QSO 360 Module 2 Define Phase Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 360 Module 2 Define Phase Assignment sample completes the Define phase of a Six Sigma project with a charter, a SIPOC, voice of the customer and a critical-to-quality tree. SNHU QSO 360 (QSO-360) assigns the Define phase in Module 2 of a Six Sigma course taught within the BS Operations Management. The project belongs to Oxbow Orthotic Laboratory, an invented Kalamazoo lab whose custom foot orthotics come back for adjustment or remake 7.4 percent of the time. The paper states the problem in numbers, sets a goal and scope, maps the process at a high level and turns podiatrists' complaints into measurable requirements.

CourseQSO 360 Six Sigma Quality Management
ModuleModule 2
Paper typeundergraduate assignment completing the Define phase of a Six Sigma project with a charter, SIPOC, voice of the customer and critical-to-quality tree
LengthAbout 1,080 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 360 Module 2

1

From "It Doesn't Fit" to 1.5 Millimeters: The Define Phase for Returned Orthotics at Oxbow

[Student Name]

Southern New Hampshire University

QSO 360: Six Sigma Quality Management

Define Phase Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe charter, interviews and figures for Oxbow Orthotic Laboratory in this QSO 360 assignment are invented.
2

From "It Doesn't Fit" to 1.5 Millimeters: The Define Phase for Returned Orthotics at Oxbow

Introduction

Oxbow Orthotic Laboratory has known for years that too many orthotics come back, but the problem has been discussed as complaints from individual clinics rather than measured. This assignment completes the Define phase of a DMAIC project on returned orthotics: the project charter, a SIPOC map of the process, the voice of the customer from podiatrists and the translation of their needs into critical-to-quality requirements that the Measure phase can test.

What this page is doingPlaces the Define phase in the project.
3

Project Charter

Business case. Returns cost Oxbow about $307,000 a year in remakes, adjustments and shipping, and podiatrists who see repeated returns move their accounts. Twenty-three clinics that left last year cited fit problems in their exit calls, about $250,000 in annual sales.

Problem statement. Of about 98,400 pairs shipped in the twelve months to September, 7,266, or 7.4 percent, were returned within 60 days for adjustment or remake. The rate has been between 6.9 and 7.9 percent in every quarter for two years.

Goal. Reduce the 60-day return rate to 3.0 percent or less within six months of the charter's approval, measured over the following quarter.

Scope. In scope: every step from receipt of the clinic's foam-box impression or 3D scan to shipping, including design, printing, cooling, finishing, posting, top covers and final inspection. Out of scope: the clinics' own casting or scanning technique, which Oxbow can influence but not control, pricing and shipping carriers.

Benefits. At an average cost of about $42 per return, cutting returns from 7,266 to about 2,950 a year would save about $182,000 a year, before any gain from keeping clinics.

Team and timeline. The champion is the vice president of operations. A Black Belt from the quality department leads the project with a print technician, a finishing lead, a designer, an inspector and a customer service representative who handles returns. The DMAIC phases are planned at four, six, six, six and four weeks.

What this page is doingStates the case, problem, goal and scope.
4

SIPOC

SIPOC for orthotic production

SuppliersInputsProcessOutputsCustomers
Podiatry clinicsFoam-box impressions, 3D scans, prescriptions1. Receive and digitize the impression or scanDigital foot modelDesign team
Design software vendorDesign templates2. Design the shell to the prescriptionPrint filePrint room
Nylon powder supplierPowder, printer settings3. Print the shellsPrinted shellsCooling area
FacilitiesCooling racks, time4. Cool and unpackCooled shellsFinishing
Materials suppliersPosts, top covers, adhesives5. Finish, post and coverFinished pairsInspection
Quality departmentGauges, standards6. Inspect and shipShipped pairsClinics and patients

The SIPOC deliberately stops at six steps. Its main use is to show that two inputs, the impression and the cooling time, come from outside the steps people usually think of as production, so the team includes the designer who receives impressions and the print technician who unpacks the cooled shells.

