QSO 360 Module 3 Project One Example

Reviewed by Portia Lambrick, MBA

This QSO 360 Module 3 Project One sample completes the Measure phase of a Six Sigma project with a data collection plan, a measurement system analysis, a process capability study and the baseline sigma level. SNHU QSO 360 (QSO-360) asks for this baseline in Module 3 of its Six Sigma course for BS Operations Management students. The process is the making of custom foot orthotics at Oxbow Orthotic Laboratory, an invented Kalamazoo lab. The project finds the arch-height gauge unfit for use, fixes it, then shows that shells come out 0.58 millimeters low on average, with a Cpk of 0.50, before setting the baseline the project will be judged against.

CourseQSO 360 Six Sigma Quality Management
ModuleModule 3
Paper typeundergraduate project completing the Measure phase of a Six Sigma project with a data collection plan, measurement system analysis, process capability and baseline sigma level
LengthAbout 1,000 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 360 Module 3

1

The Gauge Failed First: Measurement System Analysis, Capability and Baseline for Oxbow's Orthotic Arches

[Student Name]

Southern New Hampshire University

QSO 360: Six Sigma Quality Management

Project One: Measure Phase

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe gauge study, capability data and baseline for Oxbow Orthotic Laboratory in this QSO 360 project are fictional.
2

The Gauge Failed First: Measurement System Analysis, Capability and Baseline for Oxbow's Orthotic Arches

Introduction

The Define phase set a goal of cutting Oxbow Orthotic Laboratory's 60-day return rate from 7.4 to 3.0 percent and identified arch height as the requirement behind 46 percent of coded defects. The Measure phase has three jobs: to make sure the data are trustworthy, to describe how the process performs today and to set the baseline against which improvements will be judged. This project presents the data collection plan, a measurement system analysis of the arch-height gauge, a stability check, a capability study for arch height and the baseline sigma level.

What this page is doingSays what the Measure phase must do.
3

Data Collection Plan

Data collection plan

MeasureOperational definitionSource and sampleOwner
60-day return ratePairs returned within 60 days of shipping, divided by pairs shipped that monthReturns system, all pairsCustomer service
Coded defectsEach return coded against the five CTQs by the inspector who opens itAll returnsInspection
Arch height deviationMeasured arch height at the marked apex minus the prescribed height, in millimetersFive shells per shift, chosen at random, before finishingInspection
Intake methodFoam box or 3D scanOrder system, all pairsDesign
Cooling timeHours from end of print to unpackingPrint log, all buildsPrint room

Sampling five shells per shift gives about 15 shells a day across three shifts, enough to see a quarter-millimeter shift in the mean within a week, at a cost of about 40 minutes of inspector time a day. Returns and coded defects are recorded for every pair, because they come from the returns system at no extra cost. Arch height is measured before finishing so that posting and covers do not affect it. The intake method and cooling time are recorded now, although they will not be analyzed until the Analyze phase, because collecting them later would lose the link to each shell.

What this page is doingDefines what will be measured and how.
4

Measurement System Analysis

Burdick et al. (2003) review methods for assessing measurement systems and emphasize separating repeatability, the variation when one appraiser measures the same part repeatedly, from reproducibility, the variation between appraisers, and judging the total against both the tolerance and the process variation. The team ran a crossed study: ten shells chosen to span the range of arch heights, three inspectors and two trials each, in random order, with the inspectors unaware which shell they were measuring.

Gauge R&R results for arch height

MeasureFirst studyAfter fixture
Repeatability standard deviation0.12 mm0.07 mm
Reproducibility standard deviation0.14 mm0.05 mm
Gauge R&R standard deviation0.18 mm0.09 mm
Percent of tolerance, 6 SD over 3.0 mm37%17%
Number of distinct categories49

The first study failed. A gauge using 37 percent of the 3.0-millimeter tolerance cannot reliably sort shells near the limits, and four distinct categories mean it can barely tell shells apart. Watching the inspectors showed why: each rested the curved shell on the flat surface plate in a slightly different way and found the arch apex by eye, and one pressed the shell down while measuring.

The team built a three-point locating fixture that seats every shell the same way and marked the apex on the print file so it appears on each shell. The repeated study gave 17 percent of tolerance and nine distinct categories. Under the usual guidelines that is acceptable for this purpose, though not excellent, and the fixture will be used for all arch measurements from now on.

What this page is doingTests the arch-height gauge.
5

Stability

With the fixture in place, inspectors measured five shells per shift for two weeks, 50 subgroups. An X-bar and R chart showed the process in statistical control except for two subgroups, both on Monday mornings, when shells printed in the first build after the weekend shutdown came out lower than the rest. The cause, a printer that had cooled over the weekend, was confirmed and a warm-up build added; the two subgroups were removed from the capability study as a special cause that has been addressed.

What this page is doingChecks the process before capability.
6

Process Capability

Kotz and Johnson (2002), reviewing a decade of research on capability indices, stress that Cp and Cpk assume a stable, roughly normal process and that each index answers a different question: Cp, whether the spread would fit the tolerance if the process were centered, and Cpk, whether it fits given where the process actually is. The arch height data from 48 subgroups, 240 shells, plus ten more from a confirmation sample, gave 250 shells.

Capability of arch height deviation

StatisticValue
Specification limitsminus 1.5 to plus 1.5 mm
Mean deviationminus 0.58 mm
Standard deviation0.61 mm
Cp0.82
Cpk0.50
Expected below lower limitAbout 6.6%
Expected above upper limitUnder 0.1%

Cp of 0.82 says that even a perfectly centered process would spread slightly wider than the tolerance, so the variation itself must shrink. Cpk of 0.50, much lower, says the larger problem is centering: shells come out 0.58 millimeters below the prescription on average. Almost every out-of-specification shell is too low, which matches the podiatrists' complaints that arches are too flat. Moving the mean to zero without changing the spread would raise Cpk to 0.82 and reduce shells outside the limits from about 6.6 percent to about 1.4 percent.

