| Course | MKT 678 Brand Management |
|---|---|
| Module | Module 5 |
| Paper type | graduate assignment recommending a brand architecture for a company's portfolio, including what to do with an acquired brand |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MBA in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 678 Module 5
What to Do With Ridgeline: A Brand Architecture Recommendation for Arrowhead Woolen Mills
[Student Name]
Southern New Hampshire University
MKT 678: Brand Management
Brand Architecture Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
What to Do With Ridgeline: A Brand Architecture Recommendation for Arrowhead Woolen Mills
Introduction
Four years after buying Ridgeline, the board must decide how it fits with the parent company. Ridgeline makes synthetic insulated jackets and rain shells, sells about $14 million a year through outdoor specialty stores and is growing at 18 percent a year. Arrowhead's own outerwear, heavy wool coats and shirt jackets, sells about $21 million and is flat. The board has heard three proposals: rename Ridgeline as Arrowhead, call it "Ridgeline by Arrowhead" or leave it alone. This paper sets out the options, evaluates them and recommends an architecture.
The Portfolio Today
Current portfolio
| Brand | Products | Sales | Typical buyer | Main channels |
|---|---|---|---|---|
| Arrowhead | Wool blankets, shirts, coats, accessories | $86 million | Two groups: loyal buyers over 55; heritage buyers under 35 | Company stores, website, outdoor and department stores, Japan |
| Ridgeline | Synthetic insulated jackets, rain shells, fleece | $14 million | Active outdoor buyers, average age 31 | Outdoor specialty stores, website |
At present the two brands share nothing visible to customers. Ridgeline's labels, website and social media make no mention of Arrowhead. Behind the scenes they share a warehouse, a customer service team and a finance department.
The Options
Aaker and Joachimsthaler (2000) arranged architecture choices along a brand relationship spectrum. At one end is a house of brands, in which each brand stands alone, as Ridgeline does now. Next come endorsed brands, which stand alone but carry the parent's name as a guarantee. Then sub-brands, in which the master brand is the main driver and a second name adds a distinction. At the far end is a branded house, in which one master name covers everything. They argued that the right place on the spectrum depends on whether the master brand contributes associations that help the offering, whether linking would harm the master brand and whether the offering needs its own identity.
Four options
| Option | What customers would see |
|---|---|
| A. House of brands (status quo) | Ridgeline alone; no Arrowhead name |
| B. Endorsed brand | "Ridgeline" with "by Arrowhead Woolen Mills" on hang tags and website |
| C. Sub-brand | "Arrowhead Ridgeline" as a technical line under the master brand |
| D. Branded house | Ridgeline products renamed as Arrowhead technical outerwear |
What Customers Believe
A survey of 600 outdoor buyers, half Ridgeline customers and half Arrowhead customers, asked how a link between the two would change their views. Among Arrowhead customers, 44 percent said that synthetic jackets under the Arrowhead name would make the brand "less special," and only 9 percent said it would make them more likely to buy. Among Ridgeline customers, 52 percent saw Arrowhead as "for older people" or "for the cabin," and 31 percent said an Arrowhead endorsement would make Ridgeline less appealing for technical use, while 22 percent liked the idea of a heritage maker behind it. The links run poorly in both directions: Arrowhead lends heritage that Ridgeline buyers do not seek, and Ridgeline lends performance and synthetics that clash with Arrowhead's positioning.
Protecting the Brand Concept
The concept-management view of Park et al. (1986) holds that once a brand's meaning is set, each later move should deepen it, and that moves which add a second meaning weaken the first. Arrowhead's concept, set in Milestone One, is lasting warmth made in a working mill. Synthetic shells made in Asian factories and redesigned every season are not wrong products; they are simply a different concept. Placing them under the Arrowhead name, as options C and D would do, asks one brand to stand for two ideas.
Branding Strategy and Value
The strongest argument for a branded house is efficiency. Rao et al. (2004), studying large U.S. firms, found that those following a corporate branding strategy, using one name across their businesses, were associated with higher Tobin's q, a measure of market value relative to the replacement cost of assets, while firms with mixed strategies were associated with lower values. The finding suggests that a strong master brand can be worth more when used widely. But it describes large firms on average, and it depends on the master brand's associations being useful across the portfolio. Arrowhead's associations are valuable precisely because they are specific. Spreading them over synthetics would test that finding in the conditions least likely to support it.
Scoring the Options
Option scores (1 = poor, 5 = strong)
| Criterion | A. Separate | B. Endorsed | C. Sub-brand | D. Branded house |
|---|---|---|---|---|
| Protects Arrowhead positioning | 5 | 3 | 2 | 1 |
| Helps Ridgeline with its buyers | 4 | 2 | 2 | 1 |
| Channel relationships | 5 | 4 | 3 | 2 |
| Marketing cost | 3 | 3 | 4 | 4 |
| Transition risk | 5 | 4 | 2 | 1 |
| Total | 22 | 16 | 13 | 9 |
The scores favor keeping the brands apart. Endorsement, the most common middle course, earns less than it seems: the survey shows the Arrowhead name is not a guarantee Ridgeline buyers want. Channel effects reinforce the result. Several outdoor specialty stores carry Ridgeline but not Arrowhead, and two have said they would reconsider if Ridgeline "turned into a heritage brand."
Recommendation
Arrowhead should keep a house of brands. Ridgeline remains a separate brand with its own name, design team, website and voice, and Arrowhead's products stay wool and stay true to "Warmth, made to last." The company should go further in sharing what customers never see: one warehouse, one customer service team with separate scripts, shared purchasing for packaging and shipping and a single finance and analytics function, which together should save about $600,000 a year. Arrowhead's own technical ambitions, such as the heavy base layers proposed in Module 4, stay within the wool concept and do not borrow from Ridgeline.