What this page is doingMaps the process at a high level.
5

Voice of the Customer

Antony (2006) observes that in service and custom work, defining what the customer considers critical is often harder than measuring it, because complaints arrive in the customer's language rather than in specifications. The team therefore gathered three sources: 1,200 return notes written by clinics in the last year, 40 telephone interviews with podiatrists, half from high-return clinics and half from low-return ones, and the exit calls from clinics that left. The statements were sorted into groups.

Grouped voice-of-the-customer statements

Customer statementNeedShare of return notes
"The arch is too low" or "too flat, patient still has pain"Arch matches the prescription46%
"Heel slips" or "heel cup too shallow"Heel cup holds the heel20%
"Doesn't fit in the shoe" or "too long"Shell fits the shoe15%
"Post is wrong"Posting matches the prescription11%
"Top cover peeling"Cover stays bonded8%
"Took two weeks"Fast turnaroundInterviews only

Arch complaints dominate the returns, and almost every complaint is that the arch is lower than prescribed, not higher, which suggests a consistent direction of error rather than random variation. Turnaround appears in interviews but rarely in returns, so it is noted as a secondary requirement for the project not to make worse.

What this page is doingGathers the podiatrists' words.
6

CTQ Tree

CTQ tree for "the orthotic fits"

NeedDriverCTQ requirement
Arch matches the prescriptionArch height at the apexWithin 1.5 mm of the prescribed height
Heel cup holds the heelHeel cup depthWithin 2.0 mm of the prescribed depth
Shell fits the shoeShell length and widthWithin 3.0 mm of the shoe size template
Posting matches the prescriptionRearfoot post angleWithin 1 degree of the prescribed angle
Cover stays bondedTop cover peel strengthPasses 50-cycle flex test

The limits came from the podiatrists' interviews and the lab's own clinical advisor, who reported that patients usually notice an arch difference of about 2 millimeters, so 1.5 millimeters leaves a small margin. These five CTQs are the five opportunities used to calculate the lab's sigma level.

What this page is doingTurns needs into measurable requirements.
7

Goal and Method

Linderman et al. (2003) argue that Six Sigma's results depend partly on goals that are specific and challenging and are pursued through a disciplined method. A goal of 3.0 percent is challenging: it more than halves the rate that has held for two years. It is not set at six sigma, which would mean almost no returns, because no one yet knows how much of the problem comes from clinics' impressions, which are out of scope. Arumugam et al. (2013), in a study of Six Sigma project teams, found that project success was linked to the learning and knowledge creation the teams achieved, which depended on the resources and structured method they had. The charter therefore gives the team protected time, half-days each week, and access to production data, rather than asking them to fit the project around their jobs.

What this page is doingExplains why the goal is set this way.
8

Risks to the Project

The main risks are that data on returns may be incomplete, since some clinics adjust orthotics themselves without returning them; that the 60-day lag between shipping and return will slow the Measure and Control phases; and that the team may jump to the familiar explanation, poor impressions from clinics, before the data are in. To address the lag, the team will also track 30-day returns and in-house inspection failures as early indicators.

What this page is doingNotes what could derail it.
9

Conclusion

The Define phase turns a long-standing complaint into a measured problem: 7.4 percent of pairs returned, mostly because arches are lower than prescribed. The charter sets a goal of 3.0 percent in six months, the SIPOC identifies impressions and cooling as inputs worth watching and the CTQ tree gives the Measure phase five requirements to test.

What this page is doingSummarizes the Define phase.
10

References

Antony, J. (2006). Six sigma for service processes. Business Process Management Journal, 12(2), 234-248. https://doi.org/10.1108/14637150610657558

Arumugam, V., Antony, J., & Kumar, M. (2013). Linking learning and knowledge creation to project success in Six Sigma projects: An empirical investigation. International Journal of Production Economics, 141(1), 388-402. https://doi.org/10.1016/j.ijpe.2012.09.003

Linderman, K., Schroeder, R. G., Zaheer, S., & Choo, A. S. (2003). Six Sigma: A goal-theoretic perspective. Journal of Operations Management, 21(2), 193-203. https://doi.org/10.1016/S0272-6963(02)00087-6

