| Course | OL 655 Talent Development and Workforce Planning |
|---|---|
| Module | Module 5 |
| Paper type | graduate milestone designing a learning and development strategy, including apprenticeships, on-the-job learning, evaluation and the conditions that make training transfer |
| Length | About 1,040 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 655 Module 5
Learning on the Berth: A Learning and Development Strategy for the Port of Calder Bay
[Student Name]
Southern New Hampshire University
OL 655: Talent Development and Workforce Planning
Milestone Two: Learning and Development Strategy
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Learning on the Berth: A Learning and Development Strategy for the Port of Calder Bay
Introduction
Milestone One set out pipelines to close the Port of Calder Bay's largest gaps: an 18-month pathway from yard equipment operator to ship-to-shore crane operator, a four-year electrical apprenticeship and supervisory successor pools. This milestone designs how people in those pipelines will learn, what will keep them motivated, how the port will know they are capable and how learning will reach a workforce that works on the berth, not at desks.
Principles From Research
Noe et al. (2014), reviewing research on learning in today's workplaces, emphasized that much important learning happens informally and on the job, that organizations need to support learning through the work environment and that formal training is only one part of a learning system. Colquitt et al. (2000), combining two decades of research, found that training motivation was shaped by individual characteristics, such as self-efficacy and conscientiousness, and by situational characteristics, such as organizational climate, and that motivation predicted learning outcomes beyond cognitive ability. Kraiger et al. (1993) argued that learning outcomes should be measured as cognitive, skill-based and affective, rather than by a single test or satisfaction rating. Three design choices follow: build learning into the work itself, remove what discourages trainees and measure capability in several ways.
Learning Architecture for Crane Operators
Crane operator pathway, 18 months
| Stage | Months | Learning method | Certification gate |
|---|---|---|---|
| Knowledge | 1 | Classroom: crane systems, load physics, signals, safety rules | Written test |
| Simulator | 2-3 | Simulator practice with instructor feedback, rising difficulty | Simulator score at target |
| Supervised operation | 4-12 | Paired operation on the berth with a certified operator | Supervisor sign-off on 20 skills |
| Solo, lighter calls | 13-18 | Solo operation on smaller vessels, weekly coaching | Productivity and safety targets |
Each trainee is assigned one certified operator as coach for the supervised stage, so feedback comes from someone who knows the trainee's habits.
Learning Architecture for Electrical Apprentices
Apprentices spend about 80 percent of their time working alongside journey-level technicians and 20 percent in community college classes on electrical theory, controls and safety. They rotate through crane, reefer and substation work so they learn the port's whole electrical system. Each year ends with a practical assessment on troubleshooting faults that technicians have recorded from real failures.
Removing Barriers to Motivation
Interviews with yard operators revealed two discouragements. Trainees lose overtime, which many depend on, while in classroom and simulator stages; the port will pay trainees their average overtime of the past year during those stages. Some supervisors see trainees as lost labor and assign them to the worst shifts; supervisors' evaluations will include trainee progress, and trainees' schedules will be set by the training coordinator, not by shift supervisors. Colquitt and colleagues' finding that climate shapes motivation suggests these changes matter as much as the curriculum.
Evaluating Capability
Evaluation by learning outcome
| Outcome | Crane operators | Electrical apprentices |
|---|---|---|
| Knowledge | Written tests on systems and safety rules | College course grades, code exams |
| Skill | Simulator scores; supervisor skill checklist | Practical troubleshooting assessments |
| Confidence and attitude | Self-efficacy survey at each gate | Self-efficacy survey each year |
| On-the-job behavior | Moves per hour, incidents, near misses | Time to diagnose faults, repeat failures |
Completion rates and cost per certified operator or technician will be tracked for the program as a whole.
Delivering Learning to a Workforce Without Desks
Most operators and technicians work rotating shifts and have no computers at work. Classroom stages will be scheduled on paid days, short refresher lessons will be available on tablets kept in break rooms and the learning management system will record certifications entered by coaches from their phones. Instructions and safety materials will be in English and Spanish.
