MKT 678 Module 9 Discussion Example

Reviewed by Portia Lambrick, MBA

This MKT 678 Module 9 Discussion sample asks how a brand should answer a crisis that strikes at what it stands for. SNHU MKT 678 (MKT-678) brings MBA in Marketing students to brand crises late in the term. The post follows Arrowhead Woolen Mills, a composite Duluth wool maker, after an animal welfare group's video shows mulesing at an Australian farm supplying merino for its new base layers. It applies research on product-harm crises, prior expectations and corporate responsibility, argues for an immediate and unequivocal response that suspends the supplier and publishes every wool source and closes by inviting classmates to draft the brand's first-hour statement.

CourseMKT 678 Brand Management
ModuleModule 9
Paper typegraduate discussion post on how a brand should respond to a crisis that threatens its associations
LengthAbout 340 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMBA in Marketing
UpdatedOctober 2026

Free sample paper for MKT 678 Module 9

1

Module Nine Discussion

The Sheep in the Video

On Monday an animal welfare group released a video filmed at an Australian sheep station showing mulesing, the cutting of skin from lambs to prevent flystrike. The station supplies merino to the contractor that knits Arrowhead's new base layers, and the group's thumbnail shows the red and black plaid. By Wednesday the video had 2 million views, and the brand's social accounts were full of comments asking, "Is this what made to last means?"

What this page is doingWhat happened.
2

The crisis does not touch the blankets, which use American wool. But it attacks the brand's core promise of honest, well-made wool, and it lands on the base layer line that already strained the brand's concept. Worse, the company cannot yet say where all its other wool comes from, because no one has asked the contractor or the spinners for that list.

What this page is doingWhat it threatens.
3

Dawar and Pillutla (2000) found that responses to a product-harm crisis that clearly supported customers, such as a recall with an apology, protected brand equity, while ambiguous responses were interpreted through customers' prior expectations of the firm: those who already trusted the brand read them kindly, and others did not. Klein and Dawar (2004) found that a company's record of social responsibility affected how much blame consumers assigned in a crisis and, through blame, how they judged the brand. Cleeren et al. (2008) found that prior loyalty and familiarity cushioned brands against lost preference after a crisis. Arrowhead's older loyal buyers may forgive; the younger buyers it most needs know it less well and expect more.

What this page is doingThree findings that apply.
4

Post a short, plain statement from the family chair: we did not know, we should have, and here is what changes. Suspend the supplier and pull the base layers from sale. Publish, within a week, a list of every farm and mill that supplies Arrowhead wool. Commit to certified mulesing-free merino for any future base layers, or none at all. No legal language, no "we take this seriously."

What this page is doingWhat I would do in the first day.
5

What would your first statement say, and who should sign it?

What this page is doingYour first hour.
6

References

Cleeren, K., Dekimpe, M. G., & Helsen, K. (2008). Weathering product-harm crises. Journal of the Academy of Marketing Science, 36(2), 262-270. https://doi.org/10.1007/s11747-007-0022-8

Dawar, N., & Pillutla, M. M. (2000). Impact of product-harm crises on brand equity: The moderating role of consumer expectations. Journal of Marketing Research, 37(2), 215-226. https://doi.org/10.1509/jmkr.37.2.215.18729

Klein, J., & Dawar, N. (2004). Corporate social responsibility and consumers' attributions and brand evaluations in a product-harm crisis. International Journal of Research in Marketing, 21(3), 203-217. https://doi.org/10.1016/j.ijresmar.2003.12.003

What the MKT 678 Module 9 instructions ask for

This MKT 678 discussion usually asks you to examine a brand crisis, such as a product failure, a scandal or an ethical controversy, and recommend how the brand should respond. Expect to describe the crisis, explain which brand associations it threatens and evaluate response options. Strong posts use research on crisis response and brand equity, distinguish clear, supportive responses from ambiguous ones, consider how customers' prior expectations and the brand's record shape their reaction and specify what the brand should do and say, when and through whom. They recognize that the response must change something real, not only the message, and that speed matters most in the first hours.

How this MKT 678 Module 9 discussion example is built

The sample examines a crisis at Arrowhead Woolen Mills, a composite Duluth wool maker. An animal welfare group's video shows mulesing, the removal of skin from sheep to prevent flystrike, at an Australian farm that supplies merino for the brand's new base layers. It reaches 2 million views in three days with the brand's plaid in the thumbnail. Dawar and Pillutla's research on responses to product-harm crises, Klein and Dawar's work on social responsibility and blame and Cleeren, Dekimpe and Helsen's evidence on loyalty as a cushion support a recommendation for an immediate, unequivocal response: suspend the supplier, publish every wool source and commit to certified mulesing-free merino with a date.

Where the MKT 678 Module 9 rubric puts the points

Marks in this MKT 678 crisis discussion tend to reflect an accurate account of the crisis, analysis of which associations are at risk, use of research on crisis response, a specific and timely recommendation, attention to the brand's record and customers' expectations and engaged replies. The best posts propose actions that fix the cause as well as statements that address it. Posts lose credit when they recommend waiting for the story to pass, issue an apology without a change, blame the supplier while keeping it, ignore which customers are most affected or reply to classmates without testing their proposed first statement against the research.

MKT 678 Module 9 help: the mistakes that cost points

Describe what happened, who saw it and how fast it spread. Name the brand associations the crisis attacks; here, a promise of honest, well-made wool. Consider the brand's record and what customers expected of it, since prior beliefs shape how a response is read. Use research on crisis response to choose between clear support for customers and a defensive or ambiguous reply. Then write the first statement and list the actions behind it: what changes, by when and how customers can check. Decide who speaks and where. End by asking classmates what they would say in the first hour, and in replies compare their wording with the research on unequivocal responses. Draft the statement before you need it.

Get MKT 678 Module 9 written to your instructions

Send the Module 9 prompt for MKT 678 and the crisis your brand faces or is studying. We assess how it threatens the brand's associations, apply research on crisis response and brand equity and set out what the brand should say and do first, finishing with a question for the class. Your first MKT 678 crisis post is free and usually takes about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 678 papers and related MBA in Marketing samples

MKT 678 Module 9 questions, answered

Where can I find a free MKT 678 Module 9 Discussion sample?

The complete MKT 678 Module 9 post appears on this page: a composite wool brand's response to a viral video of mulesing at a supplier's farm.

What is a product-harm or brand crisis?

A widely publicized event, such as a defect, scandal or ethical failure, that damages customers' trust in a brand and can reduce its equity.

How should a brand respond to a crisis?

Research found that clear, unequivocal support for customers, such as an apology with corrective action, protects brand equity better than ambiguous or defensive responses.

Does a brand's reputation protect it in a crisis?

It can. A record of social responsibility can reduce the blame customers assign, and loyalty and familiarity can cushion the loss of preference afterward.

What is mulesing?

A practice used on some merino sheep, mainly in Australia, in which strips of skin are removed to prevent flystrike; many brands now source wool from farms that do not use it.