| Course | QSO 360 Six Sigma Quality Management |
|---|---|
| Module | Module 7 |
| Paper type | undergraduate project completing the Improve and Control phases of a Six Sigma project with solution selection, a pilot, financial results, a control plan and control charts |
| Length | About 1,140 words, 7 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 360 Module 7
From Cpk 0.50 to 1.12: Improve and Control for Returned Orthotics at Oxbow
[Student Name]
Southern New Hampshire University
QSO 360: Six Sigma Quality Management
Project Two: Improve and Control
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
From Cpk 0.50 to 1.12: Improve and Control for Returned Orthotics at Oxbow
Introduction
The Analyze phase at Oxbow Orthotic Laboratory verified two causes of returned orthotics: shells unpacked after 8 hours of cooling slump in the arch, especially tall arches, and foam-box orders return at twice the rate of scanned ones regardless of clinic size. The designed experiment showed that 14 hours of cooling with a 30-degree print tilt should bring mean arch deviation from about minus 0.60 to about minus 0.10 millimeters. This project selects solutions, reports a four-week pilot, estimates the financial result and sets up the controls that will hold the gain after the project team disbands.
Solution Selection
Solution selection matrix, scored 1 to 5
| Solution | Cause addressed | Effect | Cost | Speed | Risk | Total |
|---|---|---|---|---|---|---|
| 14-hour cooling with 30-degree tilt | Shell slump | 5 | 3 | 4 | 4 | 16 |
| Foam-box intake check and re-request | Poor impressions | 3 | 5 | 5 | 4 | 17 |
| Scanning push with loaned tablets | Foam-box intake | 4 | 2 | 3 | 3 | 12 |
| Design template adds arch height to offset slump | Shell slump | 3 | 5 | 5 | 2 | 15 |
| New printers with active cooling | Shell slump | 4 | 1 | 1 | 3 | 9 |
Three solutions were chosen. Longer cooling with a tilt addresses the verified slump directly and was proven in the experiment. The foam-box intake check costs little: designers reject boxes with crushed heels or double impressions and ask the clinic to re-press or scan. The scanning push is the most expensive but attacks the larger cause, since foam-box orders produce two-thirds of returns. Adding arch height in the design template was rejected despite its score, because it hides the slump instead of removing it and would have to be retuned whenever the cooling or material changed; new printers were rejected on cost and lead time.
Pilot Design
The cooling and tilt changes were piloted for four weeks on one of the lab's three print lines, about a third of volume, with 14-hour cooling made possible by borrowing racks from the other lines' overflow area. The other two lines continued as before and served as a comparison. Arch deviation was measured on five shells per shift with the fixtured gauge from the Measure phase. Because 60-day returns lag shipping by two months, the pilot also tracked 30-day returns, which last year ran at about 75 percent of the 60-day rate. The intake check began on all orders in the same four weeks, and the scanning push started with the first 60 of the 200 target clinics.
Pilot Results
Pilot line against baseline
| Measure | Baseline | Pilot line |
|---|---|---|
| Mean arch deviation | minus 0.58 mm | minus 0.12 mm |
| Standard deviation | 0.61 mm | 0.41 mm |
| Cp | 0.82 | 1.22 |
| Cpk | 0.50 | 1.12 |
| Expected outside limits | About 6.6% | Under 0.1% |
| 30-day return rate | 5.6% on comparison lines | 3.1% |
The pilot line's mean arch deviation moved to minus 0.12 millimeters, close to the experiment's prediction of minus 0.10, and its standard deviation fell from 0.61 to 0.41, because the tall arches that slumped most now slump least. A two-sample t-test on the pilot and comparison lines' arch deviation gives a p-value far below 0.01. Kotz and Johnson (2002) caution that capability indices from short runs carry wide uncertainty, so the 1.12 will be confirmed over a full quarter, but the change from 0.50 is far larger than that uncertainty. The 30-day return rate on the pilot line was 3.1 percent against 5.6 percent on the comparison lines.
The intake check rejected about 4 percent of foam boxes in the first month, mostly for crushed heels; clinics re-pressed most within two days. Of the first 60 clinics offered tablets, 38 had switched to scanning by the end of the pilot.
