MKT 345 Module 6 Persuasion Campaign Assignment Example

Reviewed by Portia Lambrick, MBA

This MKT 345 Module 6 Persuasion Campaign Assignment sample designs a campaign to change what consumers believe and do, using research on social norms, habits and attitude change. SNHU MKT 345 (MKT-345) asks BS Marketing students to apply theories of attitudes and persuasion to a real behavior. Second Chapter Thrift, a composite charity thrift chain in Greensboro, North Carolina, receives donations of which about 60 percent cannot be sold. The paper defines the behavior to change, identifies the beliefs and situations behind it, designs messages built on social norms, habit, identity and tangible results, places them at the moments of donating and plans a test at two drop-off sites.

CourseMKT 345 Consumer Behavior
ModuleModule 6
Paper typeundergraduate assignment designing a campaign to change consumer attitudes and behavior
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Marketing
UpdatedOctober 2026

Free sample paper for MKT 345 Module 6

1

Good Bags, Not Just Full Bags: A Persuasion Campaign to Improve Donations to Second Chapter Thrift

[Student Name]

Southern New Hampshire University

MKT 345: Consumer Behavior

Persuasion Campaign Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe donation campaign and its figures belong to an invented teaching case.
2

Good Bags, Not Just Full Bags: A Persuasion Campaign to Improve Donations to Second Chapter Thrift

Introduction

A thrift store has two sets of consumers: those who buy and those who give. Second Chapter Thrift received about 2.1 million pounds of donations last year, and staff estimate that 60 percent could not be sold because items were stained, broken, incomplete or out of season. Sorting, storing and hauling unsellable goods to textile recyclers and the landfill cost the charity about $180,000, more than a year of literacy classes for 150 adults. At the same time, the stores need more of the clothing treasure hunters and budget stretchers look for. This campaign aims to change what donors give.

What this page is doingDefines the problem and the consumers.
3

The Target Behavior

The behavior to change is donating items that cannot be sold. The goals are to raise the share of sellable donations from 40 to 55 percent at the drop-off sites in the test and to increase donations of wearable clothing from adults aged 18 to 34, who donate less than older residents.

What this page is doingStates what should change.
4

Why People Donate as They Do

Interviews with 30 donors at drop-off sites found three patterns. Many believe "anything helps" and that the charity can use or recycle everything. Many donate during a big clean-out, when sorting feels like too much effort. And few know what happens to unsellable items or what a good donation earns. Younger residents mostly sell clothes on apps or throw them away, and several said they did not think of thrift stores as a place to give. The donors who brought the best items tended to be people who had shopped at the stores themselves and knew what sold, which suggests that turning shoppers into donors is one of the most promising routes.

What this page is doingIdentifies beliefs and situations.
5

Approach One: Social Norms

Goldstein et al. (2008) found in two hotel field experiments that signs saying most guests reused their towels increased reuse more than environmental appeals, with the biggest gains coming when the sign spoke about people who had stayed in that very situation, such as "the majority of guests in this room." Cialdini and Goldstein (2004) reviewed how people conform to the behavior of others to be accurate and to fit in. Drop-off signs will therefore describe what most donors already do: "Most Greensboro donors check their bags for stains and missing pieces before dropping off. Thank you for joining them."

What this page is doingShows what most donors do.
6

Approach Two: A Habit and a Simple Rule

A rule is easier to follow than a list. Donors will be invited to adopt "one in, one out": whenever they buy a new piece of clothing, they set aside one item in good condition for Second Chapter. A free donation bag, printed with a three-question checklist, would you give it to a friend, is it clean, are all the pieces there, will be handed out with every purchase. White et al. (2019) list five levers for greener behavior, from what peers do and how routines form to self-image, emotion and making outcomes concrete; this approach uses habit and the self-image of being a thoughtful giver.

What this page is doingMakes the right behavior easy.
7

Approach Three: Tangible Results

Abstract good intentions are hard to act on. Every donation receipt will show a simple tally: "A bag of clean, wearable clothes like yours raises about $25, a week of reading lessons for one adult." Donors who give a phone number will receive a short thank-you text a month later telling them that their items sold.

What this page is doingShows what a good bag does.
8

Approach Four: Reaching Young Adults

For young adults, the campaign uses the same channels treasure hunters use. Short videos will show a volunteer sorting a donation and explaining, without blame, what can and cannot be sold, and campus move-out days will feature collection points with the checklist, timed for the week when students discard the most clothing.

What this page is doingRecruits a new group of donors.
9

Messages and Placement

Messages by moment

MomentMessageMedium
Deciding what to give"Would you give it to a friend?" checklistDonation bags handed out at purchase
Arriving at drop-offDescriptive norm about most donorsSign at the drive-through
Receiving the receiptTangible tally of what a good bag fundsPrinted receipt
A month later"Your items sold and funded reading lessons"Text message
Spring move-outCollection points with the checklistCampus partnerships
What this page is doingPuts the words where the behavior happens.
10

Why Information Alone Would Fail

A simpler campaign would post a list of acceptable items. Interviews suggest it would not work: most donors already know that stained clothes are not ideal, yet they donate them during clean-outs because sorting feels like work and because they assume the charity can use everything. The campaign therefore works on the situation and the social signal rather than on knowledge. It puts a checklist in donors' hands before they clean out, makes good donating look like what most neighbors do and shows a concrete reward. Each approach addresses one of the three patterns the interviews found.

