Module Ten Discussion
Hot Water Down the Drain and Two Weeks of Disinfectant
Our improvement plan at Fallowmere Linen Services focused on the ironers, rewash, linen losses and deliveries. Two issues did not fit, and I think they should. The first is water and energy. Our Indianapolis tunnel washers use about 0.9 gallons of water a pound of linen; the older washer-extractors at Fort Wayne use about 1.8. Both plants send wastewater at about 120 degrees straight to the drain. The second is chemicals. All our detergent and the disinfectant our hospital contracts require come from one supplier, and we keep about two weeks of stock.
Fort Wayne washes about 15 million pounds a year. Replacing its washer-extractors with a tunnel washer, about $1.1 million installed, would save about 13.5 million gallons a year, about $160,000 in water and sewer charges, plus about $70,000 in gas for heating that water, a payback of under five years. A heat exchanger that warms incoming water with outgoing wastewater at both plants, about $180,000, would save about $95,000 a year in gas, under two years. Corbett and Klassen (2006) argue that environmental improvement often reveals operational waste and pays for itself. Our wastewater is an energy bill we pour away.
Last year a fire at our supplier's plant in another region left laundries there short for three weeks. If that happened to our plant, we would run out of disinfectant in two weeks and could not legally process hospital linen, 58 percent of our pounds. Kleindorfer and Saad (2005) recommend assessing disruption risks by both likelihood and impact and combining measures that address each. A second qualified supplier reduces the likelihood of a total stoppage. Holding four weeks of disinfectant, about $40,000 more stock, reduces its impact. Capacity research makes a similar point about hedging uncertain demand by keeping options open (Van Mieghem, 2003).
Both affect the same hospital customers and margins as the ironers. I would add both to next year's plan.
Which risk in your operation has never actually been tested?
References
Corbett, C. J., & Klassen, R. D. (2006). Extending the horizons: Environmental excellence as key to improving operations. Manufacturing & Service Operations Management, 8(1), 5-22. https://doi.org/10.1287/msom.1060.0095
Kleindorfer, P. R., & Saad, G. H. (2005). Managing disruption risks in supply chains. Production and Operations Management, 14(1), 53-68. https://doi.org/10.1111/j.1937-5956.2005.tb00009.x
Van Mieghem, J. A. (2003). Commissioned paper: Capacity management, investment, and hedging: Review and recent developments. Manufacturing & Service Operations Management, 5(4), 269-302. https://doi.org/10.1287/msom.5.4.269.24882
What the QSO 600 Module 10 instructions ask for
The final QSO 600 discussion usually asks students to consider sustainability, risk or other emerging issues in operations management. Expect to describe an operation's environmental impacts or vulnerabilities, assess their significance, consider how they affect costs, customers and strategy and propose operational responses. Strong posts measure resource use against a benchmark, price environmental improvements with payback or other financial measures, assess disruption risks by likelihood and consequence for customers, distinguish mitigation that reduces likelihood from mitigation that reduces impact and argue for building these factors into ordinary operations decisions. Replies are most useful when they ask which risk a classmate's operation has never tested.
How this QSO 600 Module 10 discussion example is built
The post looks at two issues the improvement plan left aside at Fallowmere Linen Services, a fictional commercial laundry with two plants. The Fort Wayne plant's older washer-extractors use about 1.8 gallons of water a pound against 0.9 for Indianapolis's tunnel washers, and both plants send hot wastewater to the drain. All detergent and hospital disinfectant come from one supplier with about two weeks of stock on hand, and a fire at that supplier's plant in another region last year left other laundries short for three weeks. The post prices heat recovery and a tunnel washer for Fort Wayne, proposes a second supplier and four weeks of disinfectant and argues that these belong in the operations case. Kleindorfer and Saad, Corbett and Klassen and Van Mieghem inform it.
Where the QSO 600 Module 10 rubric puts the points
The closing QSO 600 thread credits measured environmental performance against a benchmark, improvements priced with payback or similar measures, a disruption risk assessed by likelihood and impact, mitigations that address one or both, attention to customers' exposure, research on sustainable operations and risk and replies that probe untested risks in a classmate's operation. The best posts show the greener option also lowering cost or risk. They lose credit for treating sustainability as public relations, listing risks without assessing them, proposing mitigation without cost or replies that only agree. Writing quality and APA citations are assessed as well.
QSO 600 Module 10 help: the mistakes that cost points
Choose one environmental impact and one supply risk that matter to your operation. For the impact, measure use per unit of output and compare it with a benchmark, such as a newer process, a sister site or published figures. Price the improvement: investment, annual savings and payback. For the risk, describe what could happen, how likely it is and what it would do to customers and revenue. Separate mitigations that make the event less likely, such as a second supplier, from those that soften its impact, such as more stock. Cost each. Then argue for including both in the same decisions as capacity and cost, since they affect the same customers and margins. Posts often discuss sustainability in general terms; the stronger ones work out a payback and name the customer who would feel a disruption first.
Get QSO 600 Module 10 written to your instructions
Paste the QSO 600 Module 10 prompt and describe the environmental or risk issue in your operation. A writer measures resource use against a benchmark, prices improvements with payback, assesses supply disruption risk by likelihood and impact, proposes mitigations with their costs and argues for including both in operations decisions, citing operations research, then gives classmates a question to answer. Your first QSO 600 post is free, finished in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 600 papers and related MS Operations Management samples
- QSO 600 Module 1 Discussion: What Hospitals and Hotels Each Value
- QSO 600 Module 2 Process Analysis Assignment: Finding the Bottleneck
- QSO 600 Module 3 Discussion: Why Rewash and Complaints Rose Together
- QSO 600 Module 4 Lean Improvement Assignment: Cutting Changeovers at the Tunnel Washers
- QSO 600 Module 5 Inventory Assignment: A Linen Pool That Loses a Third a Year
- QSO 600 Module 6 Discussion: A Fourth Ironer or a Better Third?
- QSO 600 Module 7 Supply Chain Assignment: Hotel Orders That Swing More Than Occupancy
- QSO 600 Module 8 Queuing Assignment: Trucks Waiting at the Soil Dock
- QSO 600 Module 9 Final Project: The Operations Improvement Plan
- OL 663 Module 7 Milestone Three: Empowering Action and Short-Term Wins
- OL 670 Module 2 Discussion: Are Leaders Born With the Right Traits?
- OL 750 Module 4 Milestone Two: Literature Review and Analysis of Causes
- MGT 600 Module 10 Final Project: The Integrated Resource Plan
QSO 600 Module 10 questions, answered
Where can I find a free QSO 600 Module 10 Discussion sample?
This page holds the full QSO 600 Module 10 post: water, energy and single-supplier risk at an invented commercial laundry.
What is sustainable operations management?
Managing operations so that they deliver value while using resources efficiently and limiting environmental and social harm, often with cost benefits.
How is supply disruption risk assessed?
By estimating how likely a disruption is and how severe its consequences would be for operations and customers, then comparing mitigations.
How does reducing likelihood differ from reducing impact?
Reducing likelihood makes a disruption less probable, such as adding a supplier; reducing impact limits the harm if it happens, such as holding more stock.
Why include environmental measures in operations decisions?
Because resource use affects cost, regulation and customer requirements, and improvements often pay back through lower water, energy and material use.