PHE 327 Research and Assessment in Public Health sample papers, module by module

Reviewed by Delia Ravenscroft, MSN, RN

PHE 327 teaches undergraduates how public health finds out what a community needs and what it already has. The samples below follow one composite student helping a small county health department and its area agency on aging assess the needs of older adults through a long Upper Peninsula winter, from choosing indicators and validated survey questions to mailing a survey, analyzing replies and reporting needs, assets and capacity, with research on survey design, loneliness and community partnership behind each step.

PHE 327 is SNHU’s Research and Assessment in Public Health course. It centers on research and assessment in public health: purposes of community health assessment, needs, assets and capacity, indicators and secondary data, survey design and validated scales, sampling and nonresponse, mixed-mode data collection, descriptive and comparative statistics, confidence intervals, community-based participatory research, priority setting and reporting results. Every module below opens a full sample paper or takes a free request for one; searches like "phe 327 module 3", "PHE327 sample paper" and "PHE 327 milestone example" land on this page.

What PHE 327 is really about

PHE 327 is the methods course of SNHU's BS in Public Health, and its graders reward assessments that could actually be carried out. Strong work chooses a few indicators that answer a defined question, uses tested instruments rather than invented questions, plans how to reach the people least likely to respond, reports results with their uncertainty and treats residents as partners who know things the data cannot show.

The samples are set in a composite county of about 17,000 people in Michigan's western Upper Peninsula, where more than a quarter of residents are 65 or older, snow closes back roads for days, the nearest hospital with a cardiologist is two hours away and the area agency on aging suspects that many older adults spend much of the winter alone. The county and its residents are illustrative.

What PHE 327’s modules ask for

Across eight modules, PHE 327 typically asks for discussions on the purpose of assessment and on reaching hard-to-reach groups, short papers on indicators and data sources, survey instruments and analysis, and two projects: an assessment plan and an assessment report on needs, assets and capacity.

Where students lose points in PHE 327

The most common PHE 327 deduction is an assessment that collects everything and answers nothing, with dozens of indicators and no defined question. The second is writing new survey questions when validated ones exist. Graders also mark down plans that ignore who will not answer, results reported as exact percentages without margins of error, and reports that list problems without the community's assets or capacity. The fix is to start from one clear question and let it decide what to measure, whom to ask and how to report.

The PHE 327 drawers

Module 1

PHE 327 Module 1 Discussion example

An opening post in which a composite student at an Upper Peninsula health department starts from an area agency on aging's worry that older adults spend the winter alone and explains what a community assessment adds: a defined question, measures of need, a count of assets and a judgment of capacity, with residents involved from the start, drawing on Kretzmann and McKnight on asset-based work, Israel and colleagues on community partnership and Holt-Lunstad and colleagues on isolation and mortality. Full sample paper, read it free.

Read the sample →
Module 2

PHE 327 Module 2 Indicators Short Paper example

A short paper that selects eight indicators for an assessment of winter isolation among older adults in a composite Upper Peninsula county, from the share of older adults living alone to missed medical visits in winter months, judges each by relevance, quality, timeliness and small-area availability, matches it to an existing source or flags it for the new survey, and explains why most of what matters is not in any database, drawing on Holt-Lunstad and colleagues, Hughes and colleagues and Kretzmann and McKnight. Full sample paper, read it free.

Read the sample →
Module 3

PHE 327 Module 3 Instrument Short Paper example

A short paper that builds a two-page mailed survey for older adults in a composite Upper Peninsula county from tested parts: the three-item loneliness scale, standard questions on living arrangement and health, a few new questions on winter confinement, heating costs and missed appointments that are pretested with eight seniors, plus questions on who checks in, all in large print with plain wording, drawing on Hughes and colleagues, Dillman and colleagues and Holt-Lunstad and colleagues. Full sample paper, read it free.

Read the sample →
Module 4

PHE 327 Module 4 Discussion example

A post in which a composite Upper Peninsula student confronts the paradox of surveying isolation, that the most isolated people are the least likely to answer, and proposes a mixed approach: a random address-based mailing with three contacts and a phone option, plus a separate list sample through meal drivers and mail carriers to reach people the mailing misses, with weighting to correct for who responds, drawing on Dillman and colleagues and Israel and colleagues. Full sample paper, read it free.

Read the sample →
Module 5

PHE 327 Module 5 Project One example

The first PHE 327 project assembles a complete plan for assessing winter isolation among older adults in a composite Upper Peninsula county: the question, a partnership with an advisory group of older residents, eight indicators, the two-page survey, an address-based sample with four mail contacts and a phone option, a separate driver and carrier route, an asset inventory, an analysis plan with confidence intervals and a simple comparison, ethics protections, a timeline and a budget near $9,000, drawing on Israel and colleagues, Dillman and colleagues, Hughes and colleagues and Kretzmann and McKnight. Full sample paper, read it free.

Read the sample →
Module 6

PHE 327 Module 6 Analysis Short Paper example

A short paper that analyzes 548 returned surveys from older adults in a composite Upper Peninsula county: a 46% response rate, loneliness in 31% with a confidence interval, 38% spending a week or more indoors, heat hardship, missed appointments, a clear gap in loneliness between people living alone and others, a remote-township difference that turns out not to be significant, weighting to census figures and a separate look at 61 people reached by meal drivers, drawing on Hughes and colleagues, Holt-Lunstad and colleagues and Dillman and colleagues. Full sample paper, read it free.

Read the sample →
Module 7

PHE 327 Module 7 Project Two example

The second PHE 327 project is the assessment report for a composite Upper Peninsula county: an executive summary, methods in brief, needs shown with confidence intervals, an asset inventory of 43 congregations, clubs, businesses and services, a capacity review of the agencies that would act, three priorities chosen with an advisory group of older residents, limitations and next steps, drawing on Kretzmann and McKnight, Israel and colleagues, Holt-Lunstad and colleagues and Hughes and colleagues. Full sample paper, read it free.

Read the sample →
Module 8

PHE 327 Module 8 Discussion example

A closing post in which the composite Upper Peninsula student reflects on doing research with older residents rather than about them, recalls how a pretest participant's objection to the word snowbound changed the survey and how the advisory group overruled the student's favorite priority, and names what the student would do differently, drawing on Israel and colleagues, Kretzmann and McKnight and Dillman and colleagues. Full sample paper, read it free.

Read the sample →
Different?

Your classroom shows something else?

Southern New Hampshire University revises courses; module counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.

Send it over →

Using a PHE 327 sample the right way

Read a PHE 327 sample by checking whether the assessment starts from a defined question, whether instruments are validated, whether nonresponse is planned for and whether results come with margins of error and include assets as well as needs. For PHE 327, bring the prompt, your community or the course case and the rubric; a first custom sample is returned free in 24-48h.

PHE 327 questions, answered

What does PHE 327 cover?

Community health assessment, indicators and data sources, survey design, sampling, data collection, basic statistical analysis and reporting needs, assets and capacity.

Do I need statistics for PHE 327?

Basic statistics, such as percentages, confidence intervals and simple comparisons, are used, with an emphasis on interpreting them correctly.

What makes a strong PHE 327 assessment?

A clear question, a few well-chosen indicators, validated instruments, a plan for nonresponse, results with their uncertainty and attention to assets and capacity.