This QSO 600 Module 5 Inventory Assignment sample applies order quantity and safety stock models to a replenishment decision and shows how lead-time variability and losses drive inventory cost. SNHU QSO 600 (QSO-600) assigns inventory management in Module 5 of its MS Operations Management core course. The inventory is the rental linen pool of Fallowmere Linen Services, an invented commercial laundry that owns its hotel customers' sheets and towels and replaces nearly a third of them every year. The paper sizes orders and safety stock for one item, finds that an unreliable supplier, not demand, drives most of the buffer and prices the larger prize of stopping the losses.

CourseQSO 600 Operations Management
ModuleModule 5
Paper typegraduate assignment applying order quantity and safety stock models to a replenishment decision and showing how lead-time variability and losses drive inventory cost
LengthAbout 1,100 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 600 Module 5

1

Twenty Thousand Sheets per Container: Ordering and Protecting Fallowmere's Linen Pool

[Student Name]

Southern New Hampshire University

QSO 600: Operations Management

Inventory Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe pool, costs and lead times at Fallowmere Linen Services in this QSO 600 assignment are invented.
2

Twenty Thousand Sheets per Container: Ordering and Protecting Fallowmere's Linen Pool

Introduction

Fallowmere Linen Services rents sheets, pillowcases, towels and bath mats to about 120 hotels. It owns the linen, about 1.9 million pieces in circulation at any time, and replaces pieces as they wear out or disappear. Replacement purchases have grown to about $5.8 million a year, the company's largest cost after labor. This assignment sets an ordering and safety stock policy for the highest-volume item, king flat sheets, and then looks at why the pool needs so much replacement in the first place.

What this page is doingStates the problem.
3

Demand and Costs

King sheets are bought from a mill overseas in container loads. Over the past two years, Fallowmere has needed about 186,000 new king sheets a year, about 3,580 a week, and weekly needs have typically strayed from that by around 700 sheets, one standard deviation. Placing, inspecting, clearing through customs and receiving a single order runs about $1,800. A sheet lands in the Indianapolis warehouse at about $7.40. Keeping it there for a year ties up cash, takes rack space, needs handling and exposes it to water stains and pests; the finance team puts the yearly carrying charge at 22 percent of cost, about $1.63 a sheet. The mill quotes 12 weeks from order to dock, but across the last ten orders deliveries took anywhere from 8 to 18 weeks, a standard deviation of roughly three weeks.

What this page is doingEstablishes the inputs.
4

Order Quantity

Balancing the $1,800 cost of each order against the $1.63 a year it costs to keep each sheet on the shelf gives an economic order quantity of about 20,300 sheets: double the yearly need of 186,000, multiply by the order cost, divide by the carrying cost and take the root. That is about nine orders a year, roughly one container of king sheets every six weeks. The model assumes steady demand and fixed costs. Demand is seasonal, rising before summer, but annual cost barely changes for order sizes a little either side of 20,300, and ordering 18,000 or 23,000 sheets would raise annual ordering and holding costs by less than 1 percent, so the recommendation is to order about 20,000 sheets, matching a standard container load.

What this page is doingCalculates the economic order quantity.
5

Safety Stock

During the lead time, the uncertainty in demand has two sources: week-to-week variation in demand and variation in how many weeks the order takes. To combine them, two pieces of variance are added: the weekly demand variance multiplied by the number of weeks of lead time, and the square of average weekly demand multiplied by the variance of the lead time. The square root of that sum gives the spread of demand over a full replenishment.

Demand during the lead time and safety stock

ComponentValue
Expected lead-time demand, 12 weeks times 3,580About 42,900 sheets
Variation from weekly demand aloneAbout 2,400 sheets
Variation from lead time aloneAbout 10,700 sheets
Combined standard deviationAbout 11,000 sheets
Safety stock at a 97.5% service level, 1.96 standard deviationsAbout 21,600 sheets, about $160,000
Reorder pointAbout 64,500 sheets

Almost all of the safety stock is there because the mill's delivery dates are unpredictable, not because hotels' needs are. With demand variability alone, safety stock would be under 5,000 sheets.

