| Course | SPT 700 Sport Management Capstone |
|---|---|
| Module | Module 4 |
| Paper type | graduate discussion post reporting early findings from capstone stakeholder interviews, comparing what participants said with research and explaining how the findings changed the project |
| Length | About 340 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Sport Management |
| Updated | October 2026 |
Free sample paper for SPT 700 Module 4
Module Four Discussion
The Veteran Who Called
For the Gateway Officials Association capstone, a graduate student outside our association interviewed 18 officials recruited in the last three years: nine who stayed past two seasons and nine who left. Interviews were confidential; I have read only anonymous transcripts.
Their stories had a shape. Each described a first game that went badly, usually a youth or junior varsity game where a coach or parent shouted for most of the evening. Most had been sent to that game alone or with another first-year official. Afterward, no one from the association called. Several said they did not know how anyone moved up to better games. One said, "I figured if nobody noticed whether I was any good, it didn't matter if I stopped."
Those who stayed almost all named one person: a veteran who called after a rough game, worked their early games alongside them or told them they were ready for varsity. None of these veterans had been assigned that role; they had simply taken it on.
Pay came up less than our board expected. Few officials named it as the main reason they left, though several said the money was not worth the stress. That fits Hancock et al. (2015), who found that officials often begin for enjoyment, involvement and income but continue for growth and connection. Kellett and Shilbury (2007) found that umpires with a supportive peer community could treat abuse as part of the role, and Livingston and Forbes (2016) linked perceived organizational support to retention. Our stayers had that support by luck; our leavers did not.
Our leaders assumed the answer was higher fees. The interviews moved the capstone toward mentoring: making by design what the stayers found by chance. Eighteen interviews cannot prove that mentoring keeps officials, and the officials who stayed may simply have been the ones veterans chose to help, so the records analysis will test whether officials who worked early games with veterans stayed longer.
What did your stakeholders tell you that you did not expect?
References
Hancock, D. J., Dawson, D. J., & Auger, D. (2015). Why ref? Understanding sport officials' motivations to begin, continue, and quit. Movement & Sport Sciences, 87(1), 31-39. https://doi.org/10.3917/sm.087.0031
Kellett, P., & Shilbury, D. (2007). Umpire participation: Is abuse really the issue? Sport Management Review, 10(3), 209-229. https://doi.org/10.1016/S1441-3523(07)70012-8
Livingston, L. A., & Forbes, S. L. (2016). Factors contributing to the retention of Canadian amateur sport officials: Motivations, perceived organizational support, and resilience. International Journal of Sports Science & Coaching, 11(3), 342-355. https://doi.org/10.1177/1747954116644061
What the SPT 700 Module 4 instructions ask for
The SPT 700 stakeholder discussion commonly asks students to share what they have learned from people connected to their capstone problem, through interviews, surveys or meetings, and how it shapes the project. Expect to summarize findings and reflect on them. Strong posts report themes fairly, including views that challenge the writer's assumptions, quote or paraphrase participants without identifying them, compare findings with research, explain the limits of a small sample and describe how the findings changed the problem, questions or likely solutions. They also note how participants were protected. Replies should ask classmates what their stakeholders said that they did not expect. Explain how participants were protected and who conducted the interviews.
How this SPT 700 Module 4 discussion example is built
The post reports early findings from 18 interviews with new Gateway Officials Association officials, a fictional St. Louis nonprofit, nine who stayed and nine who left, conducted by an outside graduate student. Leavers described a first abusive game, working youth games alone, no follow-up and no path upward; stayers named one veteran who called, worked alongside them or pushed them toward better games. Few named pay first, though several said it did not justify the stress. Research on shifting motives and support helps explain it, and the finding moved the capstone toward mentoring against leaders' assumption about pay. Hancock and colleagues, Livingston and Forbes and Kellett and Shilbury are cited. Limits of a small sample are acknowledged.
Where the SPT 700 Module 4 rubric puts the points
For the stakeholder thread in SPT 700, instructors typically credit fair reporting of themes, attention to findings that challenge assumptions, protection of participants' identities, comparison with research, honesty about sample limits and a clear account of how the findings changed the capstone. Posts score well when stakeholders' voices visibly redirect the project. They lose credit for reporting only what confirms the writer's views, for identifying participants, for treating a small sample as proof or for no sources. Two APA citations and replies that ask about classmates' surprises complete the grade. A clear note on who conducted the interviews and how identities were protected also earns credit.
SPT 700 Module 4 help: the mistakes that cost points
Summarize what people told you in a few themes, and include the ones you did not expect. Paraphrase or quote briefly without names or details that would identify anyone. Compare the themes with what research has found: do your participants sound like those in published studies? Be honest that a small number of interviews suggests rather than proves. Then explain what changed in your capstone because of what you heard. Posts often report findings that confirm the original plan; the stronger ones show where the people closest to the problem corrected the writer. Then tell classmates what you will test next with other evidence. Keep quotes short.
Get SPT 700 Module 4 written to your instructions
Paste the SPT 700 Module 4 prompt and describe the stakeholder input you have gathered. A writer summarizes the themes fairly, compares them with research, explains how they changed your capstone and invites classmates to share what surprised them, with APA sources. Your first SPT 700 post is free, delivered in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More SPT 700 papers and related MS Sport Management samples
- SPT 700 Module 1 Discussion: Choosing a Capstone Problem
- SPT 700 Module 2 Situation Analysis Assignment: The Officiating System in the Region
- SPT 700 Module 3 Milestone One: The Problem Statement and Literature
- SPT 700 Module 5 Milestone Two: Recruitment and Attrition Data
- SPT 700 Module 6 Strategic Options Assignment: Four Ways to Keep Referees
- SPT 700 Module 7 Discussion: Teenagers with Whistles
- SPT 700 Module 8 Implementation Assignment: The Plan, the Money and the Measures
- SPT 700 Module 9 Final Project: The Capstone Report
- SPT 700 Module 10 Discussion: Looking Back on the Degree
- CSR 610 Module 4 Discussion: When Making the Ship Date Becomes the Value
- QSO 645 Module 1 Discussion: Five Process Groups in One Dome
- OL 500 Module 2 Milestone One: Case Introduction and Individual-Level Analysis
- ACC 692 Module 9 Milestone Three: Preparing to Testify as an Expert
SPT 700 Module 4 questions, answered
Where can I find a free SPT 700 Module 4 Discussion sample?
The full SPT 700 Module 4 post on interviews with new referees at an invented St. Louis association is on this page.
Why interview stakeholders in a capstone?
Interviews reveal reasons and experiences that records cannot show and often challenge assumptions about the problem.
How should interview findings be reported?
As themes supported by brief paraphrases or quotes, without identifying participants, with honest notes on sample limits.
Why do officials who stay differ from those who leave?
Research and interviews suggest that support from peers and mentors helps officials absorb abuse and grow in the role.
Is pay the main reason sport officials quit?
Often not; officials frequently cite abuse and lack of support first, though low pay can make stress feel not worth it.