MKT 678 Module 6 Milestone Two Example

Reviewed by Portia Lambrick, MBA

This MKT 678 Module 6 Milestone Two sample turns a brand positioning into the elements and marketing program that will build its equity. SNHU MKT 678 (MKT-678) asks MBA in Marketing students to design this program from their positioning. The brand is Arrowhead Woolen Mills, a composite Duluth wool maker positioned on "Warmth, made to last." The milestone restores a single heritage logo, cuts the product line by about 40 percent, holds blanket prices flat, turns free lifetime repairs into a named program and opens the mill to visitors and cameras, drawing on research on heritage and retro brands, with a budget and measures for each element.

CourseMKT 678 Brand Management
ModuleModule 6
Paper typegraduate milestone designing the brand elements and marketing program that will build a brand's equity around its positioning
LengthAbout 1,000 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMBA in Marketing
UpdatedOctober 2026

Free sample paper for MKT 678 Module 6

1

A Heritage Revival Without a Costume: The Brand Program for Arrowhead Woolen Mills

[Student Name]

Southern New Hampshire University

MKT 678: Brand Management

Milestone Two: Brand Elements and Marketing Program

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe logo history, product counts, budget and targets are fictional.
2

A Heritage Revival Without a Costume: The Brand Program for Arrowhead Woolen Mills

Introduction

The positioning from Milestone One speaks to people who buy fewer, better things and rests on three points of difference, lasting warmth, the Duluth mill and lifetime repairs, summed up as "Warmth, made to last." This milestone designs the brand elements and the marketing program that will make those associations stronger and more visible, with a budget and measures.

What this page is doingLinks the program to the positioning.
3

Brand Elements

The audit found four logos in use. The program restores one: the 1950s arrowhead with "Arrowhead Woolen Mills, Duluth" set beneath it, drawn from the mark on the mill's oldest labels. It retires the 1990s script, the simplified web mark and the label stamp over eighteen months as stock is used up. The red and black camp plaid, the most recognized element in the audit, becomes the brand's signature color system, used on packaging, hang tags and store fixtures in a single specified weave and shade. The word "Duluth" appears on every label, because the mill is a point of difference and the place makes it concrete.

What this page is doingChooses the name, mark and colors.
4

Heritage as Evidence

Urde et al. (2007) described heritage brands as those whose identity rests on a track record, longevity, core values, the use of symbols and a history that the organization treats as important to who it is. They stressed that heritage is a resource to be managed, not a past to be displayed. For Arrowhead, the track record is concrete: blankets from the 1940s still in use, a mill that has run through the Depression and two world wars and families who have bought from it for four generations. The program uses this history as proof of the promise, never as nostalgia for its own sake.

Brown et al. (2003), studying revived brands such as the Volkswagen New Beetle, found that retro brands draw strength from an allegory, an aura of authenticity, an idealized community or place and the tension between old and new, and that this tension must be managed rather than resolved. Arrowhead's younger buyers want the old mark and the old plaid, but they also want sizes that fit today, easy online returns and photographs that look like their own lives. The program keeps the mark and the weave old while letting fit, service and photography be current.

What this page is doingApplies heritage brand research.
5

Product

The line will be cut from 640 items to about 380. Every item must pass the mantra: it must be wool or wool-led, warm and built to last. The 200 slow sellers identified in the audit go first, along with fashion items in synthetic fabrics. The cut removes about $5.2 million in sales at lower than average margins, which the company expects to recover partly through higher sales of core items and lower inventory costs. The mill will add heavier base layers, as recommended in Module 4, and a "Mill Run" line of limited weaves made from each season's surplus yarn, sold only in company stores and online.

What this page is doingShapes the line around the mantra.
6

Price

Prices on blankets will be held flat for two years, after a five-year rise of 31 percent strained older buyers. Apparel prices will move only with costs. The company will end storewide percentage-off sales, which it has run four times a year, because frequent discounts undercut the claim that the goods are worth their price. In their place, the Mill Run line gives price-sensitive buyers a lower-cost entry that is still made at the mill.

What this page is doingProtects value without discounting.
7

Channels

The Duluth flagship, beside the mill, will add a viewing window onto the weaving floor and free guided tours twice a day in summer. The company will reduce department store accounts that sell Arrowhead mainly on discount and invest in its best outdoor and independent accounts with fixtures that show the plaid and the mill. The website will add the repair program, a mill page and photographs of real customers with their oldest Arrowhead pieces.

What this page is doingShows the brand where it is made.
8

Communication

Keller (1993) argued that brand equity grows when marketing builds strong, favorable and unique associations, and that associations formed from direct experience and credible sources are stronger than those from advertising claims alone. Communication therefore centers on evidence. The weavers, the looms and the repair bench become the main subjects of photography and short films. The repair program is named "Kept Warm" and announced to every past buyer on file. The catalog will include one long story per issue about a blanket returned for repair after decades of use, shared with the owner's permission. The agency's stock mountain photography ends.