What this page is doingCombines demand and lead-time variability.
6

Seasonality

Demand for king sheets is not flat across the year. Hotels add and replace linen before summer, and Fallowmere's needs from April to July run about 25 percent above the yearly average. Using one reorder point all year would leave the pool thin in spring and heavy in autumn. The reorder point is therefore raised by about 10,000 sheets for orders placed from January to April, when deliveries will arrive into the peak, and lowered by a similar amount from August to November. The order quantity stays near 20,000, because the cost curve is flat, but in the peak months orders simply come more often. The seasonal adjustment uses last year's pattern and will be checked against each year's actual demand.

What this page is doingAdjusts for the summer peak.
7

Supplier Reliability

If Fallowmere could hold the lead time to within about one week, by contracting with a mill that ships on fixed dates or by holding a reserve at a domestic distributor, the combined standard deviation would fall to about 4,300 sheets and safety stock to about 8,500, worth about $63,000. That would free about $97,000 of inventory and save about $21,000 a year in holding cost for king sheets alone. Applied across the eight highest-volume items, the saving in holding cost is roughly $110,000 a year. A domestic supplier charging up to about 1.5 percent more per sheet would still be cheaper overall. Gaur et al. (2005) showed that retailers' inventory turns differ a great deal and move with gross margin, capital intensity and sales surprises, and Chen et al. (2005) found that firms holding unusually high inventories tended to show weaker stock returns, which suggests the money tied up in buffers deserves management attention.

What this page is doingTests the key input.
8

The Bigger Problem

The ordering policy optimizes a flow that is far larger than it should be. The pool loses about 31 percent of its pieces a year. Tracking a sample of 2,000 tagged sheets for six months showed where they go.

Where lost pieces go, share of annual losses

CauseShare
Worn out and turned into rags after normal wear38%
Kept or taken by hotel guests21%
Used by hotel housekeeping as cleaning rags19%
Damaged by stains that do not wash out12%
Lost between hotels and plants10%

Only normal wear is unavoidable. Cachon and Fisher (2000) showed that sharing information between supply chain partners improves inventory performance; here, sharing loss counts with each hotel each month, with a charge for pieces lost above an agreed rate, would give hotels a reason to stop using sheets as rags. Reducing the loss rate from 31 to 24 percent, by halving misuse and in-transit loss, would save about 133,000 pieces a year, worth about $585,000.

What this page is doingPrices the losses.
9

Recommendation

Fallowmere should order king sheets in quantities of about 20,000, reorder when available stock falls to about 64,500 sheets, and seek a supplier or arrangement that holds lead time within a week, which would cut safety stock by about 60 percent. It should then turn to losses, which matter far more: monthly loss reports and charges for excess losses at hotels, and tagged sample tracking to measure progress.

What this page is doingStates the policy.
10

Conclusion

An economic order quantity of about 20,300 sheets and a reorder point of about 64,500 suit Fallowmere's king sheet demand, but the safety stock of about 21,600 sheets exists mainly because of the mill's unreliable lead time. Fixing the supplier would save about $110,000 a year in holding costs across major items, and reducing losses from the pool would save several times that.

What this page is doingSummarizes the findings.
11

References

Cachon, G. P., & Fisher, M. (2000). Supply chain inventory management and the value of shared information. Management Science, 46(8), 1032-1048. https://doi.org/10.1287/mnsc.46.8.1032.12029

Chen, H., Frank, M. Z., & Wu, O. Q. (2005). What actually happened to the inventories of American companies between 1981 and 2000? Management Science, 51(7), 1015-1031. https://doi.org/10.1287/mnsc.1050.0368

Gaur, V., Fisher, M. L., & Raman, A. (2005). An econometric analysis of inventory turnover performance in retail services. Management Science, 51(2), 181-194. https://doi.org/10.1287/mnsc.1040.0298