What this page is doingExplains the choice of approaches.
11

Avoiding Backfire

Asking donors to give less of some things could discourage giving altogether. Messages therefore thank donors first, never mention what was thrown away and frame the request around helping learners rather than reducing waste costs.

What this page is doingConsiders unintended effects.
12

Testing the Campaign

The campaign will run for twelve weeks at one of the chain's two drive-through drop-off sites, with the other as a comparison. The sites draw from similar neighborhoods and had similar sellable shares last year, which makes the comparison reasonably fair. Sorters will record, by weight, the share of each day's donations that is sellable at both sites, with the comparison site's figures from the same weeks setting the baseline. Success means the test site's sellable share rising at least 8 points more than the comparison site's.

What this page is doingMeasures the effect.
13

Conclusion

The campaign treats donors as consumers whose behavior is shaped by what they believe others do, by habits and by what they can see their gifts achieve. If it works, the charity spends less hauling waste and has more of what its shoppers want. If it does not, the test will at least show which message donors noticed, through a short question at drop-off asking what, if anything, they had read, so the next attempt can start from evidence rather than guesswork.

What this page is doingSums up.
14

References

Cialdini, R. B., & Goldstein, N. J. (2004). Social influence: Compliance and conformity. Annual Review of Psychology, 55, 591-621. https://doi.org/10.1146/annurev.psych.55.090902.142015

Goldstein, N. J., Cialdini, R. B., & Griskevicius, V. (2008). A room with a viewpoint: Using social norms to motivate environmental conservation in hotels. Journal of Consumer Research, 35(3), 472-482. https://doi.org/10.1086/586910

White, K., Habib, R., & Hardisty, D. J. (2019). How to SHIFT consumer behaviors to be more sustainable: A literature review and guiding framework. Journal of Marketing, 83(3), 22-49. https://doi.org/10.1177/0022242919825649

What the MKT 345 Module 6 instructions ask for

The persuasion or attitude change assignment in MKT 345 commonly asks you to design a marketing communication or campaign intended to change consumers' attitudes or behavior, using theories of attitude formation, persuasion and social influence. A strong paper defines the target behavior precisely, identifies what beliefs, habits and situations sustain the current behavior, chooses persuasion approaches with research behind them, writes actual messages and places them where the behavior happens, then plans how to measure change. It avoids relying on information alone, since people often know what to do and still do not do it, and it considers whether the campaign could backfire. Explaining why a message should work, not just what it says, is where the marks are.

How this MKT 345 Module 6 persuasion campaign assignment example is built

The sample targets Second Chapter Thrift's donors, since about 60 percent of donated goods cannot be sold and handling them costs $180,000 a year. The behavior to change is donating unsellable items, such as stained clothing and broken housewares, and the goal is more clean, complete, wearable donations, especially from young adults. Messages use descriptive social norms on drop-off signs, a "one in, one out" prompt to build a habit, a tangible tally of what a good bag funds and thank-you texts. Goldstein, Cialdini and Griskevicius's hotel experiments, Cialdini and Goldstein's review of social influence and White, Habib and Hardisty's SHIFT framework guide the design, tested across two drop-off sites.

Where the MKT 345 Module 6 rubric puts the points

Persuasion campaigns are usually assessed on the precision of the target behavior, the analysis of what sustains current behavior, the theoretical grounding of the persuasion approach, the quality and placement of messages and the evaluation plan, plus writing. Strong papers write real messages, explain why each should work using research, place them at the moment of behavior and test them with comparison groups. Marks fall for campaigns that only inform, for vague goals such as "raise awareness," for messages that could shame or backfire and for no measurement. Instructors also credit papers that weigh ethical concerns, such as respecting donors' goodwill while asking them to change.

MKT 345 Module 6 help: the mistakes that cost points

Define the behavior you want to change in observable terms, such as the share of donated items that can be sold. Ask why people behave as they do now: what they believe, what they assume others do and what situation they are in at the moment. Choose approaches with evidence, such as describing what most people do, building small habits or showing tangible results. Write the messages and decide exactly where and when people will see them. Check whether a message could annoy or shame. Then design a test with a comparison group and a clear measure of success. Pretest messages with a handful of real people before the campaign starts.

Get MKT 345 Module 6 written to your instructions

Upload the MKT 345 Module 6 instructions and the behavior you want consumers to change. We identify the beliefs and situations behind it, build messages on social norms, habits and identity, place them at the right moments and design a fair test. A first persuasion campaign is free and normally takes two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 345 papers and related BS Marketing samples

MKT 345 Module 6 questions, answered

Where can I find a free MKT 345 Module 6 Persuasion Campaign Assignment sample?

The complete MKT 345 Module 6 persuasion campaign is on this page, using social norms and habits to improve thrift store donations.

What are descriptive social norms?

Information about what most people actually do, which tends to guide behavior because people look to others to decide what is normal and correct.

Do social norm messages change behavior?

Field experiments in hotels found that telling guests most others reused towels increased reuse more than environmental appeals, especially when the norm matched the guest's situation.

Why do information campaigns often fail to change behavior?

People often already know what they should do; habits, situations and what others do shape behavior more than additional facts.

How can a campaign build a new consumer habit?

By linking the behavior to a regular cue, making it easy and giving prompt feedback so that it repeats until it becomes automatic.