Projected Result
With the cooling and tilt on all lines, the pilot's results suggest foam-box orders will return at about 4.4 percent and scanned orders at about 2.1 percent. If the scanning push moves the foam-box share from 53 to 40 percent of orders, the 60-day return rate becomes 0.40 × 4.4 plus 0.60 × 2.1, about 3.0 percent, meeting the charter's goal. At about 98,400 pairs a year, returns would fall from 7,266 to about 2,970.
Annual benefits and first-year costs
| Item | Amount |
|---|---|
| Returns avoided, about 4,296 at $42.26 | $181,500 a year |
| Cooling racks and floor space | $36,000 one time |
| Loaned tablets for 200 clinics | $70,000 one time |
| Clinic training on scanning | $12,000 one time |
| Net first-year benefit | $63,500 |
| Net benefit in later years | About $181,500 a year |
The benefit excludes the value of keeping clinics that would otherwise leave over fit problems, which last year cost about $250,000 in annual sales. Swink and Jacobs (2012), studying firms that adopted Six Sigma, found improvements in operating performance driven largely by reductions in cost, which is the pattern here: most of the gain is avoided rework.
Control Plan
Control plan
| Characteristic | Method and frequency | Limits or standard | Owner | Reaction |
|---|---|---|---|---|
| Arch deviation | Fixtured gauge, 5 shells per shift, X-bar and R chart | Limits from pilot data | Print lead | Stop line, check cooling log and print file |
| Cooling time | Rack timer with unpack lock | 14 hours minimum | Print technician | Shell held until timer clears |
| Print orientation | Locked print template | 30-degree tilt | Design lead | Template change needs quality approval |
| Foam-box intake | Visual check at receipt | Written rejection criteria | Intake designer | Re-request from clinic |
| Weekly return rate | p-chart, about 2,050 pairs a week | 1.9% to 4.1% | Quality engineer | Root cause review within a week |
| Arch gauge | Gauge R&R every six months | Under 20% of tolerance | Quality engineer | Recalibrate, retrain |
Two controls are mistake-proofing rather than charts: the rack timer physically keeps shells from being unpacked early, and the print template cannot be changed without quality approval. Those address the causes directly, so that the charts become a check rather than the only defense.
Control Charts
For the weekly return rate, with the improved center line of 3.0 percent and about 2,050 pairs a week, the p-chart limits are 0.030 plus or minus 3 times the square root of 0.030 × 0.970 / 2,050, or about 1.9 and 4.1 percent. A week above 4.1 percent, or seven weeks in a row above 3.0, triggers a review. The X-bar and R chart for arch deviation will use limits calculated from the first 25 subgroups after full rollout. Woodall (2000) distinguishes the first phase of control charting, in which a stable baseline is established from historical data, from the second, monitoring, and warns that limits set from an unstable or outdated baseline mislead. The chart limits will therefore not be set from the pilot alone and will be recalculated once after three months.
Handover
The project closes when the 60-day return rate has held at or below 3.0 percent for a full quarter. Ownership passes to the vice president of operations as process owner, with the print lead owning the arch chart and the quality engineer owning the p-chart and gauge studies. The Black Belt will review the charts monthly for six months and then hand over completely.
References
Kotz, S., & Johnson, N. L. (2002). Process capability indices: A review, 1992-2000. Journal of Quality Technology, 34(1), 2-19. https://doi.org/10.1080/00224065.2002.11980119
Swink, M., & Jacobs, B. W. (2012). Six Sigma adoption: Operating performance impacts and contextual drivers of success. Journal of Operations Management, 30(6), 437-453. https://doi.org/10.1016/j.jom.2012.05.001
Woodall, W. H. (2000). Controversies and contradictions in statistical process control. Journal of Quality Technology, 32(4), 341-350. https://doi.org/10.1080/00224065.2000.11980013
What the QSO 360 Module 7 instructions ask for
QSO 360 Project Two usually asks students to complete the Improve and Control phases of a DMAIC project. Expect to generate and select solutions that address the verified root causes, often with a selection matrix; plan and run a pilot; compare performance before and after with statistics, capability and the project metric; estimate financial benefits and costs; and then build a control plan specifying what is measured, how often, by whom, the limits and the reaction when a signal appears, with control charts and documentation for handover to the process owner. Strong projects tie each solution to a cause, prove the improvement rather than assuming it, calculate control limits correctly and make sure every control has an owner.
