| Course | MKT 345 Consumer Behavior |
|---|---|
| Module | Module 5 |
| Paper type | undergraduate milestone recommending marketing strategies based on situational, social and perceptual influences |
| Length | About 1,020 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Marketing |
| Updated | October 2026 |
Free sample paper for MKT 345 Module 5
Fresh Racks, Clean Signals and a Quick-Shop Zone: Consumer-Based Store Strategy for Second Chapter Thrift
[Student Name]
Southern New Hampshire University
MKT 345: Consumer Behavior
Milestone Two: Consumer-Based Strategy
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Fresh Racks, Clean Signals and a Quick-Shop Zone: Consumer-Based Store Strategy for Second Chapter Thrift
Introduction
Earlier work produced four segments, a young shopper's journey settled in the aisle and broadcast online, grumbling that the best finds vanish within an hour of opening and a belief among non-shoppers that secondhand goods are unclean. This milestone recommends five changes to the store environment and in-store experience, each tied to a segment and an influence. Because the charity has little capital, each change relies on staffing, signs and layout rather than renovation, and each will be tested in the largest store before reaching the other three.
Recommendation 1: Restock Through the Day
At present, most new stock goes out before opening, when resellers arrive first. The stores will instead put out new racks at 10 a.m., noon, 3 p.m. and 5 p.m., with a small board by the entrance showing the next restock time. Inman et al. (2009), analyzing 2,300 shoppers in 28 stores, found that time spent in the store and the number of aisles visited raised the probability of unplanned purchases. Restocking through the day gives treasure hunters reasons to return and to stay longer, and it spreads the best items across the day so that resellers cannot clear them in the first hour.
Recommendation 2: Clean Signals
Every garment is already washed or steamed, but nothing says so. Each rack will carry a small sign, "Washed or steamed before it reached this rack." Racks will be spaced so shoppers can see items without handling dozens; aisle bins will be removed; fluorescent tubes will be replaced with brighter, warmer LEDs; and a fresh-laundry scent will be used near the entrance. Argo et al. (2006) showed shoppers marking products down in their minds once something reminded them that strangers had handled the items. Reducing the cues of handling and adding cues of cleaning addresses the perception without arguing with it.
Recommendation 3: A Quick-Shop Zone
Budget stretchers want essentials quickly. A quick-shop zone near the entrance will hold sorted children's clothing by size, kitchen basics and seasonal necessities, with clear prices and a second register during busy hours. Bitner (1992) described how layout and functionality, along with ambient conditions and signs, shape customers' responses to a service setting. A layout that lets budget stretchers find what they need in ten minutes serves their utilitarian goals without disturbing the browsing areas.
Recommendation 4: A Mirror and Photo Corner
The decision analysis found that treasure hunters often shop in pairs, ask friends for approval and photograph finds before paying. A well-lit corner near the clothing racks will have a full-length mirror, a simple backdrop with the store's name and a sign inviting shoppers to tag the store. This supports the social decision and turns posts into free word of mouth.
Recommendation 5: Mission Signs at the Register
Values-driven shoppers said they would shop more if they knew how purchases helped learners. Signs at each register will translate spending into impact, such as "Your $20 buys a week of workbooks for an adult learner," with a quarterly story from a learner, told in the learner's own words and with permission.
Staff and Volunteer Roles
Most of the changes depend on people rather than money. Restocking four times a day requires moving one sorting volunteer to the sales floor at each restock and training cashiers to announce new racks. The clean-signals program depends on keeping aisles clear, so the store manager will walk the floor at each restock and remove any bin left out. The photo corner needs only occasional tidying. The mission signs require the charity's program staff to supply a new learner story each quarter. A short briefing for all staff and volunteers before the test will explain why each change is being made, so that people who have worked in the stores for years understand that the aim is to serve different shoppers better, not to criticize how things have been done.
What Not to Change
Some features stay as they are. Prices will not rise during the test, since budget stretchers react quickly to increases. The weekly discount-tag day, which draws large crowds, will continue. And the stores will not ban resellers or limit purchases, which would be hard to enforce and might push away some of the most reliable buyers; restocking through the day addresses the frustration without targeting anyone.
Conflicts Between Segments
Expected effects by segment
| Change | Budget stretchers | Treasure hunters | Values-driven | Resellers |
|---|---|---|---|---|
| Restock through the day | Neutral | Strongly positive | Neutral | Negative at opening; positive overall |
| Clean signals | Positive | Mixed; some like chaos | Positive | Neutral |
| Quick-shop zone | Strongly positive | Neutral | Neutral | Neutral |
| Photo corner | Neutral | Strongly positive | Mildly positive | Neutral |
| Mission signs | Neutral | Mildly positive | Strongly positive | Neutral |
The main risk is that a tidier store dulls the treasure hunt. The plan keeps a "just in" rack deliberately varied and unsorted by style, so that discovery remains part of the visit.
Testing the Changes
All five changes will run for eight weeks in the largest store, while the other three continue as before. Each week, the test store's sales, transaction count, average ticket, loyalty visits by segment and tagged posts will be set against last year's same weeks and against the three unchanged stores. Success means higher transactions and loyalty visits without a drop among budget stretchers. A short exit question on two days each week will also ask shoppers whether the store felt cleaner, busier or easier to shop than before.
Budget
Signs and the photo corner cost about $1,800, LED lighting for one store about $4,200 and extra restocking labor about $260 a week during the test. The full cost of the eight-week test is under $8,200.
