QSO 489 Module 5 Discussion Example

Reviewed by Portia Lambrick, MBA

This QSO 489 Module 5 Discussion sample analyzes the people affected by proposed operational changes and how to involve them. SNHU QSO 489 (QSO-489) turns to stakeholders and change in Module 5 of the BS Operations Management capstone, before any recommendation is final. The changes are those the analysis at Copperline Finishing Company, an invented powder coating job shop in Muncie, Indiana, points toward: sequencing colors, capping work released to the floor and testing the washer daily. The post names who gains and who loses, including operators who would lose Saturday overtime, and sets out how each group would be brought into the design.

CourseQSO 489 Capstone in Operations Management
ModuleModule 5
Paper typeundergraduate discussion post analyzing the people affected by proposed operational changes and how to involve them
LengthAbout 330 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 489 Module 5

1

Module Five Discussion

Who Loses Saturday

The current-state analysis at Copperline points toward three changes: grouping colors on the conveyor line, capping the work released to the floor and titrating the washer bath every day. Each looks simple on paper. Each changes somebody's job.

What this page is doingThe changes.
2

Booth leads now follow a printed list in due-date order. Under color sequencing, they would decide each morning how to group jobs within a one-day window, which adds judgment and responsibility. The scheduler's spreadsheet would give way to a rule: a new job is released only when the number of racks on the floor falls below a limit. Salespeople, who now promise rush jobs freely, would find that a rush job must take an expedite slot. Lab techs would titrate daily instead of weekly. Customers might see a job held up to a day so it can run with others of its color. The hardest effect falls on line operators: fixing the constraint should end most Saturday shifts, and a typical operator earns about $4,000 a year from them.

What this page is doingWho is affected.
3

Every one of those groups has a reasonable objection. Bessant et al. (2001) describe continuous improvement as behavior organizations build in stages, through routines people practice and trust, not as a program announced from above. Holweg (2007) traces how lean production at Toyota developed over decades through learning on the shop floor, which suggests that a sequencing rule written in the office will fail if booth leads did not shape it. Shah and Ward (2003) found that lean practices work as bundles, including human resource practices, not as isolated tools.

What this page is doingWhy resistance makes sense.
4

Booth leads would design the color wheel and the grouping rules in a two-week pilot. Sales would get one expedite slot a day on the conveyor line. Part of the overtime savings, perhaps a third, would be paid as a quarterly bonus tied to on-time delivery, so operators gain when the shop runs well during the week.

What this page is doingWhat I would propose.
5

Which group stands to lose the most from your recommendations, and what would you offer them?

What this page is doingFor classmates.
6

References

Bessant, J., Caffyn, S., & Gallagher, M. (2001). An evolutionary model of continuous improvement behaviour. Technovation, 21(2), 67-77. https://doi.org/10.1016/S0166-4972(00)00023-7

Holweg, M. (2007). The genealogy of lean production. Journal of Operations Management, 25(2), 420-437. https://doi.org/10.1016/j.jom.2006.04.001

Shah, R., & Ward, P. T. (2003). Lean manufacturing: Context, practice bundles, and performance. Journal of Operations Management, 21(2), 129-149. https://doi.org/10.1016/S0272-6963(02)00108-0

What the QSO 489 Module 5 instructions ask for

The QSO 489 Module 5 discussion usually asks students to consider the human side of their capstone recommendations: who is affected, how they will respond and how they should be involved. Strong posts identify each group affected, including customers, explain what each gains or loses in concrete terms, such as pay, autonomy or workload, anticipate where resistance will come from and why it is reasonable, propose ways to involve people in designing the change and consider how gains could be shared. They also connect the analysis to research on change, improvement and lean practice. A useful reply asks a classmate which group stands to lose the most from their recommendations and what they would offer that group.

How this QSO 489 Module 5 discussion example is built

The post maps who would be affected by the changes the analysis points toward at Copperline Finishing Company, a fictional powder coating job shop in Muncie, Indiana. Booth leads would sequence colors instead of following a due-date list, the scheduler's spreadsheet would give way to a release limit, salespeople would lose some freedom to promise rush jobs, lab techs would titrate daily and line operators stand to lose Saturday overtime worth about $4,000 a year each. Customers might see a job held a day for a color group. The post proposes letting booth leads design the color wheel, keeping one expedite slot a day for sales and sharing part of the savings. Bessant and colleagues, Holweg and Shah and Ward support the approach.

Where the QSO 489 Module 5 rubric puts the points

The QSO 489 Module 5 thread is graded on a complete list of affected groups, concrete gains and losses for each, honest anticipation of resistance, practical ways to involve people in design, attention to sharing gains, studies that inform the approach and replies that ask which group loses most from a classmate's plan. The best posts treat resistance as information rather than obstruction. Posts lose marks for listing stakeholders without stakes, assuming everyone will welcome the change, ignoring pay effects or replying with agreement only. Grammar and APA citations count too.

QSO 489 Module 5 help: the mistakes that cost points

Start with each change you expect to recommend and ask who does their job differently because of it. For each group, write what they gain and lose: pay, overtime, control over their work, status, workload or convenience. Expect resistance where people lose something they value, and treat their objections as information about how the change could fail. Then propose how each group could help shape the change, such as designing a new procedure, piloting it or setting its rules, and whether some of the savings should be shared. Include customers. A common mistake is treating stakeholders as an audience to be persuaded after the design is finished; another is ignoring the money people stand to lose. Close by asking classmates which group loses most.

Get QSO 489 Module 5 written to your instructions

Paste the QSO 489 Module 5 prompt and describe the changes you are considering. A writer identifies everyone the changes would affect, what each gains or loses, how resistance would show up and how each group could help design the change, using research on improvement and change, and asks QSO 489 classmates a question. Your first QSO 489 post is free and is ready within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 489 papers and related BS Operations Management samples

QSO 489 Module 5 questions, answered

Where can I find a free QSO 489 Module 5 Discussion sample?

This page holds the full QSO 489 Module 5 post: the people affected by operational changes at an invented powder coating job shop.

Why involve employees in operational changes?

Because they understand the work in detail, can spot problems in a design and are more likely to sustain changes they helped create.

How should loss of overtime be handled in an improvement project?

Openly, by acknowledging the pay effect, considering ways to share savings and offering other opportunities, rather than hoping workers will not notice.

What is continuous improvement behavior?

The routine of employees identifying and solving problems in their own work, which organizations develop gradually through practice, support and structure.

How do customers become stakeholders in operational changes?

Changes to sequencing, lead times or ordering rules alter what customers experience, so their needs and possible objections should be considered in the design.