MKT 345 Module 2 Shopper Profile Assignment Example

Reviewed by Portia Lambrick, MBA

This MKT 345 Module 2 Shopper Profile Assignment sample describes the distinct groups of consumers who shop at one retailer and explains what drives each. SNHU MKT 345 (MKT-345) asks BS Marketing students to profile consumers using demographic, behavioral and psychological characteristics. Second Chapter Thrift, a composite four-store charity thrift chain in Greensboro, North Carolina, surveyed 410 shoppers and linked their answers to loyalty-card purchases. The paper identifies four segments, compares their size, spending, visits and motives, explains each with research on second-hand shopping and shopping value and ends with what each segment needs from the stores, including where those needs collide.

CourseMKT 345 Consumer Behavior
ModuleModule 2
Paper typeundergraduate assignment profiling consumer segments by motives, demographics and behavior
LengthAbout 1,000 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Marketing
UpdatedOctober 2026

Free sample paper for MKT 345 Module 2

1

Budget Stretchers, Treasure Hunters, Values Shoppers and Resellers: A Shopper Profile for Second Chapter Thrift

[Student Name]

Southern New Hampshire University

MKT 345: Consumer Behavior

Shopper Profile Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingSecond Chapter Thrift, its survey and its segments are invented for teaching.
2

Budget Stretchers, Treasure Hunters, Values Shoppers and Resellers: A Shopper Profile for Second Chapter Thrift

Introduction

Second Chapter Thrift operates four charity thrift stores in Greensboro, North Carolina, selling donated goods to fund adult literacy programs. Its sales of about $3.4 million come from roughly 410,000 purchases a year. Managers have long described their customers as "people looking for a deal," but the stores serve visibly different shoppers. This paper profiles them using a survey of 410 customers taken at all four stores in September and linked, with permission, to their loyalty-card purchases over the previous year.

What this page is doingStates the purpose of the profile.
3

Data and Measures

Shoppers were invited at checkout on varied days and times, and 410 of about 900 approached completed the survey. Motives were measured with items adapted from two tested scales. The first was the second-hand motivation scale of Guiot and Roux (2010), whose three families of reasons cover saving money, the pleasures of searching and remembering and objections to waste and mainstream retail. Babin et al. (1994) built the second, which separates the practical payoff of a trip from the fun of it. Shoppers were grouped by their strongest motives, and resellers were identified by a direct question and confirmed by purchase patterns.

What this page is doingExplains how segments were found.
4

The Four Segments

Shopper segments

SegmentShare of shoppersVisits per monthAverage spend per visitShare of sales
Budget stretchers38 percent4.1$11.2041 percent
Treasure hunters29 percent2.6$9.4017 percent
Values-driven shoppers24 percent1.8$14.6015 percent
Resellers9 percent4.2$31.0027 percent

Resellers are few but account for more than a quarter of sales, while treasure hunters are numerous but spend least.

What this page is doingCompares size, spending and visits.
5

Budget Stretchers

Budget stretchers are mostly over 45, many retired or working hourly jobs, and they come weekly, often on discount-tag days. Their strongest motives are economic, and their shopping value is mainly utilitarian: they want children's clothes, kitchen goods and household basics, found quickly and priced fairly. They notice price increases immediately; when one store raised clothing prices by 50 cents last spring, their visits there fell by about one in eight.

What this page is doingDescribes the largest group.
6

Treasure Hunters

Treasure hunters are mostly under 35, many of them students. They browse for 40 minutes or more, buy one or two items and often post photos of what they found. Their motives are recreational: the hunt, originality and the story behind an object. Several said they choose thrift over fast-fashion chains partly because "nobody else will have it." Arnold and Reynolds (2003) identified six hedonic shopping motivations, among them adventure shopping, the excitement of discovery, and idea shopping, keeping up with trends; treasure hunters score highest on both. Their hedonic value is high even when they buy nothing, which is why they return.

What this page is doingExplains the browsers.
7

Values-Driven Shoppers

Values-driven shoppers come to keep goods out of landfills and support the literacy mission. They score highest on Guiot and Roux's critical motives, spend more per visit than other non-resellers and are the most likely to donate as well as buy. Many said they would shop more often if the stores told them more about how their purchases helped learners. Few knew, for example, that a $20 purchase pays for a week of workbooks for one adult student.

What this page is doingExplains the mission-minded.
8

Resellers

Resellers visit most often, usually at opening, and buy books, brand-name clothing and electronics to resell online. They value speed and stock turnover. Other shoppers, especially treasure hunters, resent them; in open comments, 61 respondents complained that "the good stuff is gone by ten." Staff are divided too. Some see resellers as the stores' most reliable customers, buying items that might otherwise sit for weeks; others see them as taking bargains meant for families who need them. The charity's mission, adult literacy rather than cheap goods for low-income families, means that reseller purchases serve the mission as well as any other sale, but the resentment is real and affects how other segments feel about the stores.

What this page is doingDescribes a small, valuable and controversial group.
9

Shopping as Experience

The shopping value items show how differently the segments experience the same store. Budget stretchers scored highest on utilitarian value and lowest on hedonic value: for them a good trip is a quick one with the right things at the right price. Treasure hunters reversed that pattern, rating the trip itself as the main reward. Values-driven shoppers scored moderately on both but highest on feeling good about where their money went. Resellers scored high on utilitarian value and low on everything else, treating the store as a supplier. These differences suggest that one store layout cannot please everyone equally; the question is how to give each group enough of what it values without spoiling the experience for the others.

