HIM 480 Module 5 Solution Design Short Paper Example

Reviewed by Delia Ravenscroft, MSN, RN

This HIM 480 Module 5 Solution Design Short Paper sample designs a solution for incomplete and outdated problem lists in which every component answers a root cause found in the baseline analysis. It is written for SNHU HIM 480 (HIM-480), and it models the step in a BS Health Information Management capstone where analysis turns into design. At the composite two-hospital system in western North Carolina, only 72.6% of qualifying chronic conditions appeared on problem lists and 23% of lists kept resolved problems active. The paper proposes an ownership policy, a reconciliation step at chronic care visits, a problem pane inside the note template, decision support suggesting likely missing conditions, clinic feedback, patient review through the portal and a health information cleanup of duplicates, explains the rules and safeguards behind each and shows how they fit together.

CourseHIM 480 Health Information Management Capstone
ModuleModule 5
Paper typeundergraduate capstone paper designing a solution matched to root causes
LengthAbout 1,030 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Health Information Management
UpdatedOctober 2026

Free sample paper for HIM 480 Module 5

1

One Fix for Each Cause: Designing a Problem List Improvement Program for Hollis Ridge Health

[Student Name]

Southern New Hampshire University

HIM 480: Health Information Management Capstone

Solution Design

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe title states the design principle of matching fixes to causes.
2

One Fix for Each Cause: Designing a Problem List Improvement Program for Hollis Ridge Health

The baseline audit at Hollis Ridge Health found that roughly one qualifying chronic condition in four was missing from the list and that almost a quarter of patients carried stale entries. The root cause analysis traced these gaps to unclear ownership, the absence of any routine review, a cumbersome interface, the lack of prompts when data suggest a missing condition and the absence of policy. This paper designs a program in which each component addresses at least one of those causes, and it explains how the components work together.

What this page is doingThe introduction restates the causes the design must address.
3

Design Principles

Three principles guided the design. First, keep clinical judgment with clinicians: the list should reflect a clinician's synthesis of the patient, which Kaplan (2007) described as the list's real value, so no component adds diagnoses automatically. Second, make the right action the easy action by placing the list where clinicians already work. Third, fix the process as well as the backlog, so the list stays accurate after the project ends. Simons et al. (2016) reached similar conclusions, emphasizing agreed definitions, clear responsibility and usable design as determinants of a successful problem list.

What this page is doingDesign principles are stated with support from the literature.
4

Component 1: An Ownership Policy

A written policy will make the patient's primary care clinician responsible for the overall list, while every clinician who diagnoses a chronic condition must add it with a codable term. Specialists may add problems in their field and are expected to resolve problems they added when those problems end. The policy also defines what belongs on the list, chronic and active conditions and significant history, and what does not, such as symptoms already explained by a listed diagnosis. The medical executive committee will be asked to adopt the policy so it carries medical staff authority rather than appearing to come from health information alone.

What this page is doingThe ownership policy addresses unclear responsibility and absent policy.
5

Component 2: Reconciliation at Chronic Care Visits

At annual wellness visits and chronic disease follow-ups, the rooming nurse will open the list and ask the patient about each problem, then flag items that may have resolved. The clinician confirms or resolves them before signing the note. This builds the missing routine into existing visits instead of creating a separate task and addresses the stale problems found on 23% of lists.

What this page is doingA reconciliation routine addresses currency.
6

Component 3: The List Inside the Note

The informatics team will add a problem pane to the primary care note template so clinicians can add, update or resolve a problem without leaving the note, and so that assessment and plan entries can be written against listed problems. This reduces the steps that interviews described as the main obstacle and ties the list to the note, as the problem-oriented record intended.

