QSO 600 Module 8 Queuing Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 600 Module 8 Queuing Assignment sample applies queuing models to a service bottleneck, accounts for arrivals that change over the day and for variability and compares options for capacity and scheduling. SNHU QSO 600 (QSO-600) assigns service operations and queuing in Module 8 of its MS Operations Management core course. The queue forms at the soil dock of Fallowmere Linen Services, an invented commercial laundry, where drivers returning from routes wait to unload. The paper shows why an average-based model predicts almost no waiting, why drivers still sit for twenty minutes, and which of three remedies gives the most relief for the money.

CourseQSO 600 Operations Management
ModuleModule 8
Paper typegraduate assignment applying queuing models to a service bottleneck, accounting for time-varying arrivals and variability and comparing options for capacity and scheduling
LengthAbout 1,020 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 600 Module 8

1

Twenty Trucks Between Eight and Nine: Queuing at Fallowmere's Soil Dock

[Student Name]

Southern New Hampshire University

QSO 600: Operations Management

Queuing Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe arrivals, service times and options at Fallowmere Linen Services in this QSO 600 assignment are invented.
2

Twenty Trucks Between Eight and Nine: Queuing at Fallowmere's Soil Dock

Introduction

Each morning, about 46 Fallowmere Linen Services route trucks return to the Indianapolis plant to unload soiled linen collected from hospitals and hotels. The soil dock has two unloading bays, each with a two-person crew. Drivers have complained for months about waiting in line, and dispatch logs show that some trucks leave late on their afternoon delivery runs as a result. Managers disagree about the cause: some say the crews are slow, others that a third bay is needed. This assignment applies queuing analysis to the dock, explains why waits occur and compares remedies.

What this page is doingStates the problem.
3

Arrivals and Service

Gate logs for twenty weekdays recorded each truck's arrival time, and a sample of 160 unloads was timed. Unloading takes an average of six minutes per truck, with a standard deviation of about four minutes, longer for hospital routes with many small carts. Each bay can therefore unload about ten trucks an hour.

Truck arrivals by hour, average of twenty weekdays

HourTrucks arrivingUtilization with two bays
6 to 7 a.m.420%
7 to 8 a.m.1470%
8 to 9 a.m.20100%
9 to 10 a.m.840%
Busiest three hours, 7 to 10 a.m.About 14 an hourAbout 70%

The arrivals reflect route design: most routes were planned to finish their last collection around 8 a.m., so trucks return together.

What this page is doingMeasures the rates.
4

The Average Misleads

Gans et al. (2003), reviewing queuing models for service operations, explain the M/M/c model, in which arrivals are random, service times vary randomly and c servers work in parallel. Using the busiest three hours as a whole, about 14 trucks an hour at two bays able to serve ten an hour each, utilization is about 70 percent and the model's estimate of the average wait is about 5.8 minutes. Whitt (1993) showed that waiting times in such systems can be approximated by adjusting the M/M/c result for the actual variability of arrivals and service: here arrivals are roughly random, but unloading times vary less than the model assumes, which lowers the estimate to about 4.2 minutes. On that basis there is no problem.

The drivers disagree because the problem is concentrated in one hour. Between 8 and 9 a.m., about 20 trucks arrive at two bays that can serve 20 an hour. Utilization is at 100 percent, where a steady-state model has no stable answer: the line grows through the hour whenever arrivals bunch or an unload runs long and drains only after 9 a.m. The gate logs confirm it. Trucks arriving between 8 and 9 waited an average of 22 minutes, and about one in five waited more than 40.

What this page is doingApplies a model to the daily pattern.
5

Checking the Model

Before using the model to compare options, its predictions were checked against the gate logs for hours when the dock was not overloaded. Between 7 and 8 a.m., with about 14 arrivals and utilization near 70 percent, the adjusted model predicts an average wait of about 4.2 minutes, and trucks actually waited about 4.9. Between 9 and 10 a.m., with about eight arrivals, it predicts well under a minute, and the observed average was about 0.9 minutes. The model slightly understates waits, probably because trucks within an hour arrive in small clusters rather than fully at random, but it is close enough to rank the options. For the overloaded hour, the observed waits are used instead of the model.

What this page is doingCompares predictions with observed waits.
6

The Cost of Waiting

A waiting truck costs the driver's wages, about $28 an hour, plus the truck's hourly cost, about $20, about $48 an hour. Twenty trucks waiting an average of 22 minutes is about 7.3 truck-hours, or about $350, each weekday morning, about $91,000 a year over 260 weekdays. Late departures on afternoon runs add costs not counted here, including overtime and late deliveries to hotels.

What this page is doingPrices the problem.
7

Options

Three remedies were analyzed for the peak hour, each with the variability adjustment.

Average wait in the 8 to 9 a.m. hour under each option

OptionTrucks per hourBays and service rateUtilizationEstimated average waitAnnual cost of option
Current20Two bays, 10 per hour each100%22 minutes observed
Third crew 7:45 to 9:30 a.m.20Three bays, 10 per hour each67%About 2 minutesAbout $27,000 in labor
Roll-off carts, unloads in 4.5 minutes20Two bays, 13.3 per hour each75%About 4 minutesAbout $38,000 for carts once
Stagger route finishes14Two bays, 10 per hour each70%About 4 minutesRoute redesign, under $5,000

Staggering route finishes, by moving six routes' last collection 45 to 60 minutes earlier, spreads the peak so that no hour has more than about 14 arrivals. That keeps utilization at or below about 70 percent in every hour and brings the average wait in the busiest hours to about four minutes. Peak-hour waiting would fall from about $350 to about $50 a morning, and after allowing about $20,000 a year for the longer drive times on the six changed routes, the net saving is about $55,000 a year, at almost no cost. The third crew would cut waits further but costs about $27,000 a year and leaves crews idle outside the peak. Roll-off carts would also help, and they shorten unloading at every hour, but cost about $38,000 to buy.

