| Course | QSO 360 Six Sigma Quality Management |
|---|---|
| Module | Module 5 |
| Paper type | undergraduate assignment in the Analyze phase testing suspected causes with a Pareto chart, a chi-square test, a stratified check, a two-sample t-test and a regression |
| Length | About 1,020 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 360 Module 5
Two Causes Out of Eleven: Hypothesis Tests on Returned Orthotics at Oxbow
[Student Name]
Southern New Hampshire University
QSO 360: Six Sigma Quality Management
Hypothesis Testing Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Two Causes Out of Eleven: Hypothesis Tests on Returned Orthotics at Oxbow
Introduction
The Measure phase showed that Oxbow Orthotic Laboratory's shells come out 0.58 millimeters low in the arch on average and that foam-box pairs come back at close to double the rate of scanned ones. The Analyze phase must find out why. This assignment organizes the suspected causes, tests the ones the data can test and identifies which causes go forward to the Improve phase. Each hypothesis was written down before anyone looked at the data, which kept the team from choosing tests to fit the results they had already seen.
Suspected Causes
A fishbone session with the project team and two print technicians produced eleven suspected causes. Under methods: the foam-box intake, the design template's arch smoothing and the cooling time before unpacking. Under machines: printer bed position, printer age and the Monday warm-up already found in the Measure phase. Under materials: the ratio of fresh to recycled nylon powder and the powder lot. Under people: the designer and the inspector. Under environment: humidity in the cooling room.
The Pareto chart of defects tells the team where to focus. Arch height accounts for 4,350 of the 9,464 coded defects, 46 percent; heel cup depth for 20 percent; shell length and width for 15 percent; posting for 11 percent; and top cover bonding for 8 percent. Arch height and heel cup together make up two-thirds of the defects, and both are shape errors in the printed shell, so the analysis concentrates on causes that could change the shell's shape.
Test 1: Intake Method and Returns
Null hypothesis: the 60-day return rate is the same for foam-box and scanned orders. Alternative: the rates differ.
Returns by intake method, last twelve months
| Intake method | Pairs | Returned | Return rate |
|---|---|---|---|
| Foam box | 52,000 | 4,992 | 9.6% |
| 3D scan | 46,400 | 2,274 | 4.9% |
| Total | 98,400 | 7,266 | 7.4% |
A chi-square test of independence on this two-by-two table gives a statistic of about 792 with one degree of freedom, far beyond the critical value of 3.84 at the 5 percent level; the p-value is effectively zero. The null hypothesis is rejected. In practical terms, a foam-box pair is about twice as likely to come back.
Laughton et al. (2002) found that plaster, foam and other ways of capturing a foot's shape gave different results and different repeatability, which makes the intake method a plausible cause rather than only an excuse. But a difference this large could also reflect who uses each method. Larger, newer practices are more likely to scan, and they could also have more experienced staff pressing the boxes they do send.
Checking for Confounding
To test that, the data were split into clinics ordering more than 100 pairs a year and those ordering fewer.
Return rates by intake method and clinic size
| Clinic size | Foam box | 3D scan |
|---|---|---|
| Large clinics | 8.9% of 21,000 pairs | 4.7% of 30,000 pairs |
| Small clinics | 10.1% of 31,000 pairs | 5.3% of 16,400 pairs |
The gap holds within both groups: foam boxes return at about twice the rate of scans in large and small clinics alike. Clinic size explains a little of the overall difference, since small clinics return slightly more with either method, but not the main effect. The intake method stays on the list.
Test 2: Cooling Time and Arch Height
In the Measure phase, a print technician mentioned that shells left in the printer's cooling unit over a long weekend seemed to hold their shape better. The print log identified 60 sampled shells from builds that cooled for about 14 hours rather than the standard 8, because of a holiday.
Null hypothesis: mean arch deviation is the same for shells cooled 8 and 14 hours. Alternative: the means differ.
Arch deviation by cooling time
| Cooling time | Shells | Mean deviation | Standard deviation |
|---|---|---|---|
| 8 hours | 120 | minus 0.61 mm | 0.60 mm |
| 14 hours | 60 | minus 0.22 mm | 0.48 mm |
A two-sample t-test (Student, 1908), in the form that does not assume equal variances, gives t of about 4.7, with a p-value well under 0.001. The null hypothesis is rejected. The practical difference, about 0.39 millimeters, is two-thirds of the process's offset from target, so cooling time could account for most of the low arches.
The comparison is observational, not an experiment: the long-cooled builds happened over a holiday, when the cooling room was also cooler and drier. That is why the Improve phase will test cooling time in a designed experiment rather than adopt it on this evidence alone.
Test 3: Arch Height and Deviation
A regression of arch deviation on the prescribed arch height, using the 250 shells from the capability study, gives deviation = 0.07 minus 0.031 × prescribed arch height in millimeters, with a slope significantly different from zero and an R-squared of 0.24. A shell prescribed at 14 millimeters comes out about 0.36 millimeters low, and one at 28 millimeters about 0.80 low. Taller arches lose more height, which is what would happen if warm nylon slumps under its own weight before it sets, and it fits the cooling time result. The relationship also explains why the Measure phase found the spread slightly too wide: prescribed arch heights vary from patient to patient, and the slump varies with them.
Causes Not Supported
Several suspected causes were tested and not supported. Return rates did not differ significantly between the three designers or between the two inspectors. A one-way ANOVA of arch deviation across the four printers found no significant difference, and powder lot and the fresh-to-recycled ratio, which varied within the plant's normal range, showed no relationship with deviation. Humidity could not be tested separately from cooling time with the data available. Montgomery and Woodall (2008) describe the Analyze phase as the step where the team uses data to move from many possible causes to a few verified ones, and dropping these causes matters as much as confirming the others, because they will not consume improvement effort.