What this page is doingInterface redesign addresses the effort barrier.
7

Component 4: Suggestions of Likely Missing Problems

Decision support will suggest conditions that the record's data imply but the list lacks. Wright et al. (2012) tested this approach in a randomized trial and found that clinics receiving inferred problem suggestions documented substantially more of the targeted conditions than control clinics. Hollis Ridge will start with three conditions where rules are clear and the audit gap is large. For chronic kidney disease, the rule follows the KDIGO definition summarized by Levin and Stevens (2014), which requires reduced kidney function or markers of damage persisting for more than three months: a suggestion appears once two eGFR results under 60, drawn 90 or more days apart, are on file. For diabetes, two qualifying glycated hemoglobin results or a prescription for insulin or another diabetes drug besides metformin will prompt one. For heart failure, a reduced ejection fraction on echocardiography with a heart failure medication will prompt one. Each suggestion must be accepted, dismissed with a reason or deferred, and dismissals will be reviewed monthly to refine rules and limit alert fatigue. Suggestions will appear only in the problem pane during a visit, never as interrupting pop-ups, and a clinician who dismisses the same suggestion twice for a patient will not see it again for a year unless new data arrive.

What this page is doingInference-based suggestions address the prompt gap, with rules and safeguards.
8

Component 5: Feedback to Clinics

Each clinic will receive a monthly report showing completeness for the six conditions, the share of lists reviewed at chronic care visits and the rate of accepted suggestions, compared with other clinics and with targets. Clinicians told interviewers they did not know the list mattered, so each report will include one example of a decision support rule or quality measure that depends on it.

What this page is doingClinic feedback addresses awareness and accountability.
9

Component 6: Patients as Reviewers

Patients already see their problem list in the portal. In surveys spanning seven years of open visit notes, Walker et al. (2019) heard from patients who generally reported better understanding of their care and valued the access, which suggests patients can be partners in keeping the record accurate. The portal will add a simple option for patients to flag a problem they believe is resolved or incorrect, routed to the care team for review rather than changed automatically.

What this page is doingPatient review adds another check on accuracy.
10

Health Information Cleanup

The health information data integrity team will run a monthly report of duplicate entries, such as the same condition listed under two terms, and send merge suggestions to the responsible clinician. It will also maintain the list of approved terms and their mappings to diagnosis codes, so that problems added through any component are codable.

What this page is doingHIM owns duplicate cleanup and terminology maintenance.
11

How the Components Fit

Table 1 maps each component to the root causes it addresses. No single component solves the problem; together they create responsibility, a routine, an easier path, prompts, feedback and a second set of eyes.

Table 1. Components Mapped to Root Causes

ComponentRoot causes addressed
Ownership policyUnclear responsibility; no policy
Reconciliation at chronic care visitsNo routine review; stale problems
Problem pane in noteCumbersome design
Inferred problem suggestionsNo prompts when data suggest a condition
Monthly clinic feedbackLow awareness of the list's uses
Patient review in portalNo routine review; stale problems
HIM duplicate cleanupDuplicates; inconsistent terms

Note. Mapping by the author based on Milestone Two findings.

What this page is doingTable 1 maps components to root causes.
12

Conclusion

The proposed program treats problem list accuracy as a shared process rather than an individual failing. By pairing a clear policy and routine with easier design, evidence-based suggestions, feedback and patient review, it addresses every root cause found at Hollis Ridge while leaving clinical judgment where it belongs. Milestone Three will plan how to implement and evaluate the program.

What this page is doingThe conclusion restates the design and links to Milestone Three.
13

References

Kaplan, D. M. (2007). Clear writing, clear thinking and the disappearing art of the problem list. Journal of Hospital Medicine, 2(4), 199-202. https://doi.org/10.1002/jhm.242

Levin, A., & Stevens, P. E. (2014). Summary of KDIGO 2012 CKD guideline: Behind the scenes, need for guidance, and a framework for moving forward. Kidney International, 85(1), 49-61. https://doi.org/10.1038/ki.2013.444

Simons, S. M. J., Cillessen, F. H. J. M., & Hazelzet, J. A. (2016). Determinants of a successful problem list to support the implementation of the problem-oriented medical record according to recent literature. BMC Medical Informatics and Decision Making, 16, Article 102. https://doi.org/10.1186/s12911-016-0341-0

Walker, J., Leveille, S., Bell, S., Chimowitz, H., Dong, Z., Elmore, J. G., Fernandez, L., Fossa, A., Gerard, M., Fitzgerald, P., Harcourt, K., Jackson, S., Payne, T. H., Perez, J., Shucard, H., Stametz, R., DesRoches, C., & Delbanco, T. (2019). OpenNotes after 7 years: Patient experiences with ongoing access to their clinicians' outpatient visit notes. Journal of Medical Internet Research, 21(5), Article e13876. https://doi.org/10.2196/13876