What this page is doingProves rather than claims.
9

Trade-offs

The program costs more than its budget line. Cutting about 260 items removes roughly $5.2 million in annual sales, and some loyal customers will miss particular products; the company will tell them a year ahead and offer the closest wool alternative. Ending storewide sales will reduce traffic in the four weeks a year when those sales ran, and the Mill Run line will offset only part of it. Reducing department store accounts that sell mainly on discount gives up about $2.4 million in wholesale revenue. Against these losses stand higher margins on the remaining line, lower inventory costs and, most important, a brand that presents one meaning everywhere it appears. The company will track net revenue monthly in the first year and will slow the pruning if core-item sales do not rise to offset at least half of the lost revenue within twelve months.

What this page is doingNames what the program gives up.
10

Budget and Measures

Program budget and measures, first year

ElementCostMeasureTarget
Logo and packaging transition$340,000Logo recognition in survey70% of buyers recognize the restored mark
Product line reduction$280,000 (write-downs)Sales per item; inventory turnsTurns up 25%
Kept Warm repair program$260,000Repairs requested; awarenessAwareness from 11% to 40%
Mill window and tours$410,000Visitors; tour-to-purchase rate18,000 visitors
Photography and films$520,000Association of "made in Duluth"Strong among 50% of under-35s
Retailer fixtures$90,000Sell-through at top accountsUp 15%
Total$1,900,000

The next brand audit, in twelve months, will repeat the association survey and show whether the program has moved the associations the positioning depends on.

What this page is doingSets cost and checks.
11

References

Brown, S., Kozinets, R. V., & Sherry, J. F., Jr. (2003). Teaching old brands new tricks: Retro branding and the revival of brand meaning. Journal of Marketing, 67(3), 19-33. https://doi.org/10.1509/jmkg.67.3.19.18657

Keller, K. L. (1993). Conceptualizing, measuring, and managing customer-based brand equity. Journal of Marketing, 57(1), 1-22. https://doi.org/10.1177/002224299305700101

Urde, M., Greyser, S. A., & Balmer, J. M. T. (2007). Corporate brands with a heritage. Journal of Brand Management, 15(1), 4-19. https://doi.org/10.1057/palgrave.bm.2550106

What the MKT 678 Module 6 instructions ask for

Milestone Two in MKT 678 commonly asks you to design the brand elements and marketing program that will build equity around your positioning. Expect to choose or revise the brand's name, logo, symbols, colors and other elements, then plan the product, pricing, distribution and communication decisions that will strengthen the associations you chose. Strong milestones show how each element and program decision supports a point of difference or point of parity, use research on brand building rather than general marketing advice and recognize trade-offs, such as dropping profitable products that dilute the brand. They set a budget and say how the effect of each part will be measured.

How this MKT 678 Module 6 milestone two example is built

The sample designs the marketing program for Arrowhead Woolen Mills, a composite Duluth wool maker positioned on "Warmth, made to last." It restores the 1950s arrowhead mark as the only logo, retires three others and standardizes the red and black plaid. It cuts the product line from 640 to about 380 items, holds blanket prices flat for two years, names the lifetime repair program "Kept Warm" and opens the mill for tours and filming. Urde, Greyser and Balmer's account of heritage brands, Brown, Kozinets and Sherry's study of retro branding and Keller's model of brand knowledge support the choices, and a $1.9 million budget with measures for each element completes the milestone.

Where the MKT 678 Module 6 rubric puts the points

The second MKT 678 milestone is generally graded on the choice and justification of brand elements, the alignment of product, price, channel and communication decisions with the positioning, the use of brand research, the recognition of trade-offs, and a budget and measures, along with citations and organization. Good submissions show for every decision which association it builds and how that will be checked. Submissions lose credit for listing marketing activities without tying them to the positioning, redesigning a logo for its own sake, ignoring the cost of pruning products, treating heritage as decoration rather than evidence or offering no way to tell whether the program worked. Showing what the program gives up earns credit.

MKT 678 Module 6 help: the mistakes that cost points

Begin with your positioning and list the associations you need to build or protect. Review the brand's elements: is there one recognizable logo, color or symbol, and does it carry the meaning you want? Then go through the program. Which products support the positioning and which dilute it? Does pricing fit the target's sense of value? Do channels show the brand at its best? What will communication show as proof, not only claim? For each decision, name the association it supports. Note the trade-offs honestly, including revenue you will give up. Set a budget, assign owners and choose a measure for each part so the next audit can show what changed.

Get MKT 678 Module 6 written to your instructions

Send the brief for Milestone Two in MKT 678 and your positioning. We choose the brand elements, shape the product, price, channel and communication program around the positioning, ground each choice in brand research and set a budget and measures. The first MKT 678 brand program milestone is prepared at no cost, usually within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 678 papers and related MBA in Marketing samples

MKT 678 Module 6 questions, answered

Where can I find a free MKT 678 Module 6 Milestone Two sample?

Read the complete MKT 678 Milestone Two here, covering brand elements and a marketing program for a composite Duluth wool maker, with budget and measures.

What are brand elements?

The trademarkable devices that identify a brand, such as its name, logo, symbols, colors, packaging, slogans and characters.

What is a heritage brand?

A brand whose history, longevity, core values and symbols are part of its identity and are used as evidence of what it stands for today.

How do retro brands succeed?

Research on revived brands found they draw on allegory, aura, an idealized past and the tension between old and new, which must be managed rather than resolved.

Should a brand cut products that sell?

Sometimes. Items that dilute the brand's meaning can cost more in equity than they earn, though the trade-off should be estimated rather than assumed.