PHE 489 Public Health Capstone Communication sample papers, module by module

Reviewed by Delia Ravenscroft, MSN, RN

PHE 489 is where SNHU's public health undergraduates show they can carry one problem from question to proposal and explain it to people who are not specialists. The samples below follow one composite student working with a regional public health network in southern New Hampshire, where almost every home relies on a private well, no law requires owners to test and arsenic, which has no taste, color or smell, turns up above the federal limit in a meaningful share of wells, with national studies of arsenic and testing behavior behind each step.

PHE 489 is SNHU’s Public Health Capstone Communication course. It centers on the public health capstone: choosing and framing an issue, problem statements, literature reviews of peer-reviewed research, risk communication, evidence-based recommendations, communication plans for different audiences, policy briefs and a final public health proposal that brings program, policy and communication together. Every module below opens a full sample paper or takes a free request for one; searches like "phe 489 module 3", "PHE489 sample paper" and "PHE 489 milestone example" land on this page.

What PHE 489 is really about

PHE 489 closes SNHU's BS in Public Health, and its instructors want to see the whole degree at work in one project. Strong capstones frame a focused problem with local and national data, review peer-reviewed research honestly, make recommendations the evidence actually supports, and then communicate them in forms suited to each audience, from a homeowner's postcard to a legislator's brief, while staying clear about costs, trade-offs and what remains uncertain.

The samples are set in five composite rural towns in southern New Hampshire with about 31,000 residents between them, nearly all drawing water from private wells. Federal drinking water rules do not cover private wells, so testing and treatment are left to each household, and a regional survey found that fewer than half of well owners had ever tested for arsenic. The towns, the network and the residents are illustrative.

What PHE 489’s modules ask for

Across eight modules, PHE 489 typically asks for discussions on choosing an issue and on communicating risk, three final project milestones covering the problem statement, the literature review and recommendations, a communication plan and a final public health proposal, closing with a reflection on the program.

Where students lose points in PHE 489

The most common PHE 489 deduction is a capstone that reviews the literature well but never says what should be done, or recommends something the reviewed studies do not support. The second is communication written for one audience only, usually the instructor, when the course asks for messages fitted to the public and to decision makers. Graders also mark down topics too broad to finish in eight weeks, literature reviews that summarize study by study and proposals without costs. The fix is a narrow problem, a synthesized review and recommendations traced to evidence.

The PHE 489 drawers

Module 1

PHE 489 Module 1 Discussion example

A discussion in which a composite student narrows a capstone topic from drinking water safety in general to arsenic testing among private well owners in five southern New Hampshire towns, explaining why the issue is serious, invisible and unregulated, why it is small enough to finish in eight weeks and who could act on the recommendations, drawing on Ayotte and colleagues, Naujokas and colleagues and Zheng and Flanagan. Full sample paper, read it free.

Read the sample →
Module 2

PHE 489 Module 2 Milestone One example

A first capstone milestone in which a composite student states the problem of untested private wells and arsenic exposure in five southern New Hampshire towns: where the arsenic comes from, what long-term exposure does, how many Americans are affected, what a regional survey of 612 well households and a free testing day found, why owners do not test and which households matter most, ending with the capstone's purpose and guiding questions, drawing on Ayotte and colleagues, Naujokas and colleagues, Flanagan and colleagues and Zheng and Flanagan. Full sample paper, read it free.

Read the sample →
Module 3

PHE 489 Module 3 Milestone Two example

A capstone literature review draft in which a composite student synthesizes peer-reviewed research on arsenic in private wells under four themes, the health harm of long-term exposure, how many people are exposed, why owners do or do not test and what a state testing requirement achieved, with a summary table, a section on what the studies leave unanswered and what the review means for five southern New Hampshire towns, drawing on Naujokas and colleagues, Ayotte and colleagues, Flanagan and colleagues and Zheng and Flanagan. Full sample paper, read it free.

Read the sample →
Module 4

PHE 489 Module 4 Discussion example

A discussion in which a composite student plans how to talk to private well owners in southern New Hampshire about arsenic, a risk they cannot sense and tend to think applies to neighbors rather than themselves, using the extended parallel process model to balance threat with a simple, doable action, and the finding that free tests drew mainly better-educated households to argue that the message must travel through trusted local messengers, drawing on Maloney and colleagues and two studies by Flanagan and colleagues. Full sample paper, read it free.

Read the sample →
Module 5

PHE 489 Module 5 Milestone Three example

A third capstone milestone in which a composite student weighs five options for raising arsenic testing and treatment among private well owners in southern New Hampshire, scored on evidence, reach, equity, cost and feasibility, and recommends four steps: targeted free kits carried by local messengers, plain-language results with a clear next step, an income-based treatment rebate with follow-up testing and support for a state requirement to test at home sale, with costs, a timeline, trade-offs and indicators, drawing on Flanagan and colleagues, Zheng and Flanagan, Ayotte and colleagues and Brownson and colleagues. Full sample paper, read it free.

Read the sample →
Module 6

PHE 489 Module 6 Communication Plan example

A communication plan in which a composite student sets out how a southern New Hampshire public health network will carry arsenic testing recommendations to four audiences, well owners, landlords, town officials and state legislators, with what each believes, the action sought, the message, the messenger, the channel and the timing, plus message testing with residents, sample wording for a postcard and a legislative brief, a plan for worries about property values, a small budget and measures of whether the communication worked, drawing on Maloney and colleagues, Flanagan and colleagues, Brownson and colleagues and Zheng and Flanagan. Full sample paper, read it free.

Read the sample →
Module 7

PHE 489 Module 7 Final Project example

A capstone final proposal in which a composite student brings the whole project together for a southern New Hampshire public health network's board: an executive summary, the arsenic problem in five towns, the evidence in brief, SMART objectives, four interventions from targeted kits to a state testing requirement, a two-year timeline, a $105,000 budget, a communication summary, an evaluation table, ethics and equity, and limits, drawing on Naujokas and colleagues, Ayotte and colleagues, Flanagan and colleagues, Zheng and Flanagan and Brownson and colleagues. Full sample paper, read it free.

Read the sample →
Module 8

PHE 489 Module 8 Discussion example

A final capstone post in which a composite student traces how courses across the BS in Public Health came together in a proposal on arsenic in New Hampshire wells, epidemiology for reading the survey, behavior theory for the postcard, planning and evaluation for the program and policy for the testing bill, names the skill that was hardest to learn, writing for people who are not specialists, and says what the student will bring to a first public health job, drawing on Brownson and colleagues and Zheng and Flanagan. Full sample paper, read it free.

Read the sample →
Different?

Your classroom shows something else?

Southern New Hampshire University revises courses; module counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.

Send it over →

Using a PHE 489 sample the right way

Read a PHE 489 sample by checking whether the problem is narrow and backed by data, whether the review synthesizes rather than lists studies, whether each recommendation traces to evidence and whether the messages fit their audiences. For PHE 489, bring the prompt, your capstone topic and the rubric; a first custom sample is returned free in 24-48h.

PHE 489 questions, answered

What does PHE 489 cover?

A capstone that integrates the degree: problem framing, literature review, evidence-based recommendations, communication for different audiences and a final public health proposal.

How do I choose a PHE 489 topic?

Pick a problem narrow enough to finish in eight weeks, with local data and peer-reviewed research behind it, and a clear group who could act on your recommendations.

What makes a strong PHE 489 capstone?

A focused problem, a synthesized literature review, recommendations traced to evidence, costs and trade-offs, and messages fitted to each audience.