Wright, A., Pang, J., Feblowitz, J. C., Maloney, F. L., Wilcox, A. R., McLoughlin, K. S., Ramelson, H., Schneider, L., & Bates, D. W. (2012). Improving completeness of electronic problem lists through clinical decision support: A randomized, controlled trial. Journal of the American Medical Informatics Association, 19(4), 555-561. https://doi.org/10.1136/amiajnl-2011-000521

What the HIM 480 Module 5 instructions ask for

The HIM 480 solution design paper asks you to propose a solution to the problem your analysis defined and to show why it should work. Plan on four or five HIM 480 pages in APA 7, supported by research and anchored by a table that ties each component to a cause. State the design principles you followed, then describe each component in enough detail that a manager or informatics team could build it: rules, responsibilities, timing and safeguards. Tie every component to a root cause from your data milestone, cite evidence where it exists and explain how the parts work together. Avoid proposing technology alone; most health information problems also need policy, routine and feedback to last.

How this HIM 480 Module 5 solution design short paper example is built

The Hollis Ridge design answers five root causes with six components and a health information cleanup. An ownership policy for the medical staff, a reconciliation step at chronic care visits and a problem pane inside the note address responsibility, routine and effort. Following Wright and colleagues' trial, decision support suggests likely missing kidney disease, diabetes and heart failure, with the kidney rule based on the KDIGO definition summarized by Levin and Stevens. Monthly clinic feedback, patient flags in the portal informed by Walker and colleagues and duplicate cleanup complete the program. Kaplan and Simons and colleagues shape principles that keep clinical judgment central in this HIM 480 design.

Where the HIM 480 Module 5 rubric puts the points

Solution design papers in HIM 480 are commonly graded on alignment between components and root causes, feasibility, specificity of rules and responsibilities, use of evidence, attention to unintended effects, integration of components and APA 7 mechanics. Papers that stand out define decision rules precisely, including thresholds and timing, and include safeguards such as review of dismissed suggestions. Graders reward designs that combine policy, workflow, technology and feedback rather than relying on one lever. A mapping table showing that every root cause is addressed makes the logic visible and prepares the ground for the implementation and evaluation milestone. Naming who maintains each rule after launch adds realism.

HIM 480 Module 5 help: the mistakes that cost points

HIM 480 solution papers slip when components are not linked to root causes, when decision rules are vague, when the design relies only on training or technology or when possible harms such as alert fatigue are ignored. Some drafts also propose automated changes to clinical data, which raises safety and ownership concerns. If your capstone addresses a different problem, such as release of information delays or coding denials, send your data milestone and root causes so each component answers one of them. Mention any constraints your sponsor set, such as budget, informatics hours or a required timeline. HIM 480 designs we write keep this order: principles, components with rules, cleanup role, mapping table and conclusion.

Get HIM 480 Module 5 written to your instructions

Forward the HIM 480 Module 5 prompt with your root cause analysis. The paper will state design principles, describe each component with rules, owners and safeguards, cite supporting evidence and show in a table which cause each component answers, ready in 24 to 48 hours at no cost for your first sample. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More HIM 480 papers and related BS Health Information Management samples

HIM 480 Module 5 questions, answered

Where can I find a free HIM 480 Module 5 Solution Design Short Paper sample?

The entire HIM 480 Module 5 paper is on this page: a six-part problem list solution, each part matched to a root cause, with rules and safeguards.

How should a capstone solution relate to root causes?

Every component should address at least one root cause identified in the data analysis, shown in a mapping table.

What is an inferred problem suggestion?

Decision support that proposes a likely missing condition based on lab results or medications, which the clinician accepts or dismisses.

Why not add problems to the list automatically?

Automatic additions bypass clinical judgment, can introduce errors and weaken clinicians' ownership of the list.

How can patients help keep problem lists accurate?

By flagging problems they believe are resolved or incorrect through the portal, for review by the care team.