QSO 600 Module 7 Supply Chain Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 600 Module 7 Supply Chain Assignment sample diagnoses the bullwhip effect in a customer supply chain, traces it to its causes and tests a replenishment design built on shared demand data. SNHU QSO 600 (QSO-600) assigns supply chain coordination in Module 7 of the MS Operations Management core course. The chain runs from Fallowmere Linen Services, an invented commercial laundry, to the hotels that rent its linen and request deliveries far more erratically than their guests arrive. The paper measures the gap, explains what creates it, designs a par-level replenishment system fed by occupancy data and reports a three-month pilot with 18 hotels.

CourseQSO 600 Operations Management
ModuleModule 7
Paper typegraduate assignment diagnosing the bullwhip effect in a customer supply chain, tracing it to its causes and testing a replenishment design based on shared demand data
LengthAbout 1,050 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 600 Module 7

1

Three and a Half Times as Jumpy as the Guests: Calming Fallowmere's Hotel Orders

[Student Name]

Southern New Hampshire University

QSO 600: Operations Management

Supply Chain Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe orders, occupancy data and pilot results at Fallowmere Linen Services in this QSO 600 assignment are invented.
2

Three and a Half Times as Jumpy as the Guests: Calming Fallowmere's Hotel Orders

Introduction

Fallowmere Linen Services delivers clean rental linen to about 120 hotels several times a week and collects soiled linen at the same stops. Hotels request how much to deliver, and the plants plan washing, ironing and truck loads around those requests. Planners have long complained that requests swing wildly, forcing overtime one week and idle time the next, and the plants run about 41 emergency deliveries a month when hotels run short, at an average cost of about $140 each. This assignment measures the swings, traces their causes and tests a different way of deciding what to deliver.

What this page is doingStates the problem.
3

Measuring the Swings

Hotel occupancy drives linen use: every occupied room uses about one set of sheets and towels a night, more for stays with daily changes. For 40 hotels that agreed to share their occupancy records for the past year, weekly occupied room nights and weekly delivery requests were compared.

Variability of occupancy and delivery requests, 40 hotels, past year

MeasureCoefficient of variation, weekly
Occupied room nights0.11
Linen used, estimated from room nights and stay patterns0.12
Linen delivery requests0.38

Requests varied about three and a half times as much as occupancy and linen use. Lee et al. (1997) called this pattern the bullwhip effect and showed that it arises from rational decisions by each party in the chain, not from irrational customers.

What this page is doingCompares orders with occupancy.
4

The Causes

Interviews with housekeeping managers at 12 hotels and a review of their request patterns point to three causes. First, batching: many hotels count their storerooms only when they look low and then request a large delivery to refill, so requests come in lumps rather than tracking daily use. Second, shortage gaming: after Fallowmere ran short during two large conventions last year, several hotels began requesting about 30 percent extra before any big event, then sent little the following week. Third, forecast margins: housekeeping managers add their own safety margins to the front desk's room forecasts, and the margins grow when they are unsure. Each response protects the hotel. Together they make the plants' demand far more erratic than the guests are.

What this page is doingTraces the amplification.
5

The Remedy

Cachon and Fisher (2000) showed that sharing demand information across a supply chain can reduce costs, especially when it allows the supplier to replenish more smoothly. The design replaces hotels' requests with par levels. For each hotel, Fallowmere and the hotel agree on a par level for each item, the stock the hotel should have on its shelves after each delivery, set at about two and a half days of use at expected occupancy. The hotel's property system sends Fallowmere its occupancy and booked rooms each night. Before each delivery, the driver counts the shelves, and the system calculates the delivery as par minus the count, adjusted up for any spike in booked rooms in the next three days. Hopp and Spearman (2004) describe pull systems as those that cap inventory and replenish what is used; delivering to par is a pull system, and capping each hotel's stock also removes the reason to hoard.

What this page is doingDesigns par-level replenishment.
6

Setting the Par Levels

A par level that is too low brings back shortages and the gaming that caused them; one that is too high fills closets with idle linen. For each pilot hotel, par was set at expected daily use, from occupancy and the share of stays with daily linen changes, multiplied by the days until the next delivery plus a cushion of half a day. A hotel with deliveries every two days and expected use of 400 king sheets a day therefore had a par of about 1,000 king sheets. Par levels were reviewed with each hotel's housekeeping manager before the pilot began, and two hotels with frequent large groups asked for a larger cushion on weekends, which was granted. The system also raises the delivery automatically when booked rooms for the next three days exceed the usual level by more than 15 percent, which replaces the hotels' habit of inflating orders before events.

What this page is doingExplains how each level was chosen.
7

The Pilot

Eighteen hotels of varied size and type ran the par system for three months, from June to August, and were compared with June to August of the previous year.

Pilot results, 18 hotels, three months

MeasureSame months last yearPilot
Coefficient of variation of weekly deliveries0.360.14
Emergency deliveries per monthAbout 6.2About 1.0
Linen pieces assigned to the 18 hotelsAbout 290,000About 267,000
Hotel-reported shortages of clean linen142

Delivery variability fell by about 61 percent, close to the variability of the hotels' own occupancy. Emergency runs for the pilot hotels almost stopped. Because hotels no longer hoarded, the linen assigned to them fell by about 8 percent, which also reduces the pool losses examined in Module 5, since unused stock in hotel closets is often where sheets become rags.

