| Course | MKT 345 Consumer Behavior |
|---|---|
| Module | Module 7 |
| Paper type | undergraduate final project presenting a consumer behavior analysis with marketing recommendations |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Marketing |
| Updated | October 2026 |
Free sample paper for MKT 345 Module 7
Why They Shop, Why They Stay Away and Why They Give: A Consumer Behavior Strategy for Second Chapter Thrift
[Student Name]
Southern New Hampshire University
MKT 345: Consumer Behavior
Final Project: Consumer Behavior Analysis and Strategy
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Why They Shop, Why They Stay Away and Why They Give: A Consumer Behavior Strategy for Second Chapter Thrift
Summary for the Board
Second Chapter Thrift's shoppers come for four different reasons: to stretch a tight budget, to hunt for something unique, to support the mission and reduce waste and, for a small group, to buy goods to resell. Many residents never come at all because used goods feel unclean to them, and many donors give items the stores cannot sell. This report recommends six changes, five in the stores and one aimed at donors, each tied to a consumer finding and a psychological or social influence and each tested before it spreads. Together they cost under $12,000 in their test phase.
Who the Shoppers Are
A survey of 410 shoppers linked to loyalty-card purchases found budget stretchers to be the largest group and the biggest contributors to sales, treasure hunters numerous but light spenders, values-driven shoppers moderate in number and resellers few but heavy buyers. Guiot and Roux (2010) group second-hand shopping motives into economic, recreational and critical clusters, and the four segments map onto them closely, with resellers driven by an economic motive of a different kind: profit rather than thrift.
How Treasure Hunters Decide
For the youngest shoppers, the trip starts with a wish for something original, prompted by a friend's video or an upcoming event. Search happens on social media and then hanger by hanger. The decision is made in the aisle, often with a friend's approval, and the purchase is photographed and posted. That makes the store environment and the social setting the main levers, far more than price, which treasure hunters rarely mentioned unless something seemed overpriced for its condition.
Why Some Residents Stay Away
Asked why they never shop at thrift stores, more than a third of non-shoppers outside a nearby grocery store said used goods feel dirty, especially clothing. The stores' cues, a musty smell, crowded racks, aisle bins and dim light, confirm that impression even though every garment is cleaned.
Recommendations
Recommendations mapped to findings and influences
| Recommendation | Finding | Influence | Segment served | Risk | Test |
|---|---|---|---|---|---|
| Restock four times a day | Best items gone by ten | Situational: time and novelty | Treasure hunters | Resellers lose their early advantage | Visits and tagged posts in the test store |
| Clean signals | "Used means dirty" | Perception | Non-shoppers; all | Store feels less like a hunt | Exit question; new loyalty sign-ups |
| Quick-shop zone | Hurried parents and seniors | Situational: task and time | Budget stretchers | None significant | Transaction time; budget stretcher visits |
| Photo corner | Shopping in pairs and posting | Social influence | Treasure hunters | Minor congestion | Tagged posts |
| Mission signs | Shoppers unaware of impact | Values and identity | Values-driven shoppers | None | Values-segment spending |
| Donor campaign | 60 percent of donations unsellable | Social norms, habit, tangibility | Donors | Fewer donations overall | Sellable share at the test site |
The Servicescape and Perception
Bitner (1992) argued that a service's physical surroundings, its ambient conditions, layout and signs, shape both customers' and employees' internal responses and their behavior. For Second Chapter, the surroundings currently signal neglect and handling, the cues most likely to trigger discomfort with used goods. The store changes alter those cues while preserving a varied "just in" rack so that discovery remains.
Social Norms and the Donor Campaign
Goldstein et al. (2008) showed in hotel field experiments that messages describing what most guests did changed behavior more than appeals to environmental protection, especially when the norm referred to guests in the same room. The donor campaign uses that finding with a sign describing what most local donors do, a checklist bag handed out with purchases and a receipt showing what a good bag funds.
The Values-Driven Shopper and the Mission
A quarter of the customers are values-driven, and they are the ones who most often both give goods and buy them. They told the survey that they wanted to know what their spending achieved, yet the stores said almost nothing about the literacy programs. Mission signs at the register and a quarterly learner story address that gap at the moment of payment, when the connection between spending and impact is most natural. Because these shoppers also respond to the clean-signals program and the donor campaign, they are the segment most likely to notice the full set of changes and to talk about them.
The Reseller Question
Resellers divide staff and shoppers. They buy more than a quarter of the goods by value and keep slow items moving, but treasure hunters resent them. The report recommends neither courting nor restricting them. Spreading restocks across the day gives everyone a fair chance at new stock, and nothing in the plan prevents resellers from buying. If their share of sales falls, the stores will learn whether other segments fill the gap.
Costs and Sequence
The test phase costs about $8,200 for the store changes and about $3,400 for the donor campaign's bags, signs and texts. If tests succeed, signs, restock schedules and the photo corner reach the other stores first, because they are cheap; lighting follows as funds allow; and the donor campaign extends to the second drop-off site in the following season.
Revisions
One question raised on Milestone Two shaped the final plan: how to avoid alienating resellers, who provide more than a quarter of sales. The report now keeps purchase limits off the table and relies on spreading restocks through the day rather than restricting anyone.
Limitations
The survey reached buyers, not browsers who left empty-handed, and loyalty-card data miss the shoppers who never sign up. The non-shopper sample was small and drawn from one neighborhood. Tests in one store and one drop-off site may not generalize to all locations, since the largest store draws more students and the smallest serves mostly older neighbors.
