| Course | OL 655 Talent Development and Workforce Planning |
|---|---|
| Module | Module 3 |
| Paper type | graduate milestone presenting a workforce plan and succession plan for critical roles, including pipelines, readiness assessment and transparency |
| Length | About 1,040 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 655 Module 3
Building the Pipelines: A Workforce and Succession Plan for the Port of Calder Bay
[Student Name]
Southern New Hampshire University
OL 655: Talent Development and Workforce Planning
Milestone One: Workforce and Succession Plan
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Building the Pipelines: A Workforce and Succession Plan for the Port of Calder Bay
Introduction
The Module 2 forecast showed that, without action, the Port of Calder Bay would be about 43 ship-to-shore crane operators and 49 electrical technicians short by 2030, with smaller gaps in yard operators and mechanical technicians and a surplus of gate clerks after the gate is automated. This milestone sets out how each gap will be closed and how the port will prepare successors for supervisory roles that will also open as experienced people retire.
Closing Each Gap
How each gap will be closed
| Role | Main approach | Supporting approach |
|---|---|---|
| Ship-to-shore crane operators | Develop from yard equipment operators | Recall recently retired operators part time as trainers |
| Yard equipment operators | Hire at entry level | Redeploy gate clerks who qualify |
| Electrical technicians | Four-year apprenticeship | Hire experienced electricians; sign-on and retention pay |
| Mechanical technicians | Hire and cross-train | Retrain some toward electrical work |
| Gate clerks | Redeploy | Voluntary early retirement for eligible clerks |
The Crane Operator Pathway
Crane operators are learned on the job: no outside school produces them, and experienced operators from other ports are rarely available. The pathway takes yard equipment operators with at least two years of safe operation through an 18-month program: three months on a crane simulator purchased for the port, nine months of supervised operation on the berth under a certified operator and six months of solo operation on lighter vessel calls before full certification. The port will start 14 trainees a year from 2026, enough with expected completion rates of about 80 percent to meet demand by 2030.
The Electrical Apprenticeship
The port will launch a registered four-year electrical apprenticeship with the local community college, starting 16 apprentices a year from fall 2026, combining classroom instruction with paid work alongside journey-level technicians on the port's cranes. Because the first apprentices will not finish until 2030, the port will also hire about eight experienced electricians a year through 2029 and add a retention payment for technicians who stay five years, aimed at the refinery recruiting that drives turnover.
Redeploying Gate Clerks
Gate automation in 2028 removes about 26 clerk positions. The port has committed that no clerk will be laid off. Clerks may train for yard equipment operation, move into vessel planning support or gate exception handling or take a voluntary early retirement if eligible. Clerks are being told now, two years ahead, so they can choose. Each clerk will meet with HR this year to discuss options, and those choosing yard equipment training can start in 2027, giving them a full year on the equipment before the gate changes. Clerks who move into new roles keep their current pay for two years if the new role pays less, which costs about $90,000 in total and signals that the port's growth will not be paid for by the people automation displaces.
Succession for Supervisory Roles
Groves (2007), interviewing CEOs and HR executives at 15 organizations known for strong practice, found that the best organizations integrated leadership development with succession planning, made line managers responsible for developing successors and used flexible pools of candidates rather than replacement charts for single positions. The port will identify successor pools for its eight terminal superintendents and six maintenance supervisors, eleven of whom can retire within five years. Each pool will hold two or three candidates per position rather than a single named heir, so a candidate who leaves or turns out not to fit does not leave the role uncovered, and candidates will rotate through short assignments on other terminals to broaden their experience before they are needed.
Assessing Readiness and Potential
Silzer and Church (2009) observed that organizations disagree about what potential means and proposed a model distinguishing foundational qualities, growth factors such as learning orientation and career-specific dimensions such as leadership or technical skill. The port's readiness criteria follow that structure: safety record and judgment, demonstrated learning in new assignments and specific supervisory or technical capabilities, each with observable indicators. Line managers rate candidates twice a year in talent reviews facilitated by HR, and each candidate is placed in one of three bands: able to step up today, likely able within two years, or still building.
Transparency
Dries and Pepermans (2008), interviewing high-potential employees and representatives of their organizations, found differences between how organizations and high potentials themselves described such careers, including expectations about mobility, development and commitment. To avoid mismatched expectations, the port will publish the criteria and process for successor pools, let any employee ask to be considered and tell candidates where they stand and what they need to develop, while keeping individual ratings confidential from peers.
Year-by-Year Readiness
People ready from each pipeline by year
| Year | New certified crane operators | Apprentices finishing | Experienced electricians hired |
|---|---|---|---|
| 2026 | 0 | 0 | 8 |
| 2027 | 11 | 0 | 8 |
| 2028 | 11 | 0 | 8 |
| 2029 | 11 | 0 | 8 |
| 2030 | 11 | 13 | 0 |
By 2030 the operator pathway produces about 44 certified operators, enough to cover the forecast gap of 43, while apprentices and experienced hires together add about 45 electrical technicians, close to the gap of 49. The remaining shortfall will be covered by retraining four or five mechanical technicians toward electrical work.
Risks
The plan depends on trainees completing at expected rates; if completion falls below 70 percent, the port will add a second simulator shift. Experienced electricians may be harder to hire than planned if refinery construction picks up, which is why the retention payment matters as much as hiring. And supervisors who train new operators while running the berth may be overloaded during the peak years of 2027 and 2028, so the port will recall retired operators part time to share the training load.