What this page is doingTests with 18 hotels.
8

Benefits and Costs

For Fallowmere, extending the par system to all 120 hotels would cut emergency deliveries by roughly 35 a month, about $59,000 a year; reduce the linen pool needed by about 8 percent of the hotel share, about 120,000 pieces worth about $530,000 that would not need to be bought as the pool turns over; and steady the plants' weekly loads, reducing the swings that cause overtime. For hotels, the benefits are fewer shortages, less time spent counting and requesting and less storeroom space. The costs are an integration with each hotel's property system, about $2,000 per hotel once, and about five extra minutes per stop for drivers to count shelves, which handheld scanners keep short.

What this page is doingValues the change for both parties.
9

Risks

Some hotels may not want to share occupancy data. The pilot ran in summer, when occupancy is steadier for many hotels, and conventions in the fall will test the spike adjustment. And par levels need review each season, or they will drift away from actual use.

What this page is doingStates what could go wrong.
10

Conclusion

Hotels' delivery requests at Fallowmere varied about three and a half times as much as their occupancy, because of batching, shortage gaming and forecast margins that each hotel had good reasons to use. A par-level system fed by daily occupancy data, tested with 18 hotels, cut delivery variability by about 61 percent, nearly ended emergency runs and reduced linen assigned to those hotels by about 8 percent. It should be offered to every hotel, starting with those that had the most emergency deliveries.

What this page is doingSummarizes the findings.
11

References

Cachon, G. P., & Fisher, M. (2000). Supply chain inventory management and the value of shared information. Management Science, 46(8), 1032-1048. https://doi.org/10.1287/mnsc.46.8.1032.12029

Hopp, W. J., & Spearman, M. L. (2004). To pull or not to pull: What is the question? Manufacturing & Service Operations Management, 6(2), 133-148. https://doi.org/10.1287/msom.1030.0028

Lee, H. L., Padmanabhan, V., & Whang, S. (1997). Information distortion in a supply chain: The bullwhip effect. Management Science, 43(4), 546-558. https://doi.org/10.1287/mnsc.43.4.546

What the QSO 600 Module 7 instructions ask for

The QSO 600 Module 7 assignment usually asks students to analyze a supply chain and recommend improvements. Expect to map the chain, describe how information and materials flow between partners, identify problems such as excess inventory, shortages or variability, explain their causes and propose improvements such as better coordination, information sharing or changes in ordering policies. Strong assignments quantify variability at each stage and compare it with end demand, trace amplification to specific causes, recognize that partners' behavior is rational given their incentives, design a remedy that changes the information each party uses, test it in a pilot and measure the results for both parties.

How this QSO 600 Module 7 supply chain assignment example is built

The assignment studies linen deliveries from Fallowmere Linen Services, a fictional commercial laundry, to its 120 rental hotels. Weekly delivery requests vary about three and a half times as much as hotel occupancy, and the plants run about 41 emergency deliveries a month at about $140 each. The paper traces the swings to hotels ordering in lumps when storerooms run low, inflating orders before conventions after past shortages and adding their own margins, and tests a system in which Fallowmere receives each hotel's daily occupancy and booked rooms and delivers to an agreed par level. In a three-month pilot with 18 hotels, delivery variability fell about 61 percent and emergency runs nearly stopped. Lee and colleagues, Cachon and Fisher and Hopp and Spearman inform it.

Where the QSO 600 Module 7 rubric puts the points

The QSO 600 supply chain assignment is commonly graded on an accurate map of material and information flows, variability measured at each stage against end demand, causes of amplification identified with evidence, an understanding of partners' incentives, a remedy that changes information or ordering rules, a pilot or careful estimate of effects, benefits and costs for each party and links to supply chain research. The strongest papers show how a partner's sensible local decision creates a costly pattern for the chain. Credit drops when variability is described but not measured, customers are blamed without examining incentives, remedies rely on better forecasts alone, effects are assumed or only one party's interests are considered. Tables, clear writing and APA citations complete the grade.

QSO 600 Module 7 help: the mistakes that cost points

Map who orders from whom and what each party sees when it decides. Measure the variability of end demand and of orders at each stage over the same weeks, for example as standard deviations or coefficients of variation, and compare them. Then look for the causes of any amplification: ordering in large, infrequent batches, adding safety margins to forecasts, inflating orders when supply has been short and reacting to price changes. Each is usually a sensible response to the information and incentives the party has. Design a remedy that changes those, such as sharing end-demand data or letting the supplier manage replenishment to agreed levels. Test it with a few partners, and measure effects on both sides. Weak papers stop at describing the bullwhip in general terms and never measure it in their own case.

Get QSO 600 Module 7 written to your instructions

Share the QSO 600 Module 7 instructions and the supply chain you are examining. A writer measures how much variability grows from end demand to orders, traces it to causes such as batching, gaming and forecast margins, designs a coordination remedy based on shared information, plans and evaluates a pilot and estimates costs and benefits, citing supply chain research. Your first QSO 600 paper is free, finished in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 600 papers and related MS Operations Management samples

QSO 600 Module 7 questions, answered

Where can I find a free QSO 600 Module 7 Supply Chain Assignment sample?

The complete QSO 600 Module 7 assignment is on this page: diagnosing and calming hotel linen orders at an invented commercial laundry.

What is the bullwhip effect?

The amplification of demand variability as orders move up a supply chain, so that suppliers see far larger swings than the end customer's actual demand.

What causes the bullwhip effect?

Commonly order batching, forecasting with added margins, inflated orders during shortages and buying ahead of price changes, each rational for the party doing it.

What is vendor-managed replenishment?

A setup where the supplier, not the customer, watches stock or usage and chooses delivery timing and size within agreed limits.

Why does sharing end-demand data help a supply chain?

Because each party can plan from actual demand rather than from distorted orders, which reduces amplification, shortages and excess inventory.