| Course | MKT 678 Brand Management |
|---|---|
| Module | Module 2 |
| Paper type | graduate assignment auditing a brand through an inventory of how it is marketed and an exploratory study of what customers associate with it |
| Length | About 1,020 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MBA in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 678 Module 2
Inventory, Associations and a Gap Between Generations: A Brand Audit of Arrowhead Woolen Mills
[Student Name]
Southern New Hampshire University
MKT 678: Brand Management
Brand Audit Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Inventory, Associations and a Gap Between Generations: A Brand Audit of Arrowhead Woolen Mills
Introduction
In 120 years the company has never audited its brand. Its managers believe they know what the name means because the business has been steady for a long time. This audit tests that belief in two parts. The brand inventory reviews how the company presents the brand across its elements, products, prices, channels and communication. The exploratory study asks customers what the brand means to them, through 24 in-depth interviews with buyers in Minnesota, Illinois, Colorado and New York and an online survey of 1,150 buyers drawn from the company's customer file and a national panel.
The Brand Inventory
Brand inventory findings
| Element | What the audit found |
|---|---|
| Name and logo | Four logo versions in use: the 1950s arrowhead, a 1990s script, a simplified mark on the website and a stamp used on labels |
| Colors and pattern | Red and black camp plaid is the most recognized element; used inconsistently on packaging |
| Products | 640 items, up from 310 in 2015; blankets are 34% of sales, apparel 52%, accessories 14% |
| Prices | Camp blanket $289, up 31% in five years; rivals' wool blankets up about 15% |
| Channels | Four company stores, website, about 400 outdoor and department store accounts, a Japanese distributor |
| Communication | Catalog four times a year; website product grids; social media run by an agency with stock lifestyle photography |
Two findings stand out. The logo problem is more than cosmetic: shoppers in interviews could not say whether the script and the arrowhead belonged to the same company. And the company's strongest asset, a working mill on the Duluth harbor where its blankets are still woven, appears nowhere on the website or in the catalog. The agency's photographs show models on mountains that could belong to any outdoor brand.
The Exploratory Study
Interviews began with an open question, "What comes to mind when you think of Arrowhead?", followed by questions about first experiences with the brand, reasons for buying and comparisons with rivals. Those answers produced 18 associations, which the survey then measured. Keller (1993) argued that brand equity arises when customers hold strong, favorable and unique associations in memory; the survey rated each association on all three, uniqueness measured by comparing ratings for Arrowhead with ratings for two rivals.
Key associations by customer group
| Association | Buyers 55 and over | Buyers under 35 | Unique to Arrowhead? |
|---|---|---|---|
| Warm, lasts a lifetime | Strong, favorable | Moderate, favorable | Yes |
| Authentic, American-made | Moderate, favorable | Strong, favorable | Yes |
| Minnesota, northern woods | Strong, favorable | Weak | Yes |
| Vintage, heritage style | Weak | Strong, favorable | Partly |
| Performance for active use | Weak | Weak | No |
| Expensive | Moderate, unfavorable | Strong, mixed | No |
| Family memories | Strong, favorable | Moderate, favorable | Yes |
Two Groups, Two Brand Concepts
Park et al. (1986) distinguished brands built on a functional concept, solving practical problems, a symbolic concept, expressing identity or group membership, and an experiential concept, offering sensory pleasure or stimulation, and recommended choosing one of them and keeping to it. The audit suggests Arrowhead is being bought on two concepts at once. Older loyal buyers buy a functional promise wrapped in memory: a blanket that keeps them warm and will outlive them. Younger buyers buy a symbolic one: a sign that they value authentic, well-made American goods. The groups overlap on authenticity and lasting quality, which gives the positioning a shared core, but they differ on what is most central.
Authenticity in Customers' Words
Younger buyers used the word "authentic" more than any other, so the interviews probed what they meant by it. In the scale developed by Morhart et al. (2015), a brand seems authentic when customers believe it keeps its promises, acts on values beyond profit, helps them express who they are and stays true to its past. The younger interviewees pointed to two kinds of evidence. The first was continuity: "my grandfather's blanket looks exactly like the one in the store." The second was credibility: several had seen photographs of the mill online, posted by visitors rather than the company, and took them as proof that the goods were really made there. None mentioned the catalog or the company's social media as a reason for believing the brand was authentic. Their belief rests on evidence the company does not supply, which makes it fragile: a single report that production had moved offshore would undo it.
Where the Brand Is Weak
Performance associations are weak in both groups, which matters because the company's fastest-growing product category is lightweight outerwear sold through outdoor retailers. Customers do not think of Arrowhead for hiking or skiing, and rival performance brands own that space. The link to "expensive" has strengthened as prices have risen. Among older buyers it is mildly unfavorable, a sense that the brand is no longer for people like them. Among younger buyers it is mixed: some see the price as proof of quality, others as a reason to buy vintage Arrowhead pieces secondhand. About 22 percent of buyers under 35 said their first Arrowhead item was bought used.
Consistency Between Presentation and Belief
The company presents a generic outdoor brand. Customers believe in a specific mill, a specific region and a specific kind of durability. The gap is costly in two ways. It wastes the associations that are both strong and unique, which are the ones that support the price premium, and it invites comparison with performance brands on the one dimension where Arrowhead is weakest. The growing product line widens the gap: of 640 items, about 200 sell fewer than 300 units a year, many of them fashion pieces with no connection to wool or warmth.