What this page is doingCompares the value each segment takes away.
10

Overlap

About a third of respondents scored high on motives from more than one group. Many treasure hunters also care about sustainability, and some budget stretchers enjoy the hunt. The segments describe the main reason for most visits, not permanent identities.

What this page is doingNotes that shoppers are not fixed types.
11

What Each Segment Needs

Needs by segment

SegmentNeeds from the stores
Budget stretchersStable prices, clear sizing, quick checkout, discount-tag days
Treasure huntersFresh stock through the day, interesting displays, permission to photograph
Values-driven shoppersVisible stories of the mission, easy donation drop-off
ResellersPredictable restocking; they buy whatever is put out

The needs conflict. Putting all new stock out at opening rewards resellers and frustrates treasure hunters; raising prices to capture reseller margins hurts budget stretchers.

What this page is doingDraws implications.
12

Limitations

The survey reached people who were buying, not those who browsed and left, so treasure hunters who leave empty-handed are probably undercounted. A short exit survey of non-buyers on a few days would fill that gap. Shoppers without loyalty cards could not be linked to purchases, and resellers may have underreported their reselling.

What this page is doingNotes what the profile cannot show.
13

Conclusion

Second Chapter Thrift serves four different consumers with four different reasons for coming through the door. The largest group needs low, steady prices; the youngest needs a reason to keep hunting; the mission-minded need to see their impact; and the smallest group buys the most. The rest of the course will ask how the stores can serve them without letting one crowd out another.

What this page is doingSums up.
14

References

Arnold, M. J., & Reynolds, K. E. (2003). Hedonic shopping motivations. Journal of Retailing, 79(2), 77-95. https://doi.org/10.1016/S0022-4359(03)00007-1

Babin, B. J., Darden, W. R., & Griffin, M. (1994). Work and/or fun: Measuring hedonic and utilitarian shopping value. Journal of Consumer Research, 20(4), 644-656. https://doi.org/10.1086/209376

Guiot, D., & Roux, D. (2010). A second-hand shoppers' motivation scale: Antecedents, consequences, and implications for retailers. Journal of Retailing, 86(4), 355-371. https://doi.org/10.1016/j.jretai.2010.08.002

What the MKT 345 Module 2 instructions ask for

The consumer profile assignment in MKT 345 generally asks you to describe the target consumers of a business or brand, using demographic, psychographic and behavioral information, and to explain the influences on their buying. A strong paper uses real or realistic data, distinguishes segments by why and how people buy rather than by age alone, measures motives with tested items where possible, compares segments on size and value to the business and explains each with consumer behavior research. It ends with what each segment needs, because a profile is only useful if it shapes decisions, and it notes where segments overlap rather than pretending every shopper fits one box.

How this MKT 345 Module 2 shopper profile assignment example is built

The sample profiles Second Chapter Thrift's shoppers from a survey of 410 customers linked to loyalty-card purchases. Budget stretchers, 38 percent of shoppers, visit weekly and buy necessities. Treasure hunters, 29 percent and mostly under 35, browse longest, spend least per visit and post their finds online. Values-driven shoppers, 24 percent, come to reduce waste and support literacy. Resellers, 9 percent, spend most per visit, mainly on books, brand-name clothing and electronics. Motives were measured with items adapted from Guiot and Roux's second-hand scale and Babin, Darden and Griffin's shopping value scale, and Arnold and Reynolds's hedonic motivations help explain the treasure hunters. It closes by showing where the segments' needs conflict.

Where the MKT 345 Module 2 rubric puts the points

Consumer profiles are commonly graded on the quality of the data and segmentation, the depth of psychographic and behavioral description, the use of consumer behavior concepts and research, the implications for marketing and writing. Strong papers define segments by motives and behavior, quantify each segment's size and value, connect motives to tested measures and draw clear implications. Marks fall for profiles based on demographics alone, for invented personas without data, for concepts named but not applied and for implications that would fit any business. Instructors also credit papers that acknowledge overlap between segments and the limits of a single survey. Showing each segment's share of sales as well as its share of shoppers reveals where value lies.

MKT 345 Module 2 help: the mistakes that cost points

Gather what you can: a survey, purchase data, observation or published studies of similar customers. Group consumers by why and how they buy, then check whether the groups also differ in age, income or spending. Use items from tested scales to measure motives rather than inventing questions. For each segment, report size, spending, visit frequency and main motives. Explain each with research. Then ask what each needs from the business and where needs conflict. Note how many shoppers fit more than one segment. Keep tables simple so the comparisons are easy to see. Ask how a change aimed at one segment would affect each of the others.

Get MKT 345 Module 2 written to your instructions

Upload the MKT 345 Module 2 instructions and any data you have on the customers you are profiling. We define segments by motives and behavior, compare their size and value, explain each with consumer research and spell out what each needs. A first profile is free and normally takes two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 345 papers and related BS Marketing samples

MKT 345 Module 2 questions, answered

Where can I find a free MKT 345 Module 2 Shopper Profile Assignment sample?

A complete MKT 345 Module 2 shopper profile is on this page, describing four segments of thrift store customers.

What is a consumer profile?

A description of a target group of consumers covering who they are, how they buy and why, used to guide marketing decisions.

What is psychographic segmentation?

Grouping consumers by motives, values, attitudes and lifestyles rather than only by age, income or location.

How do you measure shopping motives?

With survey items adapted from tested scales, such as scales of hedonic and utilitarian shopping value or second-hand shopping motives.

Can a customer belong to more than one segment?

Yes; many shoppers share motives, so segments describe the main reason for most visits rather than fixed types.