How this QSO 360 Module 7 project two example is built
The project completes DMAIC at Oxbow Orthotic Laboratory, a fictional Kalamazoo lab. Three solutions address the verified causes: 14-hour cooling with a 30-degree tilt, a foam-box intake check and a scanning push for 200 high-volume foam-box clinics with loaned tablets. A four-week pilot on one print line moves mean arch deviation from minus 0.58 to minus 0.12 millimeters, lowers the standard deviation to 0.41 and raises Cpk from 0.50 to 1.12. The projected 60-day return rate is about 3.0 percent, worth about $181,500 a year against $118,000 of first-year costs. The control plan sets an X-bar and R chart, a p-chart on weekly returns and locked settings. Woodall, Kotz and Johnson and Swink and Jacobs support the plan.
Where the QSO 360 Module 7 rubric puts the points
Instructors grading QSO 360 Project Two look at solutions linked to verified root causes, a sound selection method, a well-designed pilot with valid before-and-after comparisons, correct capability and metric calculations, credible financial benefits and costs, a complete control plan with owners and reaction plans, correctly calculated control limits and a clear handover. Projects that score highest show that the pilot, not opinion, proves the improvement and that each control would catch a return of the original causes. Credit drops when solutions address unverified causes, pilots lack a comparison, benefits ignore costs, control limits are confused with specification limits or no one owns the controls. Tables, clarity and APA citations count too.
QSO 360 Module 7 help: the mistakes that cost points
Start from the causes the Analyze phase verified and list solutions for each; score them on effect, cost, time and risk. Pilot the best ones on a small part of the process, with a clear before-and-after comparison on the same measures, and calculate capability and the project metric for both. Estimate annual benefits and one-time and running costs honestly. Then build the control plan: for each critical input and output, say what is measured, how, how often, by whom, the control limits and what to do when a point falls outside them. Calculate control limits from the improved process's data, not from the specifications. A common mistake is declaring victory before the pilot; another is a control plan whose charts nobody is assigned to read.
Get QSO 360 Module 7 written to your instructions
Upload the QSO 360 Project Two guidelines and your Analyze phase results. A writer selects and justifies solutions, designs and reports a pilot with before-and-after statistics and capability, calculates benefits and costs, then builds the control plan, control charts with limits, reaction plans and handover, with research behind each step. Your first QSO 360 project is free and is completed in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 360 papers and related BS Operations Management samples
- QSO 360 Module 1 Discussion: What Six Sigma Means in a Custom Orthotics Lab
- QSO 360 Module 2 Define Phase Assignment: Charter, SIPOC and CTQs for Returned Orthotics
- QSO 360 Module 3 Project One: The Measure Phase Baseline
- QSO 360 Module 4 Discussion: Can We Trust the Arch-Height Gauge?
- QSO 360 Module 5 Hypothesis Testing Assignment: Foam Boxes, Scans and Cooling Time
- QSO 360 Module 6 Discussion: A Designed Experiment on Printing and Cooling
- QSO 360 Module 8 Discussion: Keeping the Gains After the Belts Move On
- INT 113 Module 3 Milestone One: Trade Rules Between Bozeman and Tokyo
- INT 422 Module 5 Milestone Two: Joint Venture, License or Retreat in China
- ACC 202 Module 6 Variance Analysis Assignment: November variances for Cedarline
- QSO 330 Module 6 Discussion: Trust With a Plywood Supplier 8,000 Miles Away
QSO 360 Module 7 questions, answered
Where can I find a free QSO 360 Module 7 Project Two sample?
This page holds the complete QSO 360 Project Two: Improve and Control for returned orthotics at an invented lab, with a pilot and control plan.
What is a control plan in Six Sigma?
A document listing each critical characteristic to monitor, the measurement method, sample size and frequency, control limits, owner and the reaction plan when a signal appears.
How are p-chart control limits calculated?
The center line is the average proportion defective, and each limit sits three standard errors from it, the standard error being the square root of the proportion multiplied by its complement, divided by the sample size.
Are control limits the same as specification limits?
No. Control limits come from the process's own variation and show whether it is stable; specification limits come from customer requirements and show what is acceptable.
Why pilot a solution before full rollout?
To prove with data that the change improves the process, find side effects and problems on a small scale and estimate the benefit before committing full resources.