Implementation and Measures
No customer-facing change is needed, which is part of the recommendation's appeal. The work is internal: consolidating operations over twelve months, writing a short architecture policy that bars cross-branding without board approval and adding questions to the annual brand survey that track whether either brand's customers begin to associate it with the other. The board should revisit the decision if Ridgeline begins to use wool or if research shows Ridgeline buyers aging into the heritage segment, either of which could make an endorsement worth more than it is today.
References
Aaker, D. A., & Joachimsthaler, E. (2000). The brand relationship spectrum: The key to the brand architecture challenge. California Management Review, 42(4), 8-23. https://doi.org/10.2307/41166051
Park, C. W., Jaworski, B. J., & MacInnis, D. J. (1986). Strategic brand concept-image management. Journal of Marketing, 50(4), 135-145. https://doi.org/10.1177/002224298605000401
Rao, V. R., Agarwal, M. K., & Dahlhoff, D. (2004). How is manifest branding strategy related to the intangible value of a corporation? Journal of Marketing, 68(4), 126-141. https://doi.org/10.1509/jmkg.68.4.126.42735
What the MKT 678 Module 5 instructions ask for
The Module 5 assignment in MKT 678 usually asks you to analyze and recommend a brand architecture: how the brands, sub-brands and product names in a company's portfolio relate to one another and to the corporate name. Expect to describe the current portfolio, explain the main architecture options, such as a branded house, sub-brands, endorsed brands and a house of brands, and recommend one with reasons. Strong papers judge each option against the parent brand's positioning, evidence about what customers in each segment believe, channel relationships, costs and the risks of transferring or diluting associations. They also explain how the recommendation would be carried out, including names, logos, packaging and timing.
How this MKT 678 Module 5 brand architecture assignment example is built
The sample examines Arrowhead Woolen Mills, a composite Duluth wool maker whose positioning, "Warmth, made to last," centers on heavy wool goods made at its mill. In 2021 it bought Ridgeline, a synthetic outerwear brand that sells $14 million a year through outdoor specialty stores to buyers averaging 31 years old. The paper places four options on Aaker and Joachimsthaler's brand relationship spectrum, from a separate house of brands to renaming Ridgeline as Arrowhead, and scores them. Research by Rao, Agarwal and Dahlhoff on branding strategy and firm value and Park, Jaworski and MacInnis on brand concepts inform a recommendation to keep Ridgeline separate while sharing back-office operations.
Where the MKT 678 Module 5 rubric puts the points
Brand architecture papers in MKT 678 are generally graded on a clear map of the current portfolio, accurate explanation of architecture options, evaluation of options against positioning and customer evidence, attention to channels, costs and risks, a justified recommendation and an implementation plan, with sources and clarity. The best papers use a scoring table with stated criteria and show what each option would do to both brands' associations. Papers lose marks for recommending a branded house simply because it is cheaper, ignoring how each brand's customers see the other, overlooking channel conflict or recommending a change without saying what will happen to names, logos and packaging.
MKT 678 Module 5 help: the mistakes that cost points
List every brand and sub-brand in the portfolio with its sales, customers and channels. Place them on the relationship spectrum, from a house of fully separate brands to a single branded house. Identify three or four realistic options. For each, ask what associations would move between the brands, and whether that helps or hurts. Gather any evidence on how each brand's customers see the other. Consider channels, since retailers may react to a name change, and cost, including packaging and marketing. Score the options against stated criteria in a table. Recommend one, and explain how and when names, logos and packaging will change and how you will know it worked. Revisit the choice when either brand's customers or products change.
Get MKT 678 Module 5 written to your instructions
Share the MKT 678 Module 5 brief and the brands in your company's portfolio. We map them on the brand relationship spectrum, set out the realistic options, score each against positioning, customer evidence, channels and cost and recommend an architecture with the steps to put it in place. The first MKT 678 architecture paper is written free, usually within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 678 papers and related MBA in Marketing samples
- MKT 678 Module 1 Discussion: What Brand Equity Means
- MKT 678 Module 2 Brand Audit Assignment: Brand Inventory and Exploratory Audit
- MKT 678 Module 3 Milestone One: Brand Positioning
- MKT 678 Module 4 Discussion: Judging a Brand Extension
- MKT 678 Module 6 Milestone Two: Brand Elements and the Marketing Program
- MKT 678 Module 7 Discussion: Licensing and Brand Dilution
- MKT 678 Module 8 Brand Equity Measurement Assignment: Measuring Brand Equity
- MKT 678 Module 9 Discussion: Brand Crisis Response
- MKT 678 Module 10 Final Project: Brand Management Plan
- MGT 630 Module 9 Discussion: Do Safe Sites Build Better Buildings
- ACC 692 Module 10 Final Project: The Examination Report and the Legal Strategy
- MKT 675 Module 9 Discussion: Guilt Appeals and Vulnerable Consumers
- MKT 635 Module 6 Milestone Two: Paid Search Campaign Plan
MKT 678 Module 5 questions, answered
Where can I find a free MKT 678 Module 5 brand architecture sample?
This page includes the full MKT 678 Module 5 recommendation for a composite wool mill deciding how to handle an acquired outerwear brand.
What is brand architecture?
The structure that defines how a company's brands, sub-brands and product names relate to one another and to the corporate brand.
What is the brand relationship spectrum?
A framework by Aaker and Joachimsthaler that arranges options from a house of brands, through endorsed brands and sub-brands, to a branded house that uses one master name.
When should a company keep an acquired brand separate?
When the acquired brand's associations or customers conflict with the parent's positioning, so linking them would weaken one or both.
Does branding strategy affect firm value?
Research found that firms using a corporate branding strategy were associated with higher market value relative to assets, while mixed strategies were associated with lower value.