Retraining Gate Clerks
Clerks who chose yard equipment work in Milestone One begin a shorter path in 2027: four weeks of classroom and yard simulator practice, then three months of paired operation with a certified yard operator before a skills check. Clerks who move to gate exception handling learn the new gate software from the vendor's trainers alongside the port's own systems staff, since they will be the people who resolve the trucks the automated lanes reject. Because some clerks have not been in a classroom for decades, the first week is built around hands-on practice, with written material kept short and available in both languages. Each clerk is paired with a peer who has already made the move, so questions about pay, shifts and the new work get honest answers from someone who has lived them.
Who Owns Each Part
A training coordinator in HR owns scheduling, records and the budget. Certified operators and journey-level technicians own day-to-day coaching and sign the skill checklists. Terminal superintendents own trainees' release from production work and are measured on it. The community college owns classroom content and grades under an agreement reviewed each year. A learning council of two operators, two technicians, a superintendent and the coordinator meets every quarter to review completion, evaluation results and complaints, so problems surface before a cohort is lost.
Supervisory Development
Candidates in supervisory successor pools will complete a twelve-month program of short workshops on scheduling, labor relations, safety leadership and coaching, combined with stretch assignments as acting supervisors on other terminals and a mentor from current superintendents.
Costs
Including the simulator, instructor time, apprentice wages beyond productive work, college tuition, trainee overtime replacement and coaching time, the strategy costs about $1.9 million in its first year, including the one-time simulator purchase of $1.2 million, and close to $1.4 million annually once all four apprentice classes are on the payroll.
Timeline
The simulator is installed and the first fourteen operator trainees start in spring 2026. The apprenticeship agreement with the college is signed by summer, and the first sixteen apprentices begin in the fall term. Mentor training for certified operators runs before each cohort reaches its supervised stage. Clerk retraining opens in early 2027 so every clerk who wants a new role has finished before the automated gate goes live. The first full evaluation report, covering knowledge, skill and on-the-job measures for the first cohort, reaches the port's executives in December 2027.
Conclusion
The strategy develops crane operators and electricians mostly on the job, with support that keeps trainees motivated and evaluation that shows whether they can do the work, so the pipelines in Milestone One deliver capable people on time.
References
Colquitt, J. A., LePine, J. A., & Noe, R. A. (2000). Toward an integrative theory of training motivation: A meta-analytic path analysis of 20 years of research. Journal of Applied Psychology, 85(5), 678-707. https://doi.org/10.1037/0021-9010.85.5.678
Kraiger, K., Ford, J. K., & Salas, E. (1993). Application of cognitive, skill-based, and affective theories of learning outcomes to new methods of training evaluation. Journal of Applied Psychology, 78(2), 311-328. https://doi.org/10.1037/0021-9010.78.2.311
Noe, R. A., Clarke, A. D. M., & Klein, H. J. (2014). Learning in the twenty-first-century workplace. Annual Review of Organizational Psychology and Organizational Behavior, 1, 245-275. https://doi.org/10.1146/annurev-orgpsych-031413-091321
What the OL 655 Module 5 instructions ask for
Milestone Two of the OL 655 final project asks students to design the learning and development strategy that will produce the people the workforce plan requires. Expect to choose a mix of learning methods, formal courses, on-the-job practice, apprenticeships, coaching and mentoring, for each critical role, explain how trainees will be motivated and supported, plan evaluation and consider how learning will be delivered to the actual workforce. Strong submissions treat learning as a system that includes supervisors and the work environment, not a catalog of courses, and they evaluate whether people can do the job afterward rather than whether they attended. Research on workplace learning, training motivation and learning outcomes should support the design.
