priority for keeping new officials.

If early attrition fell from 46 percent to 23 percent, Gateway would retain about 30 more officials a year from the same recruiting effort. At about $1,100 per recruit, that would save about $33,000 a year in replacement costs, and within five years would add about 150 officials, enough to cover most of the games now rescheduled.

What this page is doingDraws conclusions for options.
9

Conclusion

Gateway loses most new officials after their first season, especially those assigned only to the region's most difficult games. Early work alongside veterans, written feedback and a response to abuse reports are each associated with much lower attrition, and former officials rank abuse and lack of support above pay. Though the data show associations rather than proof, they point clearly toward the options the next assignment will compare.

What this page is doingSummarizes the findings.
10

References

Allen, D. G., Bryant, P. C., & Vardaman, J. M. (2010). Retaining talent: Replacing misconceptions with evidence-based strategies. Academy of Management Perspectives, 24(2), 48-64. https://doi.org/10.5465/amp.2010.51827775

Cuskelly, G., Taylor, T., Hoye, R., & Darcy, S. (2006). Volunteer management practices and volunteer retention: A human resource management approach. Sport Management Review, 9(2), 141-163. https://doi.org/10.1016/S1441-3523(06)70023-7

Warner, S., Tingle, J. K., & Kellett, P. (2013). Officiating attrition: The experiences of former referees via a sport development lens. Journal of Sport Management, 27(4), 316-328. https://doi.org/10.1123/jsm.27.4.316

What the SPT 700 Module 5 instructions ask for

The SPT 700 second milestone typically asks students to analyze the data they have gathered for the capstone and present findings that answer their research questions. Expect to analyze organizational records, surveys or interviews and to interpret the results. Strong milestones organize findings by research question, present data clearly in tables, compare groups fairly, distinguish associations from causes, connect quantitative findings to qualitative ones, compare results with research and draw implications that point toward options. They state the limits of the data honestly. The analysis should make the later recommendations look inevitable rather than chosen in advance. Each finding should connect back to a research question. Limits belong in the text.

How this SPT 700 Module 5 milestone two example is built

The milestone analyzes data for the Gateway Officials Association, a fictional St. Louis nonprofit. Records on 420 recruits show 46 percent leaving within two seasons, mostly after season one and among those assigned youth and junior varsity games. Officials who worked three of their first ten games beside a veteran left at 24 percent against 55 percent; those whose abuse reports went unanswered left at 68 percent; those evaluated in their first season left at 29 percent against 52 percent. An exit survey of 104 ranks abuse, lack of support and no advancement above pay. Associations are not proof, but the pattern fits interviews and research; halving attrition would add about 30 officials a year. Warner and colleagues, Cuskelly and colleagues and Allen and colleagues are cited.

Where the SPT 700 Module 5 rubric puts the points

Grading on SPT 700 Milestone Two usually rewards findings organized by research question, clear tables, fair comparisons, care in distinguishing association from causation, integration of quantitative and qualitative evidence, comparison with research, honest limitations and implications that point toward options. Milestones stand out when the evidence clearly narrows the possible solutions. They lose points for tables of numbers left unexplained, for claiming causes from simple comparisons, for ignoring inconvenient findings or for no link to the research questions. Tables, APA references and precise language complete the grade. Instructors also look for an estimate of what solving the problem would be worth.

SPT 700 Module 5 help: the mistakes that cost points

Take each research question in turn and show the data that answer it. Use simple tables and compare groups that are as alike as possible. Ask whether a difference could have another explanation, such as stronger officials attracting mentors, and say so. Bring in what interviews and surveys said, since numbers show where and words show why. Compare your results with published research. Then say what the findings imply: which practices seem to matter most and how big the gain could be. Milestones often present many numbers; the stronger ones make a few numbers impossible to ignore. Finish with a value estimate.

Get SPT 700 Module 5 written to your instructions

Share the SPT 700 Milestone Two guidelines and your capstone data. A writer analyzes records and survey results against your research questions, presents findings in clear tables, interprets them with care about causation, connects them to interviews and research and draws implications for solutions, with APA references. We write the first SPT 700 milestone free, usually inside two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More SPT 700 papers and related MS Sport Management samples

SPT 700 Module 5 questions, answered

Where can I find a free SPT 700 Module 5 Milestone Two sample?

This page holds the complete SPT 700 Module 5 attrition analysis for an invented St. Louis officials association.

How should capstone data be organized?

By research question, with clear tables, fair comparisons and interpretation that connects numbers to interviews and research.

How does association differ from causation?

Association means two things occur together; causation means one produces the other, which simple comparisons cannot prove.

Why combine records with surveys and interviews?

Records show when and where a problem occurs; surveys and interviews explain why, and agreement between them strengthens conclusions.

How can a capstone estimate the value of solving a problem?

By projecting the change in outcomes, such as officials retained, and converting it into costs saved or capacity gained.