What this page is doingMeasures how the arch performs against its limits.
7

Baseline

Montgomery and Woodall (2008) note that defects per million opportunities and sigma levels allow comparison across processes but depend heavily on how opportunities are counted. The baseline therefore states its basis: 9,464 coded defects on 98,400 pairs with five CTQ opportunities each, giving about 19,200 defects per million opportunities, roughly 3.6 sigma under the conventional 1.5 sigma shift. The baseline return rate is 7.4 percent, with 4,992 returns among 52,000 foam-box pairs and 2,274 among 46,400 scanned pairs. Arch height Cpk is 0.50.

What this page is doingSets the figures the project will be judged against.
8

Conclusion

The Measure phase found the gauge inadequate and fixed it before trusting any baseline. With reliable data, arch height is stable but off center by 0.58 millimeters and slightly too variable, and the return rate shows a large gap between foam-box and scanned orders. The Analyze phase will test why shells come out low and why foam-box orders return almost twice as often.

What this page is doingSummarizes the Measure phase.
9

References

Burdick, R. K., Borror, C. M., & Montgomery, D. C. (2003). A review of methods for measurement systems capability analysis. Journal of Quality Technology, 35(4), 342-354. https://doi.org/10.1080/00224065.2003.11980232

Kotz, S., & Johnson, N. L. (2002). Process capability indices: A review, 1992-2000. Journal of Quality Technology, 34(1), 2-19. https://doi.org/10.1080/00224065.2002.11980119

Montgomery, D. C., & Woodall, W. H. (2008). An overview of Six Sigma. International Statistical Review, 76(3), 329-346. https://doi.org/10.1111/j.1751-5823.2008.00061.x

What the QSO 360 Module 3 instructions ask for

QSO 360 Project One usually asks students to complete the Measure phase of a DMAIC project. Expect to write a data collection plan stating what will be measured, how, by whom and how often; validate the measurement system, often with a gauge repeatability and reproducibility study; check whether the process is stable; calculate process capability, such as Cp and Cpk, against the specification limits; and establish the baseline performance, often as defects per million opportunities and a sigma level. Strong projects test the gauge before trusting the data, interpret the gauge study against the tolerance, confirm stability before calculating capability, explain what the capability indices reveal about centering and spread and connect the baseline to the goal in the charter.

How this QSO 360 Module 3 project one example is built

The project measures the return problem at Oxbow Orthotic Laboratory, a fictional Kalamazoo lab making custom foot orthotics. The data collection plan covers returns, coded defects and arch height on sampled shells. A gauge study of ten shells, three inspectors and two trials finds the arch-height gauge uses 37 percent of the tolerance with four distinct categories, so a three-point fixture is built and the study repeated, giving 17 percent and nine categories. A control chart shows arch height stable apart from Monday warm-ups. On 250 shells the mean is 0.58 millimeters low, Cp is 0.82 and Cpk 0.50, with about 6.6 percent below the lower limit. The baseline is about 19,200 defects per million opportunities, roughly 3.6 sigma.

Where the QSO 360 Module 3 rubric puts the points

Instructors grading QSO 360 Project One look at a complete data collection plan, a correctly run and interpreted measurement system analysis, appropriate action when the gauge is inadequate, a check of process stability before capability, correct calculation and interpretation of Cp and Cpk, a baseline in DPMO and sigma level with its arithmetic and a link to the charter's goal. Projects that score highest explain why Cpk sits below Cp and what that reveals about centering. Credit drops when capability is calculated on untested data, the gauge study is reported without criteria, an unstable process is given a capability index, Cp and Cpk are confused or the baseline is not tied to the goal. Tables, clarity and APA citations count too.

QSO 360 Module 3 help: the mistakes that cost points

Start with a data collection plan: what you will measure, the operational definition, the sampling plan and who records the data. Before collecting baseline data, test the gauge: have several appraisers measure the same parts more than once and compare the gauge's variation with the tolerance; under 10 percent is good, over 30 percent is not acceptable, and fewer than five distinct categories means the gauge cannot tell parts apart. Next, plot the data on a control chart to check stability. Then calculate Cp, which compares the tolerance with the spread, and Cpk, which also accounts for centering. Finish with DPMO and the sigma level. A common mistake is calculating capability before checking the gauge; another is ignoring an off-center mean.

Get QSO 360 Module 3 written to your instructions

Upload the QSO 360 Project One guidelines and your process data. A writer builds the data collection plan, runs and interprets the gauge R&R with percent of tolerance and distinct categories, checks stability with a control chart, calculates Cp, Cpk and expected out-of-spec rates and sets the baseline DPMO and sigma level. Your first QSO 360 project is free, finished in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 360 papers and related BS Operations Management samples

QSO 360 Module 3 questions, answered

Where can I find a free QSO 360 Module 3 Project One sample?

This page holds the complete QSO 360 Project One: gauge R&R, capability and a baseline sigma level for an invented orthotics lab.

What is a gauge R&R study?

A study measuring how much of the observed variation comes from the measurement system, split into repeatability, the gauge itself, and reproducibility, differences between appraisers.

What is an acceptable gauge R&R?

Under 10 percent of the tolerance is generally acceptable, 10 to 30 percent may be acceptable depending on the use, and over 30 percent is unacceptable.

How do Cp and Cpk differ?

Cp asks whether the spread would fit inside the tolerance if the process were centered; Cpk adds where the mean actually sits, so it drops whenever the process drifts off center.

Why check stability before capability?

Capability indices assume a stable process; if special causes are present, the indices describe no consistent process and predict nothing.