What the QSO 600 Module 5 instructions ask for

The QSO 600 Module 5 assignment usually asks students to apply inventory management models to a business situation. Expect to classify inventory, estimate demand and costs, calculate the economic order quantity, determine safety stock and reorder points for a target service level, evaluate total inventory cost and recommend a policy. Strong assignments state each model's assumptions and check whether they hold, include variability in both demand and lead time when setting safety stock, show which source of variability matters more, test how the policy changes with key inputs, consider what causes inventory to be needed in the first place, such as losses, and recommend actions in money terms.

How this QSO 600 Module 5 inventory assignment example is built

The assignment examines the rental linen pool of Fallowmere Linen Services, a fictional commercial laundry that owns about 1.9 million pieces in circulation at hotels and loses about 31 percent a year, costing about $5.8 million in replacements. For king sheets, with annual demand of about 186,000 from an overseas mill, an order cost of about $1,800 and yearly carrying charges of 22 percent on a $7.40 sheet, the cost-minimizing order is about 20,300 sheets. Because the mill's 12-week lead time varies by about three weeks, safety stock for 97.5 percent service is about 21,600 sheets, worth about $160,000; a supplier holding lead time within a week would cut it to about 8,500. Cutting losses to 24 percent is worth about $585,000 a year. Gaur and colleagues, Chen and colleagues and Cachon and Fisher inform it.

Where the QSO 600 Module 5 rubric puts the points

The QSO 600 inventory assignment typically rewards correct estimates of demand and costs, a correct economic order quantity with its assumptions stated, safety stock that includes both demand and lead-time variability, a reorder point tied to a stated service level, total cost calculations, sensitivity to key inputs, attention to the root causes of inventory need and recommendations valued in money. The strongest papers show which input, if changed, would save the most. Credit drops when safety stock ignores lead-time variability, formulas are applied without checking assumptions, service levels are not defined, sensitivity is missing or inventory is treated as fixed when its causes could be addressed. Tables, clear writing and APA citations complete the grade.

QSO 600 Module 5 help: the mistakes that cost points

Pick one item and gather its annual demand, the cost to place and receive an order, the unit cost and the annual holding cost rate. Calculate the economic order quantity and say which assumptions it relies on, such as steady demand. For safety stock, estimate the variability of demand per period and of the lead time, and combine them: the spread of demand over the whole lead time depends on both. Multiply by the z value for your service level and set the reorder point at expected lead-time demand plus safety stock. Then test what happens if lead time becomes more reliable or demand more variable. Finally, ask why the inventory is needed at all, for example to cover losses, and what reducing that need would save. Many papers leave lead-time variability out entirely, which understates safety stock badly.

Get QSO 600 Module 5 written to your instructions

Share the QSO 600 Module 5 instructions and your demand and cost data. A writer calculates the economic order quantity, separates demand and lead-time variability in safety stock, sets a reorder point for a target service level, tests how the answers change with supplier reliability, looks for the losses or waste that drive inventory and recommends actions with their value, citing inventory research. Your first QSO 600 paper is free, returned within roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 600 papers and related MS Operations Management samples

QSO 600 Module 5 questions, answered

Where can I find a free QSO 600 Module 5 Inventory Assignment sample?

The complete QSO 600 Module 5 assignment is on this page: order quantity, safety stock and losses in an invented laundry's linen pool.

What is the economic order quantity?

The order size that minimizes the total of ordering and holding costs, found from annual demand, the cost per order and the annual holding cost per unit.

What is safety stock?

Extra inventory held to protect against variation in demand and lead time, so that orders can be filled while a replenishment is on its way.

Why does lead-time variability matter for safety stock?

Because uncertainty about when an order will arrive multiplies with the demand during that time, and for long, unreliable lead times it can dominate.

What is a service level in inventory management?

The target probability of not running out during a replenishment cycle, which sets how much safety stock to hold.