Findings for the Positioning
First, the brand's equity rests on durability, authenticity and the working mill; the positioning must make those central and visible. Second, the two customer groups share a core but buy different concepts; the positioning needs a frame both can recognize. Third, performance is not a point of difference and should not be claimed without proof. Fourth, rising prices are straining the brand with older buyers; the company must justify the premium, not simply charge it. Fifth, the logo and product line have drifted and should be simplified so that the brand presents one face.
References
Keller, K. L. (1993). Conceptualizing, measuring, and managing customer-based brand equity. Journal of Marketing, 57(1), 1-22. https://doi.org/10.1177/002224299305700101
Morhart, F., Malär, L., Guèvremont, A., Girardin, F., & Grohmann, B. (2015). Brand authenticity: An integrative framework and measurement scale. Journal of Consumer Psychology, 25(2), 200-218. https://doi.org/10.1016/j.jcps.2014.11.006
Park, C. W., Jaworski, B. J., & MacInnis, D. J. (1986). Strategic brand concept-image management. Journal of Marketing, 50(4), 135-145. https://doi.org/10.1177/002224298605000401
What the MKT 678 Module 2 instructions ask for
The Module 2 assignment in MKT 678 usually asks for a brand audit, a structured review of a brand's health and sources of equity. Expect two parts: a brand inventory that catalogs how the brand is presented, including its name, logo, products, prices, channels and communication, and an exploratory study of what customers think and feel about the brand, often from interviews, surveys or reviews. Strong audits compare the two, note inconsistencies across the inventory and rate customer associations for strength, favorability and uniqueness rather than listing them. They identify which associations drive the brand's equity, which are weak or shared with rivals and which differ across customer groups, and they end with specific findings for the positioning.
How this MKT 678 Module 2 brand audit assignment example is built
The sample audits Arrowhead Woolen Mills, a composite Duluth, Minnesota, wool company with $86 million in sales. The inventory finds four versions of the logo in use, a product line that has grown to 640 items, prices that have risen faster than rivals' and a website that never shows the mill or its weavers. The exploratory study, 24 interviews and a survey of 1,150 buyers, finds strong, favorable and unique associations with durability and warmth among buyers over 55 and with authenticity and American making among buyers under 35, but weak associations with performance and a growing link to "expensive." Keller's customer-based model and Park, Jaworski and MacInnis's brand concepts frame the analysis, which ends with five findings for the positioning.
Where the MKT 678 Module 2 rubric puts the points
Brand audits in MKT 678 are generally graded on a complete brand inventory, a sound exploratory method, analysis of associations by strength, favorability and uniqueness, comparison of the brand's presentation with customer perceptions, attention to differences among customer groups and clear findings, with sources and organization. The best audits present the association map in a table with evidence for each rating and point out inconsistencies the company may not have noticed. Audits lose marks for listing brand elements without judging them, reporting survey results without interpreting them, treating all customers as one group or ending with recommendations before establishing what customers actually believe.
MKT 678 Module 2 help: the mistakes that cost points
Start with the inventory: gather every logo version, package, product line, price list, channel and recent ad or post, and note inconsistencies. Then study customers. Interview a small group with open questions about what comes to mind with the brand, and use the answers to write survey items for a larger sample. Rate each association for how strongly it is held, how favorable it is and whether rivals share it. Split results by customer group if the groups differ. Compare what customers believe with what the company presents. End with three to five findings that the positioning must address, each supported by evidence from the audit rather than opinion.
Get MKT 678 Module 2 written to your instructions
Share the MKT 678 Module 2 brief and what you can gather about your brand. We build the brand inventory, design and summarize the exploratory study of customer associations, rate each association's strength, favorability and uniqueness and finish with the findings your positioning must address. We draft the first audit free, typically in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 678 papers and related MBA in Marketing samples
- MKT 678 Module 1 Discussion: What Brand Equity Means
- MKT 678 Module 3 Milestone One: Brand Positioning
- MKT 678 Module 4 Discussion: Judging a Brand Extension
- MKT 678 Module 5 Brand Architecture Assignment: Brand Architecture and an Acquired Brand
- MKT 678 Module 6 Milestone Two: Brand Elements and the Marketing Program
- MKT 678 Module 7 Discussion: Licensing and Brand Dilution
- MKT 678 Module 8 Brand Equity Measurement Assignment: Measuring Brand Equity
- MKT 678 Module 9 Discussion: Brand Crisis Response
- MKT 678 Module 10 Final Project: Brand Management Plan
- FIN 700 Module 1 Discussion: Capital Allocation as the Finance Leader's Main Job
- FIN 620 Module 3 Milestone One: Structuring a $95 Million Water Revenue Bond
- FIN 610 Module 10 Final Project: Rappahannock's Short-Term Financial Plan
- MKT 555 Module 3 Milestone One: Audience Analysis and Social Media Goals
MKT 678 Module 2 questions, answered
Where can I find a free MKT 678 Module 2 brand audit sample?
This page includes the full MKT 678 Module 2 audit of a composite Duluth wool mill, with its brand inventory and an association map for two customer groups.
What is a brand audit?
A comprehensive review of a brand's health, combining an inventory of how the brand is presented and marketed with an exploratory study of the beliefs and feelings customers attach to it.
What is a brand inventory?
A catalog of every brand element and marketing activity, including names, logos, packaging, products, prices, channels and communication, used to check consistency and positioning.
How do you rate brand associations?
By strength, how readily customers link the association to the brand; favorability, how much customers value it; and uniqueness, whether rivals share it.
Why split an audit by customer group?
Different groups may hold different associations and buy the brand for different reasons, which changes how the brand should be positioned and managed.