What this page is doingCompares capacity, speed and scheduling.
8

Recommendation

Schmenner and Swink (1998) argue that productivity rises when flow is swift and even, and that variability in arrivals is often cheaper to remove than to absorb with capacity. Fallowmere should stagger route finishes first, then buy roll-off carts for the hospital routes, whose unloads are the longest and most variable, which would reduce both average service time and its variability. A third crew should be held in reserve for days when large hospital routes return late.

What this page is doingStates the plan.
9

Conclusion

Averaged over the morning, Fallowmere's soil dock looks underused, and a queuing model predicts waits of about four minutes. The real problem is a single hour in which arrivals equal the dock's capacity, producing waits of 22 minutes on average and costing about $91,000 a year. Spreading route finishes so that no hour exceeds about 14 arrivals solves most of the problem at almost no cost, and roll-off carts for hospital routes would reduce the rest.

What this page is doingSummarizes the analysis.
10

References

Gans, N., Koole, G., & Mandelbaum, A. (2003). Telephone call centers: Tutorial, review, and research prospects. Manufacturing & Service Operations Management, 5(2), 79-141. https://doi.org/10.1287/msom.5.2.79.16071

Schmenner, R. W., & Swink, M. L. (1998). On theory in operations management. Journal of Operations Management, 17(1), 97-113. https://doi.org/10.1016/S0272-6963(98)00028-X

Whitt, W. (1993). Approximations for the GI/G/m queue. Production and Operations Management, 2(2), 114-161. https://doi.org/10.1111/j.1937-5956.1993.tb00094.x

What the QSO 600 Module 8 instructions ask for

The QSO 600 Module 8 assignment typically asks students to analyze a waiting line in a service or production setting. Expect to describe the arrival process and service process, estimate arrival and service rates, apply a queuing model to find utilization, average queue length and average waiting time, and evaluate changes such as adding servers or speeding service. Strong assignments measure rates by time period rather than over the whole day, recognize when a peak pushes utilization near or above one, adjust standard formulas for the variability actually observed, compare adding capacity with reducing service time and smoothing arrivals, put a cost on waiting and check the model's predictions against observed waits.

How this QSO 600 Module 8 queuing assignment example is built

The assignment studies the soil dock at the Indianapolis plant of Fallowmere Linen Services, a fictional commercial laundry, where returning route trucks wait to unload at two bays. Over the morning, trucks arrive at about 14 an hour and take about six minutes to unload, and a queuing model predicts waits of about four minutes, but drivers report waits of 20 minutes or more because about 20 trucks arrive between 8 and 9 a.m. Using an M/M/c model adjusted for variability, the paper compares a third crew in the peak hour, cutting the average wait to about two minutes, faster unloading with roll-off carts, about four minutes, and staggering route finishes, about four minutes. The stagger saves about $55,000 a year at almost no cost. Whitt, Gans and colleagues and Schmenner and Swink inform it.

Where the QSO 600 Module 8 rubric puts the points

Graders of the QSO 600 queuing assignment expect a clear description of arrivals and service, rates measured by time period, correct utilization and waiting calculations, a suitable model with adjustments for variability, recognition of peaks where utilization approaches one, a comparison of capacity, speed and scheduling options, waiting costs set against the cost of each option and a check against observed waits. The strongest papers explain why an all-day average misleads. Credit drops when daily averages are used for a peaked process, formulas are applied when utilization exceeds one, variability is ignored, only one option is considered or waiting is never given a cost. Tables, clear writing and APA citations complete the grade.

QSO 600 Module 8 help: the mistakes that cost points

Count arrivals in short intervals, such as fifteen minutes or an hour, across several days, and time service for a sample of customers. Calculate utilization for each interval by dividing the arrival rate by the total service rate of all servers. Where utilization is near or above one, queues grow through the interval and standard steady-state formulas will understate waits, so say so and use the observed queue. For intervals below one, apply an M/M/c model and adjust the waiting time for how variable arrivals and service actually are. Then compare options: more servers in the peak, faster service and spreading arrivals out. Put a cost on waiting, such as staff and equipment time, and compare it with each option's cost. Papers often apply a formula to the daily average and conclude there is no problem.

Get QSO 600 Module 8 written to your instructions

Share the QSO 600 Module 8 instructions and describe the waiting line you are studying. A writer measures arrival and service rates by time of day, applies a suitable queuing model with corrections for variability, explains why averages hide the peak, compares options for adding capacity, speeding service or reshaping arrivals and prices waiting against the cost of each option, citing queuing research. Your first QSO 600 paper is free, sent back in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 600 papers and related MS Operations Management samples

QSO 600 Module 8 questions, answered

Where can I find a free QSO 600 Module 8 Queuing Assignment sample?

The complete QSO 600 Module 8 assignment is on this page: trucks waiting at an invented commercial laundry's soil dock.

What is utilization in a queuing system?

The arrival rate divided by the total service rate of all servers, the share of time servers are busy; as it nears one, waits rise sharply.

What is an M/M/c queue?

A queuing model with random arrivals, random service times and c identical servers, used to estimate waiting times and queue lengths.

Why do daily averages understate waiting?

Because arrivals often bunch at certain times, and during those peaks utilization can approach or exceed capacity even if the daily average is low.

How can waiting be reduced without adding servers?

By speeding service, reducing its variability or spreading arrivals more evenly, for example by changing schedules or appointment times.