Conclusion
Two causes go forward to the Improve phase: cooling time, which appears to explain most of the low arches and their link to arch height, and the foam-box intake, which doubles the return rate regardless of clinic size. The first will be tested in a designed experiment; the second requires work with clinics.
References
Laughton, C., McClay Davis, I., & Williams, D. S. (2002). A comparison of four methods of obtaining a negative impression of the foot. Journal of the American Podiatric Medical Association, 92(5), 261-268. https://doi.org/10.7547/87507315-92-5-261
Montgomery, D. C., & Woodall, W. H. (2008). An overview of Six Sigma. International Statistical Review, 76(3), 329-346. https://doi.org/10.1111/j.1751-5823.2008.00061.x
Student. (1908). The probable error of a mean. Biometrika, 6(1), 1-25. https://doi.org/10.1093/biomet/6.1.1
What the QSO 360 Module 5 instructions ask for
The QSO 360 Module 5 assignment generally asks students to analyze data to identify root causes in a Six Sigma project. Expect to organize suspected causes, often with a fishbone diagram or Pareto chart; state null and alternative hypotheses; choose appropriate tests, such as a chi-square test for proportions, a t-test or ANOVA for means and correlation or regression for relationships; interpret test statistics and p-values; and conclude which causes are supported. Strong assignments match each test to the type of data, state hypotheses before results, distinguish statistical from practical significance, check whether a third factor could explain an apparent effect and say plainly which suspected causes the data do not support. Results should lead directly to the Improve phase.
How this QSO 360 Module 5 hypothesis testing assignment example is built
The assignment tests causes of returned orthotics at Oxbow Orthotic Laboratory, a fictional Kalamazoo lab. A fishbone session lists eleven suspected causes and a Pareto chart puts arch height at 46 percent of 9,464 coded defects. A chi-square test finds foam-box orders returned at 9.6 percent against 4.9 percent for scans, chi-square about 792 with one degree of freedom, and stratifying by clinic size shows the gap is not explained by larger clinics scanning more. A two-sample t-test on shells cooled 14 hours against the standard 8 finds mean arch deviation of minus 0.22 against minus 0.61 millimeters, t about 4.7. A regression shows taller arches lose more height. Student, Laughton and colleagues and Montgomery and Woodall support the analysis.
Where the QSO 360 Module 5 rubric puts the points
The QSO 360 hypothesis testing assignment is commonly marked on organizing suspected causes, stating hypotheses clearly, choosing tests suited to the data, calculating and interpreting statistics and p-values correctly, judging practical as well as statistical significance, checking for confounding and drawing conclusions that lead to the Improve phase. The strongest assignments report which suspected causes were not supported and why. Credit drops when tests are mismatched to data, p-values are misread as the probability that the hypothesis is true, a significant difference is accepted without asking what else could explain it or conclusions go beyond the data. Tables, clear writing and APA citations complete the grade.
QSO 360 Module 5 help: the mistakes that cost points
Start by listing suspected causes with the team, then decide which can be tested with data you have or can collect. For each, write a null hypothesis, usually that there is no difference or relationship, and an alternative. Choose the test from the type of data: return rates and other proportions call for a chi-square test; averages of measurements call for a t-test or ANOVA; two continuous variables call for correlation or regression. Report the statistic, the p-value and the size of the effect in practical terms. Then ask whether a third factor could explain the result, and stratify to check. A common mistake is testing only the causes people already believe; another is stopping at the p-value.
Get QSO 360 Module 5 written to your instructions
Share the QSO 360 Module 5 instructions and your data or scenario. A writer lists the suspected causes, states null and alternative hypotheses, chooses and runs the right tests, chi-square, t-test, ANOVA or regression, reports the statistics, p-values and practical size of each effect, checks for confounding and states which causes go forward, citing research. Your first QSO 360 paper is free, delivered in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 360 papers and related BS Operations Management samples
- QSO 360 Module 1 Discussion: What Six Sigma Means in a Custom Orthotics Lab
- QSO 360 Module 2 Define Phase Assignment: Charter, SIPOC and CTQs for Returned Orthotics
- QSO 360 Module 3 Project One: The Measure Phase Baseline
- QSO 360 Module 4 Discussion: Can We Trust the Arch-Height Gauge?
- QSO 360 Module 6 Discussion: A Designed Experiment on Printing and Cooling
- QSO 360 Module 7 Project Two: Improve and Control
- QSO 360 Module 8 Discussion: Keeping the Gains After the Belts Move On
- QSO 320 Module 4 Discussion: Should We Believe 1,050 Coils of Garland?
- QSO 330 Module 3 Project One: Mapping and Analyzing the Cabinet Supply Chain
- FIN 485 Module 8 Discussion: Implementation and the First Review
- QSO 345 Module 2 Project Charter Assignment: Authorizing the Harrow Mutual Move
QSO 360 Module 5 questions, answered
Where can I find a free QSO 360 Module 5 Hypothesis Testing Assignment sample?
The complete QSO 360 Module 5 assignment is on this page: Pareto, chi-square, t-test and regression on returns at an invented orthotics lab.
What is a null hypothesis?
The statement that there is no difference or relationship, such as equal return rates for two intake methods, which a test tries to reject with data.
When is a chi-square test used?
To test whether proportions or counts differ across categories, such as whether the return rate depends on the intake method.
What does a p-value mean?
The probability of seeing a result at least as extreme as the one observed if the null hypothesis were true; it is not the probability that the null is true.
What is confounding?
When a third factor is related to both the suspected cause and the outcome, so an apparent effect may really be due to that factor.