How this OL 655 Module 5 milestone two example is built
The sample designs learning for the Port of Calder Bay, an imagined Gulf Coast port authority developing ship-to-shore crane operators from its yard equipment operators and electrical technicians through a four-year apprenticeship. It sets out a learning architecture of simulator practice, supervised operation and staged certification for operators and classroom work, paired work with journey-level technicians and rotations for apprentices. A motivation plan removes barriers such as lost overtime during training and unsupportive supervisors. Evaluation measures what trainees can do, from simulator scores and crane moves per hour to troubleshooting time. Noe, Clarke and Klein's review of workplace learning, Colquitt, LePine and Noe's meta-analysis of training motivation and Kraiger, Ford and Salas's framework of learning outcomes shape the plan.
Where the OL 655 Module 5 rubric puts the points
OL 655 Milestone Two is generally scored on a learning architecture matched to each critical role, attention to motivation and the work environment, evaluation of capability rather than attendance, delivery suited to the workforce, costs and a timeline, integration with the workforce plan and research support. Designs that measure skills and job behavior, not just completion, earn the most. Marks are lost for strategies that are mostly course lists, for ignoring supervisors' role in transfer, for evaluation limited to satisfaction surveys, for delivery that assumes everyone has a desk and a computer or for designs disconnected from the gaps the plan must close.
OL 655 Module 5 help: the mistakes that cost points
For each critical role, describe what a fully capable person can do and work backward to the learning needed. Mix methods: formal instruction for knowledge, practice with feedback for skills and coaching or mentoring for judgment. Identify what might discourage people from learning, such as lost pay or skeptical supervisors, and remove it. Plan evaluation at several levels, knowledge, skill and on-the-job behavior and, where possible, results. Consider how learning reaches the workforce you actually have, including shift workers. Assign owners and estimate costs. Tie everything to the gaps in your workforce plan. Use research on workplace learning and training motivation to justify your choices.
Get OL 655 Module 5 written to your instructions
Upload the OL 655 Milestone Two directions with your workforce and succession plan. We design the learning strategy, the mix of formal, on-the-job and coached learning, motivation and transfer supports, evaluation of real capability and delivery suited to the workforce, with costs and research on workplace learning. The first OL 655 Milestone Two is free and ready in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 655 papers and related MS Organizational Leadership samples
- OL 655 Module 1 Discussion: Defining Talent Management
- OL 655 Module 2 Workforce Analytics Assignment: Workforce Supply and Demand Forecast
- OL 655 Module 3 Milestone One: Workforce and Succession Plan
- OL 655 Module 4 Discussion: Identifying High Potentials Fairly
- OL 655 Module 6 Discussion: Mentoring and Knowledge Transfer
- OL 655 Module 7 Milestone Three: Retention and Career Development Plan
- OL 655 Module 8 Discussion: Automation and Reskilling
- OL 655 Module 9 Final Project: Talent Development and Workforce Plan
- OL 655 Module 10 Discussion: Inclusive Versus Exclusive Talent Programs
- BMB 630 Module 3 Milestone One: The Venue's Marketing Situation
- MKT 678 Module 2 Brand Audit Assignment: Brand Inventory and Exploratory Audit
- FIN 550 Module 2 Financial Statements Assignment: Reading Conestoga's Statements and Cash Flow
- MKT 635 Module 6 Milestone Two: Paid Search Campaign Plan
OL 655 Module 5 questions, answered
Where can I find a free OL 655 Module 5 Milestone Two sample?
This page holds the complete OL 655 Milestone Two: a learning and apprenticeship strategy for crane operators and technicians at a port.
What is a learning and development strategy?
A plan for how an organization will build the capabilities its strategy needs, through formal training, on-the-job learning, coaching and support from the work environment.
What affects training motivation?
Research finds personal factors such as self-efficacy and conscientiousness and situational factors such as organizational climate both shape motivation, which in turn predicts learning.
How should training be evaluated?
By measuring what people know, what they can do and whether they use it on the job, not only whether they attended or enjoyed it.
What is a registered apprenticeship?
A structured program that combines paid on-the-job training under experienced workers with related classroom instruction, leading to a recognized credential.