Conclusion
Second Chapter Thrift does not need to become a different kind of store. It needs to give each of its consumers more of what brought them in, from the thrill of a fresh rack to a quick trip for a parent, and to remove the cues that keep others out, then let the tests show which changes deserve a place in every store.
References
Bitner, M. J. (1992). Servicescapes: The impact of physical surroundings on customers and employees. Journal of Marketing, 56(2), 57-71. https://doi.org/10.1177/002224299205600205
Goldstein, N. J., Cialdini, R. B., & Griskevicius, V. (2008). A room with a viewpoint: Using social norms to motivate environmental conservation in hotels. Journal of Consumer Research, 35(3), 472-482. https://doi.org/10.1086/586910
Guiot, D., & Roux, D. (2010). A second-hand shoppers' motivation scale: Antecedents, consequences, and implications for retailers. Journal of Retailing, 86(4), 355-371. https://doi.org/10.1016/j.jretai.2010.08.002
What the MKT 345 Module 7 instructions ask for
The MKT 345 final project asks for a full analysis of an organization's consumers and recommendations grounded in it: who the target consumers are, what motivates them, how they make decisions, which psychological, social and situational factors shape those decisions and what marketing strategies the organization should adopt as a result. Graders look for a report in which every recommendation can be traced back to a specific finding about consumers and an influence from the course, with the research that supports it. A strong final also weighs effects across segments, plans how each strategy will be tested and shows where feedback on the milestones changed the analysis. A short limitations section protects the recommendations from overconfidence.
How this MKT 345 Module 7 final project example is built
The sample is Second Chapter Thrift's consumer behavior report. It profiles four shopper segments, budget stretchers, treasure hunters, values-driven shoppers and resellers, and follows treasure hunters from a friend's video to an in-aisle decision and a post afterward. It explains why some residents stay away, a sense that used goods are unclean, and why many donations cannot be sold. Strategies follow: day-long restocking, clean signals, a quick-shop zone, a photo corner, mission signs and a donor campaign using norms, habit and tangible results. Each names its influence, segment, risk and test, supported by Guiot and Roux, Bitner and Goldstein, Cialdini and Griskevicius. Its first page states the case for the board in a single paragraph.
Where the MKT 345 Module 7 rubric puts the points
Final projects in consumer behavior are usually judged on the depth of the consumer analysis, the accurate use of course concepts and research, the logic linking analysis to strategy, attention to different segments and to evaluation and the clarity of writing and APA style. Reports that score highest let a reader trace each strategy to a finding and an influence, use evidence about the actual consumers, anticipate side effects and say how success will be measured. Marks drop for reports that list concepts without applying them, recommend generic actions, ignore conflicts between segments or paste the milestones together without revision. A clear summary at the front is expected. A single table mapping findings to strategies, influences and tests is an efficient way to show this.
MKT 345 Module 7 help: the mistakes that cost points
Open with a page that states who the consumers are, what drives them and what you recommend. Then present the analysis: segments and motives, the decision journey, perception, social influence and situation. For each recommendation, name the finding, the influence it works through, the segment it serves, the risk to others and the test that will judge it. Use one table to show this mapping. Keep research tied to points it supports. Note where feedback changed your thinking. Read the report as the organization's board would, asking whether each idea is affordable and justified. Cut any concept from the report that does not lead to a decision.
Get MKT 345 Module 7 written to your instructions
Send the MKT 345 final project directions together with your milestone files and the instructor's notes. We pull them into one report: segments and motives, decision journey, perception and social influence, strategies tied to each influence and tests to judge them. The first full draft costs nothing and normally lands within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 345 papers and related BS Marketing samples
- MKT 345 Module 1 Discussion: Why People Shop Thrift
- MKT 345 Module 2 Shopper Profile Assignment: Four Kinds of Thrift Shopper
- MKT 345 Module 3 Milestone One: The Treasure Hunter's Decision Journey
- MKT 345 Module 4 Discussion: The Problem With Things Others Touched
- MKT 345 Module 5 Milestone Two: Shaping the Store Around Its Shoppers
- MKT 345 Module 6 Persuasion Campaign Assignment: Changing How People Donate
- MKT 345 Module 8 Discussion: What the Test Store Taught Us
- ACC 315 Module 6 Discussion: A Fake Bank Change Request and IT Controls
- INT 400 Module 2 Project Proposal: Scope, Method and Timeline
- HRM 425 Module 5 Milestone Two: From Apprentice to Foreman
- ACC 405 Module 3 Equity Method Assignment: A 30 Percent Stake in a Maple Drinks Startup
MKT 345 Module 7 questions, answered
Where can I find a free MKT 345 Module 7 Final Project sample?
The complete MKT 345 Module 7 final project is available here, a consumer behavior strategy for a charity thrift chain's shoppers and donors.
What goes into a consumer behavior final project?
A profile of target consumers, their motives and decision process, the psychological, social and situational influences on them and strategies tied to those influences.
How should consumer behavior recommendations be justified?
Each should follow from a specific finding about consumers, work through a named influence and come with research showing why it should work.
Why consider several consumer segments in one strategy?
Changes that help one segment can annoy another, so a strategy should check its effects on every group that shares the same store or brand.
How can a business test consumer-based strategies?
Try changes in one location or period and compare results with similar locations or periods that did not change.