What the QSO 360 Module 2 instructions ask for

The QSO 360 Module 2 assignment usually asks students to complete the Define phase of a DMAIC project. Expect to write a project charter with a business case, a problem statement, a measurable goal, scope, expected benefits, a timeline and team roles; build a SIPOC diagram listing suppliers, inputs, process steps, outputs and customers; gather voice-of-the-customer information; and translate it into critical-to-quality requirements, often in a CTQ tree with measurable specifications. Strong assignments state the problem with data rather than causes or solutions, set a specific goal with a date, keep scope manageable, show the process at a high level in five to seven steps and turn vague customer statements into requirements that can be measured.

How this QSO 360 Module 2 define phase assignment example is built

The assignment defines the DMAIC project at Oxbow Orthotic Laboratory, a fictional Kalamazoo lab making about 98,400 pairs of custom foot orthotics a year. The charter states that 7.4 percent of pairs came back within 60 days last year, costing about $307,000, and sets a goal of 3.0 percent within six months, worth about $182,000 a year. Scope runs from receipt of the impression or scan to shipping. The SIPOC covers clinics, design, printing, cooling, finishing and inspection. Interviews with 40 podiatrists and 1,200 return notes become a CTQ tree, from "it doesn't fit" to arch height within 1.5 millimeters of the prescription. Linderman and colleagues, Antony and Arumugam and colleagues guide the work.

Where the QSO 360 Module 2 rubric puts the points

The QSO 360 Define phase assignment is commonly scored on a clear business case, a problem statement in measurable terms without assumed causes, a specific and time-bound goal, appropriate scope, credible benefits, defined roles, an accurate SIPOC at the right level of detail, voice-of-the-customer data gathered from real sources and CTQs with measurable specifications. The strongest assignments show how each CTQ traces back to customer statements. Credit drops when the problem statement contains a solution, the goal has no date or number, scope covers the whole company, the SIPOC becomes a detailed flowchart or CTQs stay vague. Tables, clarity and APA citations complete the grade.

QSO 360 Module 2 help: the mistakes that cost points

Begin with the problem in numbers: what is wrong, how often, since when and what it costs. Do not include causes or solutions; those come later. Set a goal with a number and a date. Draw boundaries around the process you will study, list the team and the sponsor and estimate the benefit. Then build a SIPOC: list five to seven high-level steps first, then the outputs and customers, then the inputs and suppliers. Gather the customer's words from complaints, interviews or surveys, group them into needs and turn each need into a measurable requirement with a limit. A common mistake is writing the problem statement as "we need a new machine"; another is a CTQ such as "good quality" that nobody can measure.

Get QSO 360 Module 2 written to your instructions

Share the QSO 360 Module 2 instructions and describe your process and problem. A writer drafts the project charter with a problem statement in numbers, a goal, scope, benefits and team, maps the SIPOC, gathers and sorts voice-of-the-customer statements and builds the CTQ tree with measurable limits, citing Six Sigma research. Your first QSO 360 paper is free and comes back finished in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 360 papers and related BS Operations Management samples

QSO 360 Module 2 questions, answered

Where can I find a free QSO 360 Module 2 Define Phase Assignment sample?

The complete QSO 360 Module 2 assignment is on this page: charter, SIPOC, voice of the customer and CTQ tree for an invented orthotics lab.

What is a Six Sigma project charter?

A one- or two-page document stating the business case, problem, goal, scope, benefits, timeline and team for a DMAIC project, approved by the sponsor or champion.

What is a SIPOC diagram?

A high-level map of a process listing its suppliers, inputs, process steps, outputs and customers, used in the Define phase to set boundaries and identify stakeholders.

What is a CTQ tree?

A diagram that breaks a broad customer need into specific drivers and then into measurable requirements with specification limits.

What makes a good problem statement?

It describes what is wrong, where and how often, its impact and since when, in measurable terms, without assuming causes or proposing solutions.