Conclusion
Each change answers something consumers said or did: the hunt, the fear of dirt, the hurried parent, the shopping pair and the mission. Testing them in one store first protects a small charity's budget and shows which changes earn a place in all four. If the test succeeds, the cheapest changes, restocking times, signs and the photo corner, can reach the other stores within a month, with lighting following as money allows.
References
Argo, J. J., Dahl, D. W., & Morales, A. C. (2006). Consumer contamination: How consumers react to products touched by others. Journal of Marketing, 70(2), 81-94. https://doi.org/10.1509/jmkg.70.2.081
Bitner, M. J. (1992). Servicescapes: The impact of physical surroundings on customers and employees. Journal of Marketing, 56(2), 57-71. https://doi.org/10.1177/002224299205600205
Inman, J. J., Winer, R. S., & Ferraro, R. (2009). The interplay among category characteristics, customer characteristics, and customer activities on in-store decision making. Journal of Marketing, 73(5), 19-29. https://doi.org/10.1509/jmkg.73.5.19
What the MKT 345 Module 5 instructions ask for
Milestone Two in MKT 345 usually asks you to recommend marketing strategies for your organization based on your analysis of consumer behavior: how to respond to the influences on your target consumers' decisions, including perception, motivation, social influence and situational factors. A strong milestone links each recommendation to a specific finding about a segment and an influence, describes the change concretely, explains with research why it should work, considers how other segments will react and proposes a way to test it before rolling it out everywhere. Recommendations should be within the organization's means; a charity retailer cannot remodel four stores at once, but it can change how it stocks and signs them.
How this MKT 345 Module 5 milestone two example is built
The sample proposes five changes for Second Chapter Thrift. Restocking four times a day keeps treasure hunters' hunt rewarding and stops resellers clearing the best items at opening. A clean-signals program, with washing signs, spaced racks, brighter light and cleared aisles, counters the perception that used goods are dirty. A quick-shop zone near the entrance serves budget stretchers. A mirror and photo corner supports shoppers who decide with friends and post their finds. Mission signs at the register speak to values-driven shoppers. Each change is tied to a segment and an influence and tested in one store first, drawing on Bitner, on Inman, Winer and Ferraro and on Argo, Dahl and Morales. A table shows how each change is likely to affect every segment.
Where the MKT 345 Module 5 rubric puts the points
Graders follow the thread from consumer analysis to each recommendation, the specificity and feasibility of strategies, the use of consumer behavior research, attention to different segments and the plan to evaluate results, along with writing. Top milestones tie every action to a finding and an influence, describe exactly what will change, explain why it should work, anticipate side effects on other segments and plan a test. Marks drop for generic strategies such as "improve customer experience," for recommendations not grounded in the earlier analysis, for ignoring conflicts between segments and for plans with no measures. A realistic budget earns credit.
MKT 345 Module 5 help: the mistakes that cost points
List the key findings from your segment profile and decision analysis. For each, ask what influence is at work and what the business could change to work with it: the environment, the timing, the signs, the social setting. Describe each change concretely enough that a manager could do it on Monday. Use research to say why it should work. Then check every change against your other segments; a fix for one group can annoy another. Pick a store, a time period or a group for a test, and decide in advance what results would justify rolling the change out. Write down what result would make you abandon a change, as well as what would justify keeping it.
Get MKT 345 Module 5 written to your instructions
Bring the MKT 345 Milestone Two guidelines with your segment and decision-process analysis. We turn the influences you found into specific strategies, tie each to a segment, flag conflicts between segments and plan a fair test. We do not charge for a first Milestone Two, and most come back on the second day. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 345 papers and related BS Marketing samples
- MKT 345 Module 1 Discussion: Why People Shop Thrift
- MKT 345 Module 2 Shopper Profile Assignment: Four Kinds of Thrift Shopper
- MKT 345 Module 3 Milestone One: The Treasure Hunter's Decision Journey
- MKT 345 Module 4 Discussion: The Problem With Things Others Touched
- MKT 345 Module 6 Persuasion Campaign Assignment: Changing How People Donate
- MKT 345 Module 7 Final Project: The Consumer Behavior Analysis and Strategy
- MKT 345 Module 8 Discussion: What the Test Store Taught Us
- HRM 225 Module 3 Milestone One: Lining HR Up With the Strategic Plan
- QSO 370 Module 1 Discussion: What Prediction Could Do for an Oil Dealer
- OL 324 Module 2 Cost of Quality Assignment: Measuring the Cost of Quality
- SPT 208 Module 1 Discussion: Why a Race Is Not a Jacket
MKT 345 Module 5 questions, answered
Where can I find a free MKT 345 Module 5 Milestone Two sample?
You can read the whole MKT 345 Module 5 Milestone Two here: store environment strategies for a thrift chain, each tied to a shopper segment.
How can a store environment change consumer behavior?
Layout, lighting, smell, crowding and signs shape how customers feel and act, including how long they stay, what they notice and what they buy.
What makes shoppers buy things they did not plan to?
Research on in-store decisions finds displays, time in the store and visiting more aisles raise unplanned purchases, while lists and quick trips lower them.
How should retailers handle conflicting customer segments?
Identify where segments' needs clash, design changes that serve one without harming the others and test them before rolling them out.
How do you test a store change fairly?
Make the change in one store and compare its results over the same weeks with similar stores that did not change.