Costs and Timeline
The crane simulator costs about $1.2 million once, and the operator pathway about $380,000 a year in trainee and trainer wages beyond normal pay. The apprenticeship costs about $640,000 a year at full enrollment, retention payments about $210,000 a year and talent reviews and supervisory development about $150,000 a year. The first trainees start in 2026, the first apprentices finish in 2030 and the plan is reviewed each year against the updated forecast.
Conclusion
The plan grows the port's two most critical roles from within, fills the rest through hiring and redeployment and prepares successors for supervisors with criteria employees can see.
References
Dries, N., & Pepermans, R. (2008). "Real" high-potential careers: An empirical study into the perspectives of organisations and high potentials. Personnel Review, 37(1), 85-108. https://doi.org/10.1108/00483480810839987
Groves, K. S. (2007). Integrating leadership development and succession planning best practices. Journal of Management Development, 26(3), 239-260. https://doi.org/10.1108/02621710710732146
Silzer, R., & Church, A. H. (2009). The pearls and perils of identifying potential. Industrial and Organizational Psychology, 2(4), 377-412. https://doi.org/10.1111/j.1754-9434.2009.01163.x
What the OL 655 Module 3 instructions ask for
Milestone One of the OL 655 final project asks students to turn a workforce forecast into a plan. Expect to decide how each gap will be closed, by developing people inside, hiring, contracting or redeploying, and to design pipelines for the most critical roles, with timelines long enough for people to become ready. A succession component usually covers leadership or other key positions: how successors are identified, how readiness is judged and developed and how decisions are communicated. Strong submissions match the time it takes to develop people against when they will be needed, use explicit readiness criteria rather than managers' impressions and explain how the organization will handle fairness and transparency. Research on succession and on identifying potential should inform the design.
How this OL 655 Module 3 milestone one example is built
The sample plans for the Port of Calder Bay, an imagined Gulf Coast port authority whose forecast shows a 2030 gap of about 43 ship-to-shore crane operators and 49 electrical technicians and a surplus of gate clerks. It builds an 18-month pathway from yard equipment operator to crane operator with simulator training and certification, a four-year electrical apprenticeship with the local community college, targeted hiring of experienced electricians and redeployment for displaced gate clerks. Succession for terminal superintendents and maintenance supervisors uses published readiness criteria and twice-yearly talent reviews led by line managers. Groves's study of best-practice succession, Silzer and Church's model of potential and Dries and Pepermans's research on high-potential careers inform the design.
Where the OL 655 Module 3 rubric puts the points
OL 655 Milestone One is usually graded on a clear method for closing each gap, pipelines whose timing matches the forecast, a succession process with explicit readiness criteria, line managers' involvement, attention to fairness and transparency, costs and a timeline and research support. Plans that show when each pipeline produces ready people, year by year, are the most convincing. Credit drops for plans that hire for every gap, for development pathways shorter than the time skills really take, for secret succession lists, for readiness judged by impression or for ignoring employees displaced by technology. Showing, in a table or timeline, how many ready people each pipeline produces per year tends to win the most credit on this milestone.
OL 655 Module 3 help: the mistakes that cost points
For each gap in your forecast, choose a way to close it and explain why: build, buy, borrow or redeploy. Map how long each pipeline takes to produce a ready person and start early enough to meet demand. Design the steps of each pipeline, including training, practice and certification. For succession, list key positions, define readiness criteria in observable terms and decide who assesses readiness and how often. Involve line managers, not just HR. Decide what employees will be told about succession and potential. Plan for people whose jobs are shrinking. Estimate costs and set a timeline. Use research on succession planning and on identifying potential.
Get OL 655 Module 3 written to your instructions
Share the OL 655 Milestone One guidelines and your forecast with its comments. We build the workforce plan, pipelines for each critical role, hiring and redeployment, and the succession plan, readiness criteria, talent reviews and transparency, with costs and a timeline and research on succession and potential. The first OL 655 milestone is free and ready in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 655 papers and related MS Organizational Leadership samples
- OL 655 Module 1 Discussion: Defining Talent Management
- OL 655 Module 2 Workforce Analytics Assignment: Workforce Supply and Demand Forecast
- OL 655 Module 4 Discussion: Identifying High Potentials Fairly
- OL 655 Module 5 Milestone Two: Learning and Development Strategy
- OL 655 Module 6 Discussion: Mentoring and Knowledge Transfer
- OL 655 Module 7 Milestone Three: Retention and Career Development Plan
- OL 655 Module 8 Discussion: Automation and Reskilling
- OL 655 Module 9 Final Project: Talent Development and Workforce Plan
- OL 655 Module 10 Discussion: Inclusive Versus Exclusive Talent Programs
- FIN 685 Module 9 Milestone Three: A Board-Approved Risk and Hedging Policy
- MGT 630 Module 7 Cost Control Assignment: Earned Value on the Framing Package
- MKT 645 Module 4 Discussion: Online Marketplaces: Reach Versus Control
- FIN 610 Module 9 Milestone Three: A Liquidity Plan and the Bank Relationship
OL 655 Module 3 questions, answered
Where can I find a free OL 655 Module 3 Milestone One sample?
The complete OL 655 Milestone One is on this page: a workforce and succession plan for crane operators, technicians and supervisors at a port.
What is the difference between workforce planning and succession planning?
Workforce planning addresses the number and skills of people needed across roles; succession planning focuses on preparing specific people for key positions.
How long does it take to develop a critical role internally?
It depends on the role; specialized operating and technical roles often take one to four years, so pipelines must start well before people are needed.
Should succession plans be kept secret?
Research and practice increasingly favor transparent criteria and processes, even when individual assessments stay confidential, to support fairness and development.
What is readiness in succession planning?
An assessment of how soon a candidate could perform well in a target role, based on defined skills, experience and behaviors rather than general impressions.